HomeMy WebLinkAbout05.a. Receive update on sludge loading and hauling for the Emergency Sludge Loadout Facility Upgrades, District Project 7348A Page 1 of 9 Item 5.a. CENTRAL SAN July 7, 2020 TO: ENGINEERING AND OPERATIONS COMMITTEE FROM: EDGAR J. LOPEZ, CAPITAL PROJECTS DIVISION MANAGER REVIEWED BY: JEAN-MARC PETIT, DIRECTOR OF ENGINEERING AND TECHNICAL SERVICES ROGER S. BAILEY, GENERAL MANAGER SUBJECT: RECEIVE UPDATE ON SLUDGE LOADING AND HAULING FOR THE EMERGENCYSLUDGE LOADOUT FACILITY UPGRADES, DISTRICT PROJECT 7348A The Emergency Sludge Loadout Facility Upgrades, District Project 7348A is near construction completion and acceptance. The project includes installing new loading and isolation gates, improved ventilation and odor control, and new control systems to operate the facility. As part of the project, the facility underwent several modes of testing including actual sludge loading and hauling. Central San staff and the contractor, Auburn Constructors, LLC, spent three days, from June 23 to 25, loading and hauling approximately 206 tons of undigested sludge to the Fairfield-Suisun Sewer District for use as biofertilizer by Lystek International, Inc. Staff will provide a verbal update of the three-day testing results and present a video demonstrating the facility in operation. Strategic Plan Tie-In GOAL TWO: Environmental Stewardship Strategy 1—Achieve 100% compliance in all regulations, Strategy 2—Anticipate and prepare for potential regulatory changes GOAL FOUR: Workforce Development Strategy 4—Meet or exceed industry safety standards GOAL FIVE:Infrastructure Reliability Strategy 1—Manage assets optimally to prolong their useful life, Strategy 3—Protect personnel and assets from threats and emergencies ATTACHMENTS: 1. Presentation July 7, 2020 EOPS Regular Committee Meeting Agenda Packet- Page 39 of 49 Page 2 of 9 EMERGENCY SLUDGE LOADOUT 1 FACILITY (ESLF) UPGRADES, DISTRICT PROJECT 7348A - LOADOUT TESTING Engineering & Operations Committee July 7, 2020 t Edgar J. Lopez, P.E. - Capital Projects Division Manager Jean-Marc Petit, P.E. Director of Engineering and Technical Services CONSTRUCTION NEAR COMPLETION ESLF upgrades: New isolation gates between silos; New control gates for loading; New controls; and New ventilation and odor control systems. Facility tested June 23-25, 2020, actual loading of undigested sludge and hauling. Request for Proposal for long-term sludge Lhain: in process. a�- 1 July 7, 2020 EOPS Regular Committee Meeting Agenda Packet- Page 40 of 49 Page 3 of 9 i f. NEW 4 2 July 7, 2020 EOPS Regular Committee Meeting Agenda Packet- Page 41 of 49 Page 4 of 9 Or -" z� L- VOW t 9g% t����� - qj, -Tor- � 6 3 July 7, 2020 EOPS Regular Committee Meeting Agenda Packet- Page 42 of 49 S x I Page 6 of 9 .r a r r. IIIIIIIIIIII���III� '� _ -_ 10 5 July 7, 2020 EOPS Regular Committee Meeting Agenda Packet- Page 44 of 49 Page 7 of 9 — - Am 111 i 112 6 July 7, 2020 EOPS Regular Committee Meeting Agenda Packet- Page 45 of 49 Page 8 of 9 LnadautiI Progress ' 13 VIDEO TO BE SHOWN AT MEETING Emineren`c Sl die Loa4- III SJtart Up to in ' 14 7 July 7, 2020 EOPS Regular Committee Meeting Agenda Packet- Page 46 of 49 Page 9 of 9 QUESTIONS? Three-day testing results: • Trained several Operators • Total of 12 trucks loaded • Delivered 206 tons of sludge to Fairfield • Tested odor control system • Minor deficiencies noted for correction • Received positive feedback from Operations • Found minor modifications to improve systems and will implement soon 8 July 7, 2020 EOPS Regular Committee Meeting Agenda Packet- Page 47 of 49