R PRODUCTIVITY ANALYSIS
4
Phil Leiber
Director of Finance &Administration
May 12, 2020
1
INTRODUCTION
• Detailed productivity analysis given schedule changes adopted
in March 2020 in response to COVID-19.
• To balance 3 objectives:
• Maintaining workforce safety.
• Continuing the essential services provided by Central San.
• Ensuring staff remain productive and receive a full paycheck.
• Temporary Provisions were Adopted:
• Allowing teleworking and providing technology to accommodate teleworking.
• Temporary work schedule changes to facilitate social distancing.
• Providing administrative leave for those unable to telework and at heightened risk.
• Physical and technology changes to reduce risk of spreading virus,facilitate continuation of
work during this situation.
• Providing Personal Protective Equipment(PPEs)and more frequent workplace cleaning.
_ I
2
1
5/11/2020
METHODOLOGY
Phase 1. Quick-high level assessment
Phase 2. Detailed assessment
• List normal activities for March to June 2020.
• Can activity be performed given the revised work arrangements(teleworking,or
revised shifts for Operations)?
• Did the normal activities continue as expected, or did staff spend time on other
activities such as?
• a.COVID-19 responses
• b.Other productive activities such as training,catching up on documentation,or other
backlogged work.
• c.Non-productive time,includes time spent waiting for equipment to be deployed to staff who
could telework from home once a laptop was made available;or staff who,given the nature of
their jobs in Operations,did not have work to do at home and were available in"reserve"to
report onsite if needed.
I
3
EXAMPLE: ENGINEERING
ASSET MANAGEMENT AND GIS*
%Mrmespent on Non- Corto'rme on Non-Normal %mrmespenton Nuct
on- Costo'r-Prodive Tlme
Normal Activities ARivities Prod W Activities
(COVID response,.her
pmd,dl adiviiandnon-
productive time)
artme ismn Total-H Grolpiii Inception April 8- Mayo Inception April 8-Mat May 4-June Inception April&Mayo- Inception April Mayo
(Includes through May3 June 30 through (Pedod2)30(Pedod through May3 111130 through May3 June 30
nprin(Perioe3)(Pedod9) Amin 31 April (Period(Perine April (Period z)(Period 3)
emps/ (Period (Periotl 1) (Periotl 1) 2) 3) (Period l)
erns) 11
Engineering Plannin and 6 $646,829 4Y 3 1 $1,468Development,
sset
Maria ement
• Group of 6, all teleworked
• Nature of job allows for high level of productivity teleworking
• Developed several Dashboards presented to Committees and
the Board
*GIS:Geographical Information System
Slide 4 CENTRAL SAN
4
2
5/11/2020
EXAMPLE: ENGINEERING
CONSTRUCTION INSPECTION
%of Time Spenton Non- Costof Timeon N.n-Normal %.fT, Spent on Non- Cost of Non-Productive Tme
Normal ARivities Ani Productive Activities
(COVID response,.cher
pr.duRive activities and non-
praducfive time)
D.P.I.— ism. Total Staff Groupsalary Inception Apr118- Mayo Inception Aril 8-May May 4-lune nception April B-Mayo- Inceptlon April B- Mayo
(includes through Maya ne 30 through (Pen.dal 30(Pen.d (through May3 l ne 30 through Maya
Apnl7(Periotl2l(Pen.d3l April7 3) A
p
ri
l7 (Penotl(Penotl Apni7 (Penotl 2)(Penotl 3)
mps/ (Period (Period 11 (Period 11 2) 3) (Period 11
rernsl 11
Engineering Plannin and 5 $613,550 21 42 28 $],540 $18,481 $29,147
D_y merit:
onstruction
ms__
• Group of five; 69% in office, 31% teleworking
• Normal activities more impacted; however spent time on
updating Standard Specification Update (10-32%). Going to the
Board on July 2, 2020
• Zero "non-productive" time.
• Have now all returned to work since May 4, 2020
5
EXAMPLE: ADMINISTRATION
SECRETARY OF THE DISTRICT
%of Tme Spent on — Cost of Tme on Non-Normal %of rme Spent on Non- Cost of Non-Productive Tme
Normal ARMties Activities Productive Activities
(COVID response,ocher
ities
produRive activand non-
productive time)
mens Divizmn Total Stall Groupsalary nception April 8-1 Mayo Incepllon pril6-Ma,May 4-lune Inception April B-MaV4- Inception April B- May4-
(includes [hrougM1 Maya lune 30 througM1 (Period 2l 30(Period througM1 Maya June 30 [hrougM1 May3 June30
April)(Period 2l(Penotl 3l April) 31 April) (Penotl(Period April) IPeriotl 2)(Penotl 3)
mps/ (Period (Period 11 (Period 11 21 31 (Penotl 11
terns) 1)
dmin strata of me 5 $433,702 6 7 7 $1,501 $2,188 $5,207 0 0 0 $- $- $-
Diao-i
• Group of five; 32% in office, 68% teleworking
• Normal activities continued at near regular levels; minimal time
on COVID-19 admin and other productive work
• No "non-productive" time.
1
6
3
5/11/2020
EXAMPLE: ADMINISTRATION
PURCHASING
%ofrmespenton Non- Cos[ofrme on Non-Normal %ofrmesPenton Non- Co fNon-Productive rme
Normal Activities Acdvities Productive Activities
(Covin response,other
Prod..w a Vi"and non-
productive time(
art ision Tobi Staff Groupsalary Inception April 8- Mayo Inception rile-Mat May4-lune Inception April&May4- Inception April& Mayo
(Includes through May3 lune 30 through (Ped1d2)30(Pedod through Maya June 30 through Maya lune 30
Apd12(Pedpd2)(Pedod3) April? 3) Peril) (Pedod(Period Apol7 (Pedod 2)(Pedod 3)
eine,/ (Period (Period 1) (Period 1) 2) 3) (Pedod l(
erns)
aurin Pprcnaein F7$390,09 30 11 5 1
$6,66 $2,95 $3,512 5 0 01
$1,12 $ $
• Group of three: 3% in office, 97% teleworking
• 70-95% of time on normal activities
• 30% (Period 1) to 5% (Period 3) on Other activities-
- In Period 1, COVID 19 response was 25%and 5%down-time
himI
EXAMPLE: OPERATIONS
CSO MAINTENANCE CREW MEMBERS
%ofrmespenton Non- Costofrmeon Non-Normal %of rme spent on Non- Cost of Non-Produaiye Tion,Normal Activities Activities Prod'Gi"Activities
(COV,D response,other
prpd.1-activities and non-
productive time(
mens Divismn TotalBbH Group salary n April B- May4 Incepllon pril6-MaJ May4-lune nceptlon Aprl,&MaV4- In n April& Mayo
(includes through May' ne 30 throogM1 (Pedod2)30(Pedod (through May3 1 ne 30 through Maya
April)(Peripd2)(Pedod3) April? 31 April? (Period(Period April) (Period 2)(Period 3)
mps/ (Per,od (Period 1) (Period 1) 2) 31 (Period l(
tem,)
Aerations lWint Crew 20 $1,578,660 64 64 12 $58,289 $72,804 $32,489 "I
4 54 12 $49,181$61,429$32,489
Member
• 20 staff; 33% on shift/reserve, 50% on site; 3% teleworking;
14% at home not working
• 36% of time on normal activities until ramp up in Period 3
• 54% non-productive time until Period 3
1
8
4
5/11/2020
EXAMPLE: OPERATIONS
PUMP STATION STAFF
%of Time Spenton Non- Costof Timeon Non-Normal %&T,me Spent on Non- Cort of Non-Productive rme
Normal Activities Activities Productive Activities
(COVIO response,other
prod..w a Vitt and non-
productive time)
nop
artme ision Tobi Staff Group salary Inception April 8- Mayo Inception ril g-Mat May 4-lune Inception April&MaV4- Inception April& Mayo
(Includes through Maya lune 30 through (Period 2l 30(Pedod through Maya June 30 through Maya lune 30
Apol�(Period 111 Pedod 3l April7 3) April) (Pedod(Period Apol� (Pedod Zl(Pedod 3)
empz/ (Period (Periotl l) (Periotl l) i) 3) (Periotl l)
erns)
petitions Maint - 6 $694,198 0 0 0 $- $- $- 0 0 0 $-
af
• 6 staff; 85% on site; 14% teleworking
• 100% of time on normal activities
• No anticipated down-time
,t
EXAMPLE: OPERATIONS
PLANT OPERATORS
%orrmespent on Non- Costofrmeon Non-Normal %ofrm SPent on Non- Cort of Non-Product T<
Normal Activities Activities Productive Activities
(COVIO response,other
p.d..!.a vibes and non-
productive ti—)
artme ision Tobi staff IGroup salary I_ptonj April 8 1 Mayo Inception ril8-Mat May4-lune Inception April&MaV4- Inception April& Mayo
(Includes through Maya lune 30 through (Period 2l 30(Period through Maya June 30 through Maya lune 30
Apol�(Period 311Pedod 3l April) 31 April) (Pedod(Period April) (Pedod 2l(Pedod 3)
empz/ (Period (Periotl l) (Periotl l) i) 3) (Period l)
terns) 11
Aerations Plan[O erators 22 $2,535,49 24 24 ill$34,81 $43,48 $48,04 24 24 11 $35,10 $43,84 7
• 22 staff; 60% on site; 4% teleworking; 36% on reserve.
• 76% of time on normal activities until Period 3; ramp to 89%
• 24% downtown drops to 11% in Period 3.
10
5
5/11/2020
RESULTS: NON-NORMAL ACTIVITIES
%&Time SPe oNon-Nermal ARiNties Cort vF Time on Non-NormalArtiv.-
IDUYID response,other productive artivaies and nan-
produrtivetime)
Annual Cost Inception April 8-May3 May 4-June 30 Inception Apri18-May3 May 4-June 30
through April 7 (Period 2) (Period 3) through April7 (Period 2) (Period 3)
(Period 1) (Period I)
Salaries Only
BY DEPARTMENT
dmin $6,123,548 22 20 10 $78,91 $86,90 $104,805
Operations $16,890,514 35 35 30 $337,27 $422,273 $302,603
Engineering $12,020,535 15 33 8 $101,873 $112,91 $156,907
TOTAL
All Departments $35,034,596 26 25 9 $518,053 $622,09 $564,31
Salaries and Benefits`
BY DEPARTMENT
dmin $8,817,908 22 20 30 $113,63 $125,1491 $150,919
Operations $24,322,340 35 35 10 $485,66i $608,073 $435,748
Engineering $17,309,570 15 13 8 $146,691 $162,591 $225,946
TOTAL
All Departments $50,449,819 26 25 9 $745,99 $895,811 $812,612
11
RESULTS: NON-PRODUCTIVE TIME
%&Tme spentnn Non-1.d.R Artivaies I -of Non-Productive Time
Annual CostInception A!0618-May3 May 4-June Inception Apri18-May3 May 4-June30
through April (Period 2) 30(Period 3)through April 7 (Period 2) (Period 3)
7(Period 1) (Period 1)
laries Only
BY DEPARTMENT
dmin 1 $6,123,548 3 1 1 $12,3171 $5,177 $9,746
Operations $16,890,514 23 22 8 $228,532 $272,107 $218,178
Engineering $12,020,535 2 1 0 $12,332 $4,566 $-�77
1
TOTAL
All Departments $35,034,596 13 11 4 $253,18 $281,850 $227,923
laries and Benefits*
BY DEPARTMENT
dmin $8,817,908 3 1 1 $17,7371 $7,455 $14,034
Operations $24,322,340 23 22 8 $329,085 $391,834 $314,176
Engineering $17,309,570 2 1 0 $17,757 $6,575 $-
TOTAL
All Departments $50,449,819 13 11 4 $364,58 $405,864 $328,210
rl
12
6
5/11/2020
CONCLUSIONS
• Teleworking has been a reasonable temporary measure to
continue productivity in light of COVID-19 health orders
• Some jobs have to be done on site; as a result, that work has
been more impacted. Efforts continue to improve productivity
while ensuring safety.
• Operations effort to return to work—planned for May 11; now forecast
for May 18.
_ I
13
QUESTIONS AND DISCUSSION
NOW
- 1
14