Loading...
HomeMy WebLinkAbout15. Receive update on emergency situation to repair or replace VFDs at Lower Orinda Pumping Station, and terminate the emergency Page 1 of 3 Item 15. ,ek CENTRAL SAN CENTRAL CONTRA COSTA SANITARY DISTRICT March 5, 2020 TO: HONORABLE BOARD OF DIRECTORS FROM: EDGAR J. LOPEZ, CAPITAL PROJECTS DIVISION MANAGER REVIEWED BY: JEAN-MARC PETIT, DIRECTOR OF ENGINEERING AND TECHNICAL SERVICES ROGER S. BAILEY, GENERAL MANAGER SUBJECT: RECEIVE UPDATE ON EMERGENCY DECLARED ON JANUARY 16, 2020 AUTHORIZING REPAIR OR REPLACEMENT OF THE VARIABLE FREQUENCY DRIVES (VFDS)ATTHE LOWER ORINDA PUMPING STATION, AND TERMINATE THE EMERGENCY SITUATION I N ACCORDANCE WITH PUBLIC CONTRACT CODE 22050(C)(3) Attached is a presentation on the Lower Orinda Pumping Station Variable Frequency Drives Emergency Declaration Update. Strategic Plan re-In GOAL TWO: Strive to Meet Regulatory Requirements Strategy 1 - Strive to achieve 100%permit compliance in air, water, land, and other regulations, Strategy 2- Strive to minimize the number of sanitary sewer overflows GOAL FOUR: Develop and retain a highly trained and innovative workforce Strategy 3- Meet or exceed industry safety standards GOAL FIVE: Maintain a Reliable Infrastructure Strategy 3- Protect District personnel and assets from threats and emergencies ATTACHMENTS: 1. Presentation March 5, 2020 Regular Board Meeting Agenda Packet- Page 104 of 106 Page 2 of 3 �+ LOWER ORINDA PUMPING STATION VARIABLE FREQUENCY DRIVES EMERGENCY DECLARATION UPDATE Board Meeting March 5, 2020 A, Edgar J. Lopez Capital Projects Division Manager I ACTIONS SINCE EMERGENCY DECLARED • Contracted with Fiore Industrial Electrical Services from Los Angeles to troubleshoot and repair the failed variable frequency drives (VFDs). These have since been repaired. However, there is no guarantee on reliability. Completed • Finalized design of replacement VFDs. Selected 300-hp Eaton Corporation drives. Completed • Issued a Purchase Order to Eaton Corporation for three replacement VFDs and one additional spare. Completed LL I' 2 CENTRALSAN 1 March 5, 2020 Regular Board Meeting Agenda Packet- Page 105 of 106 Page 3 of 3 TOTAL ESTIMATED PROJECT COSTS • VFD Repair and Purchases (Emergency)............$ 250,000 • Engineer's Estimate for Installation.....................$ 230,000 • Consultants (Design and Support).....................$ 65,000 • Engineering and Operations Staff...................... 35,000 $ 580,000 l 3 CENTRALSAN STAFF RECOMMENDATION •Staff recommends to terminate the emergency declared on January 16, 2020. CENTRALSAN 2 March 5, 2020 Regular Board Meeting Agenda Packet- Page 106 of 106