Item 5.
CENTRAL SAN BOARD OF DIRECTORS
POSITION PAPER
MEETING DATE: APRIL 16, 2020
SUBJECT: CONDUCTA PUBLIC HEARING INACCORDANCE WITH ORDINANCE NO.
304 TO CONSIDER THE FINANCIAL CONDITION OF CENTRAL SAN WITH
RESPECT TO THE CURRENT NEED FOR THE PREVIOUSLYADOPTED
5.25% SEWER SERVICE CHARGE (SSC) RATE INCREASE FOR FISCAL
YEAR (FY) 2020-21
SUBMITTED BY: INITIATING DEPARTMENT:
THOMAS BRIGHTBILL, SENIOR ENGINEER ENGINEERING AND TECHNICAL SERVICES-
PDS-RATES AND FEES
REVIEWED BY: DANEA GEMMELL, PLANNING AND DEVELOPMENT SERVICES DIVISION
MANAGER
JEAN-MARC PETIT, DIRECTOR OF ENGINEERING AND TECHNICAL
SERVICES
PHILIP R. LEIBER, DIRECTOR OF FINANCE AND ADMINISTRATION
Roger S. Bailey
General Manager
ISSUE
Ordinance No. 304 requires that the Board of Directors hold a public hearing to consider Central San's
current financial condition prior to imposing the previously approved 5.25% SSC rate increase for FY
2020-21.
BACKGROUND
On April 18, 2019, the Board of Directors adopted Ordinance No. 304 which approved rate increases to
the annual SSC effective July 1, 2019; July 1, 2020; July 1, 2021; and July 1, 2022. The approved SSC
rate increase for July 1, 2020 increases the SSC by an average of 5.25%. The rate for single family
homes is increased by$31 to $629 per year(residential rates are rounded to the nearest whole dollar.)
April 16, 2020 Regular Board Meeting Agenda Packet- Page 57 of 208
Page 2 of 19
Ordinance No. 304 requires that prior to imposing the rate increase:
"The Board of Directors shall consider, at a noticed public hearing each year prior to June 30,
Central San's proposed budget, its financial condition, projected capital and operations and
maintenance costs, as well as other factors which bear on Central San's revenue requirements
to determine whether the increased amounts set forth herein for each fiscal year are still
necessary. If the Board concludes by a majority vote that sewer service charges for less than the
amount set forth in this ordinance for that fiscal year will produce adequate revenues for the
fiscal year, the Board may, by resolution, fix the sewer service charges for that fiscal year to be
imposed at appropriate amounts up to the maximum of the rates set forth herein without an
amendment of this ordinance. In such case, the resolution shall clearly set forth such lesser
charges that are to be imposed and those charges shall remain in place until further action of the
Board. If the Board determines the rates set forth in the table are appropriate for imposition in
that fiscal year, no further action of the Board shall be required."
On March 12, 2020, a Financial Planning Workshop was held with staff and the Board of Directors which
reviewed Central San's current financial position, the updated 10-year Capital Improvement Plan (Cl P),
and various options for financing the increased spending associated with the Cl P. The Board of Directors
gave direction to staff that Scenario 2B from the workshop was their preferred approach. This approach
included the previously approved 5.25% SSC rate increase for FY 2020-21 and used a 20-year term for
funds obtained through the State Revolving Fund (SRF).
ALTERNATIVES/CONSIDERATIONS
After reviewing Central San's current financial condition and receiving any public input, the Board of
Directors could:
• take no action, thereby imposing the previously approved 5.25% rate increase to the annual SSC,
• impose a rate increase in amount less than 5.25%, or
• take some other action.
FINANCIAL IMPACTS
Unless other action is taken by the Board of Directors, the previously approved rate increase will provide
an estimated $5.32 million in additional revenue for FY 2020-21.
COMMITTEE RECOMMENDATION
The matter was not reviewed by a Board Committee. The entire Board of Directors provided comments at the
March 12, 2020 Financial Planning Workshop.
RECOMMENDED BOARD ACTION
Review Central San's current financial condition. Hold the public hearing. Receive any public input. Take
no additional action and thereby impose the 5.25% SSC rate increase.
Strategic Plan re-In
GOAL THREE: Be a Fiscally Sound and Effective Water Sector Utility
April 16, 2020 Regular Board Meeting Agenda Packet- Page 58 of 208
Page 3 of 19
Strategy 1 - Conduct long-range financial planning, Strategy 2- Manage costs
ATTACHMENTS:
1. Presentation
April 16, 2020 Regular Board Meeting Agenda Packet- Page 59 of 208
Item 5.
(Updated Presentation
FISCAL YEAR 2020-21
SEWER SERVICE CHARGE
4_ Public Hearing
April 16, 2020
.,`. Board Meeting
1
CENTRAL SAN'S SEWER SERVICE CHARGE
IS COLLECTED ON THE PROPERTY
TAx ROLL
WHAT IF THERE IS A PROPERTY TAX
DEFERRAL?
CONSIDERATION OF IMPACTS
CENTRALSAN
I'
1
BACKGROUND
The fallout from the COVID-19 pandemic has prompted widespread
discussion about deferring various payment due dates, waiving
penalties, or deferring enforcement(mortgage, rents, taxes, etc.)
• 3/13/2020 and 3/18/2020: Federal and State tax filing deadline
postponed 90 days
• 3/21/2020: California Special Districts Association (CSDA)and other
groups representing local interests (cities, schools, etc.)sent letter to
Governor Newsom urging retention of the 4/10/20 property tax due date
• 4/2/2020: Governor Newsom acknowledged homeowners'anxiety over
property taxes but said he would defer to county officials and their
concerns about the long-term health of their budgets. "The assessors
and the counties make that determination. This is not the state's money."
' 3
3
BACKGROUND (CONTINUED
• 4/3/2020: CSDA asked members for implications of moving the 4/10/20
due date
• 4/4/2020: Statement of California Association of Counties:
oAny delay in payments beyond the 4/10/20 property tax deadline, for
individuals or businesses that can pay, will tip local governments intc
insolvency at a time when our residents need us the most.
oCounties will use all existing authority to cancel penalties and other
charges for homeowners, small businesses, and other property
owners that are unable to pay their property taxes due to
circumstances caused by COVID-19 on a case-by-case basis
• 4/6/2020: San Francisco County and San Mateo County moved property
tax due date to 5/4/20
• 4/8/2020: Central San discussed status of 4/10/20 collections with
County officials
4
2
IMPLICATIONS FOR CENTRAL SAN
Central San's Fiscal Year 2019-20 monthly cash receipts
forecast anticipates 31.7% ($50.5 million) of total annual
receipts of$160.7 million are to be received in April from the
County for Sewer Service Charge and Ad Valorem Tax.
• A complete delay would, over time, stress reserves. A partial
delay would not be a significant issue, if for a limited time:
oCash and investment balances at 3/31/20 were
$88.9million.
oExpenditures (Running Expense and Sewer Construction)
are projected at about $13 million per month for the next
several months.
Iftorld 1\
CENTRALSAN
5
CASH FLOW FORECAST
20
JUL AI N v
CASH IN:
ODNC ORD CAM BILL 15.M5.T
022
S1C PORTION OF SSC '.?710 092
PROPERTY TAA'a
61C o,'lea 102
2.982 415
CONCORD CAPITAL 7 973 516
RE LAIF INTICOUPONS
81C-AIF IN=uPONS +PIENPEFFTE40 1:15
OTHER PIE RECEIPTS 5743.&50 439-747 51-317.475 2.-0IM.471 5490.787 779-009
669 P 1.11W I I I 1.WP3 1, 279.154
TOTAL DEBT SVC 2,982.415
TOTAL WE ]JS fli9 M1.lM1'97 1C 5??7F.] 2dOd 461 4902,47 ]R iiS.?S'
I DIAL S'C bb1,yE1 'JVti``-��h J+htl.e11 f,IN1,IVN +.1,n J&1 R,i 3»
TOTAL RIE A SfC CASH IN 1,405,721 741,855 891,391 ,105,5]9 2,196,269 8,699,]99
202
JAN IFE8 IMAK JAWK IMY JUN AL
CASH IN'
CC]NCORO CLAM BILL $15.205.292
S0,
S1C PORTION OF SSC 14,OM.000
P519.120 32,229.2??
ROPERTY TAA- 6,560,000 1,052,OW 14,$2241,mL
A%.SfC EI rc a15
CONCORD CAPITAL
PIE LAIF INTICCUPCNS $78.789 5300.000 331.000 700-76,
31C LAIF INiICOUF`ON8 140322 249 000 5294Sr
OTHER RE RECEIPTS 576-905 490.593 400.000 900.000 3350.000 468.500 8.589-75L
H 1 2[11..6 4.. 5 600, BBB 675.000 800.
OTAL BE BY SVC 2,982,41.`.
OTAL RI[ •25 =.:.1 400 OOd 204M1 BBB 150 Of1[I 19103]0 93807]',
TOTAL SIC :•2S:L3- = 21,1 W,Wi] ti]S,WI 1,:f 11.1;x] tip,Vll�h'
TOTAL RE A S!C CASH IR L,969 f999,29fl 1,]00,000 51,749,600 1,625,000 ,281,500 160,078,11]
I
6
3
WHAT WILL HAPPEN IN CONTRA COSTA COUNTY?
(1)What if the due date for property tax was deferred or penalties suspended
by the State....(2)would the County still be able to remit the full amount to
agencies like Central San (as if the Teeter Plan continued),or(3)would Central
San need to make its own financing arrangements through lenders?
Responses:
Treasurer-Tax Collector Russell Watts: "Fortunately, the April 10 deadline will
not be extended. Tax collections appear to be close to normal. "
Auditor-Controller Bob Campbell: 'At this time we are not expecting the
delinquency rate to impact the county's ability to facilitate the Teeter advances
for this fiscal year. A 100%apportionment is expected for June. The April
apportionment, in a couple of weeks, may by adjusted to reflect collections if the
delinquencies are too high."
"The question of pushing out the delinquency date at the State level doesn't
appear to be likely as of today(4/8/20). If something was to occur at this point 1
think my response to question 1 applies."
CENTRALSAN
7
CONTRA COSTA COUNTY HAS CREATED A
PROCESS FOR REQUESTING CANCELLATION OF
LATE PAYMENT PENALTIES
Com CSA
C ft.Catl.0 My Trc.uu[i•Tax Cai W
iNEA 111,—CD-C-5CKiICFCLO D
OMW
�h'��+r wu.+c.00-�nrr.�w a0u0
...wa•ca.m Rvit"fw Nulty CrmvllAm fa COVIOAVOMM armr'
•"'•-d"lv+w r.p'a
—
0
0 0 0irr newnrc�ewwn wr ccno ssrnrrq rr.w-recw
°x� IEit
Slxr hrec frlkYld IrilwiM4gw
cr L�P'rr.urer�re u.rorr w..n Grkr 4M.
lar. i•rIo vain enFwllr
ISI
4
STAFF WILL CONTINUE TO MONITOR
COLLECTIONS AND REPORT TO THE BOARD
ON ANY UNUSUAL DEVELOPMENTS
Ron— CENTRALSAN
SEWER SERVICE CHARGE
FINANCIAL WORKSHOP RECAP
CENTRALSAN
5
PROPOSED IMPROVEMENT
2020-21: • 1 •
❖ 3. New Total extended to FY 2029-30 (Rolling 10 Years&escalated 3%)
with Updated Cash Flow
m minion zozo 000an;
Ten Year CIP
1 2 3 4 5 6 7 8 9t$F5TOTAL
FY20-21 FY21-22 FY22-23 FY23-24 FY24-25 FY25-26 FY26-27 FY27-28 FY28
ColleclionS tem $40.2 $40.8 $36.0 $39.2 $35.3 $29.6 $34.8 $27.3 $27
$32.3 $52.8 $57.3 $62.7 $55.3 $45.5 $37.6 $43.0 $36
$3.9 $2.5 $2.1 $2.1 $2.0 $1.9 $1.8 $1.8 $1.
Re led Water $9.1 $11.7 $11.5 $0.3 $5.3 $11.3 $13.3 $1.3 $0.
Contingency $2.5 $2.5 $2.5 $2.5 $2.5 $2.5 $2.5 $2.5 $2. ALFY 2020.21 $88.0 $110.4 $109.5 $106.8 $100A $90.8 $90.1 $75.9 $68 .5
Proposed CIP
su€o
sena -
srs.o --.
Sw.o
560
FYF9lM neo/[. ztlee rrtnllb ]51]4 h)b/]a rS./m Fi1Nx9 rra�lx
..rweme rea rye i rnm Sn�em
' 11
Presented at March 12.2020 Financial WorkshoD CENTRALSAN
11
CENTRAL SAN'S FINANCIAL PLAN
(BUILDING RESERVES NOW FOR FUTURE EXPENDITURES)
BASED ON SCENARIO 2B
Total Funds
f
5w .....
----- __...
SN
FY 2000 FT MI FYQOQ4 F IM 111.
1•Ending8ala... -Reserve Target
Inflated Capital Improvement Plan Spending(in millions)
„sua
$120 $114 $116 $117 9113
$105 $108
Sao $88 $93 $87
Seo $66
sw
$a0
Sm
Sn i
FY 20]0 FY 2@2 fYS024 FY2026 FY 2025
ISI
''r Presentedh 12.2020 • ••
CENTRALSAN
12
6
SUMMARY OF PROPOSED SCENARIOS
• Baseline—fund with $154 million in bonds (30 years @ 3.25%)
• Scenario 1A—$141 million debt; fund $99 million of Solids Project
with SRF, remainder of requirement with $42 million in bonds
• SRF:30 years @ 1.4%
• Bonds:30 years @ 3.25%
• Scenario 1 B—$138 million debt; fund $120 million of Solids
Project with SRF; remainder of requirement with $18 million in
bonds
• SRF:30 years @ 1.4%
• Bonds:30 years @ 3.25%
• Scenario 2A—$136 million debt; fund $120 million of Solids
Project and $16 million of Filter Plant 1 B Project with SRF
• Solids SRF:30 years @ 1.4%
• Filter Plant SRF:30 years @ 1.85%
$141 million debt; fund $120 million of Solids
Project and $21 million of Filter Plant 1 B Project with SRF
• Solids SRF:20 years @ 1.15%
• Filter Plant SRF:20 years @ 1.6% AN
' 13
Presented at March 12,2020 Financial Workshop CENTRALSAN
13
COMPARISON OF FINANCING COSTS
At March 12,2020 Financial Workshop,Central San Board favored Scenario 2B for lowest debt cost
Tot., Ann..I Interest& Tct.11�FinScenario Bonds SRF Deed Service Fees Cost
bt$154 $0 $154 $8.0 $87.6 $241.6
Scenario 1A $42 $99 $141 $6.2 $46.8 $187.8
Solids SRF
Scenario 16 $18 $120 $138 $5.9 $38 $176.0
Solids SRF
Scenario 2A
Solids SRF $0 $136 $136 $5.6 $32.8 $168.8
Filter SRF
Scenario 26
Solids SRF $0 $141 $141 $8.0 $18.7 $159.7
Filter SRF
(In million dollars)
CENTRAL AN
I1
7
SUMMARY OF PROPOSED SCENARIOS
IN2,2 23 24 2' 26 27 28 29 30 Total
FY 2019-20 CAPITAL IMPROVEMENT PROGRAM REVENUE REQUIRE MENT&FUNDING
CIP($mil) 66.2 96.7 106.2 106.3 90.2 83.6 92.2 71.2 80.4 74.2 867.2
Sewer Service Charge
Rate Increase 5.25% 4.75% 4.75% 4.0% 4.0% 4.0% 4.0% 3.0% 3.0% 3.0% 47.6%
Bond Issuance($mil) 77 77 154
FY 2020-21 CAPITAL IMPROVEMENT PROGRAM REVENUE REQUIREMENT
CIP($mill 1 1 88.0 1 110.4 1 109.5 1 . I100.4 90.8 90.1 75.9 68.4 67.3 907.5
Sewer Service Charge
Rate Increase 5.25% 4.75% 4.75% 4.0% 4.0% 4.0% 4.0% 3.0% 3.0% 3.0%
PROPOSED
Bond Issuance($mil) IS 15 42
141
SRF($mi1J 31 31 31 6 99
.•• e e
0:111IM1,1101 MEW=-
Bond Issuance($mil) 10 8 18
SRF($mil) 138
F
3 33.5 33.5 33.5 16.5 120
••• •
Bond Issuance($mil) 0
SRF$mi1J( 136 3 33.5 33.5 33.5 16.5 8 8 136
Bond Issuance($mi1J 0
SRF($mil) 141
3 33.5 33.5 33.5 16.5 8 13 141 15
Presented at March 12,2020 Financial Workshop CENTRALSAN
15
OUR RATES CONTINUE TO BE BELOW THE AVERAGE
SFPUC
Berkeley(EBMUD for treatment)
Santa Rosa
Petaluma
Rodeo Sanitary District
Ben'
Richm nd
Crockett Sanitary Department
Oakland(EBMUD for treatment)
San Leandro(EBMUD for...
Average of Agencies Surveyed
Napa Sanitation DistriR
Livermore
Vallejo Sanitation and Flood...
West County Wastewater...
cncord(CCCSD for treatment)
Brentwood
Novato Sanitary District
Sunnyvale
Mt View Sanitary District
Central San
Stege SD(EBMUD for treatment)
Pittsburg(Delta Diablo for...
Antioch(Delta Diablo for...
Bay Point(Delta Diablo for...
Pleasanton(DSRSD for... ■FY 2019-20 Sewer Service Charge
Fairfield(Esso)
san iose
Dublin San Ramon Services...
Castro Valley Sanitary District
Union Sanitary District
Hayward
One Loma Sanitary District
$0 $zoo $nae $600 $800 $1,000 $1,200 $1,400 $1,60,
Annual Charge per Single Family Home
Ebuffig • 1 1 • ••
16
8
RATE COMPARISON INCLUDING PROPERTY TAX
SFPUC
Berkeley(EBMUD for treatment)
Santa Rosa
Petaluma
Rodeo Sanitary District
Crockett Sanitary Department
Ben
Richmo d
Oakland(EBMUD for treatment)
San Leandro(EBMUD for...
Average of Agencies Surveyed
Novato Sanitary Dirtrict
Napa Sanitation District
Central San
Vallejo Sanitation and Flood...
Livermore
Wert County Wastewater...
Mt Vi'
District
Stege SO(EBMUD for treatment)
Concord(CCCSD for treatment)
Brenn ood
Pittsburg(Delta Diablo for...
Sunnyvale
Antioch(Delta Diablo for...
Bay Point(Delta Diablo for...
Pleasanton(DSRSD for...
Fairfield(FSSD)
Castro Valley Sanitary Dimict
'an
10:e
Dublin San Ramon services... 0F 2019-20 Sewer Sorviro Char- 7 cetimatcrl ornnorty tax
Union Sanitary Dirtrict T
Hayward
Oro Loma Sanitary Dirtrict
$0 $200 $400 $600 $800 $1,000 $1,200 $1,400 $1,600
Annual Charge per Single Family Home
' 17
Presented at March 12. 2020 Financial Workshoo CENTRALSAN
17
SSC RATE RECOMMENDATION
• Conduct a public hearing in accordance with Ordinance No. 304 to
consider the financial condition of Central San with respect to the
current need for the previously adopted 5.25% Sewer Service Charge
(SSC) rate increase for FY 2020-21.
• Staff Recommendation (Motion Required): Leave unchanged the
5.25% SSC rate previously approved for FY 2020-21.
$1,000 10.0%
$799
$823 $848
$776
$660 $690
$717 $746
$598 $u29
$500 - __ ___ ___ __ ___ __ __ _ 5.0%
$0 0.0%
2019-20 2020-21 2021-22 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 2028-29
Single Family Rate -Rate Increase
EL_ CENTRALSANI
18
9
QUESTIONS
CENTRALSAN
10