Loading...
HomeMy WebLinkAbout08.a. Receive summary of 2019 energy usage Page 1 of 7 Item 8.a. ,ek CENTRAL SAN SANITARYCENTRAL CONTRA COSTA , . March 5, 2020 TO: HONORABLE BOARD OF DIRECTORS FROM: CLINT SHIMA, SENIOR ENGINEER REVIEWED BY: NEIL MEYER, PLANT MAINTENANCE DIVISION MANAGER ANN SASAKI, DEPUTY GENERAL MANAGER ROGER S. BAILEY, GENERAL MANAGER SUBJECT: RECEIVE SUMMARY OF 2019 ENERGY USAGE Senior Engineer Clint Shima will present a summary of Central San's 2019 energy usage. The presentation will include the following: • Treatment Plant Usage - 2018 versus 2019 • MCE Impact • Monthly Usage Statistics • General Energy Information • Solar Panels Strategic Plan Tie-In GOAL SIX: Embrace Technology, Innovation and Environmental Sustainability Strategy 2- Reduce reliance on non-renewable energy, Strategy 3- Encourage the review and testing of technology to optimize and modernize business operations ATTACHMENTS: 1. December 2019 Energy Usage 2. Presentation March 5, 2020 Regular Board Meeting Agenda Packet- Page 37 of 106 CCCSD December 2019 Energy Usage HHWCF(Solar) Treatment Plant Monthly Total Energy Cost: $361,775 HHWCF(Gas and $270 88%of Total$ Electricity)$221 0% o% POD Reserv.&Serv. $297 /MG Treated Charges(PG&E) Misc(Gas and $23,327 7% Electricity) $2,946 POD Demand Charge 1,644 kWh/MG Treated 1% (MCE)$17,635 6% C50 Facility POD Electricity $2 3000lsz%1 .2%of Total$ Import(MCE) $10,892 4% CSO Electricity, $40,1% CSO Gas, $1,074,24% Page 2 of 7 CSO Vehicle CSO Vehicle PG&E Charges Bay Electricity, Bay Gas,$389 (trans.+dist.+etc. $609,14% '9% minus Reserv.& $118,963 37%� Serv.Charges) $43,763Pump Stations la% San Ramon,$9,449, 11%ofTotal$ 24% Moraga,$8,167, 21% 12 Other Pump Stations, POD Landfill Gas $2,227,6% $36,211 11% POD Concord Industrial, Orinda Crossroads, Transmission $1,033,2% $8,533,21% r Fairview Lift Station, $1,195,3% Lower Orinda, $4,609,12% Maltby, $1,575,4% Martinez,$2,809,7% Operating Cost of CCCSD by Month TP Electricity Source in kWh TP MMBTU of Gas Consumed $400,000 2,500 50 $375,722 $350,000 � 45 $349,282 $361,775 2,000 40 $300,000 $348,052 D 3 m 35 $250,000 v 1,500 30 $200,000 A 25 o r 1,000 s 20 $150,000 15 $100,000 500 10 $50,000 5 $0 0 0 Sep-19 Oct-19 Nov-19 Dec-19 Sep-19 Oct-19 Nov-19 Dec-19 Sep-19 Oct-19 Nov-19 Dec-1 ■POD Natural Gas ■Natural Gas Delivery ■POD Landfill Gas ■Other Energy Charges ■Cogen ■Standby Power ■PG&E ■Natural Gas ■Landfill Gas ■POD Demand Charge ■POD Reserv.&Serv.Charges ■PG&E Charges TP Electricity by Source in kWh TP MMBTU of Gas Consumed TP Energy by Source in kWh 30 600 100 693 2.05 "tti 90 25 5o0 80 70 20 400 s 60 r 3 3 15 ° 300 m 50 C c o o m = 40 10 a 200 — L 30 25.98 26.36—29.27—29.58—29.10— 20 5 100 10 0 0 0 2015 2016 2017 2018 2019 2015 2016 2017 2018 2019 2015 2016 2017 2018 2019 Year Year Year ■Cogen ■Standby Power ■PG&E ■Natural Gas ■Landfill Gas ■Aux Boilers WHB Steam ■Cogen Steam ■Cogen Electrical ■Standby Power ■PG&E This month CCCSD produced and purchased electricity at an average rate of $0,1292 /kWh(including maintenance) Anthropogenic GHG Emissions Renewable Energy Landfill Gas Compared to $0.1395 /kWh if exclusively from PG&E 7,976 MMBtu MT CO2e Profile 15% 25000 Recovered Waste Heat Generation breaks even with PG&E at $5.68 /MMBTU 4,360 MMBtu 20000 � 9% Natural gas was purchased 15000 solar at a rate of $3.11 /MMBTU v 31 MMBtu eq. ij 10000 0.06% F Total Non-Renewable Natural gas transmission 39,165 MMBtu MCE Renewables $1.67 /MMBTU 5000 76% 187 MMBtu eq. cost 0.36% o CCCSD produces steam at an average rate of $0.0031 /lb steam March 5, 2020 Regular Board Meeting Agenda Packet- Page 38 of 106 Page 3 of 7 IRW_ ., / SUMMARY OF CENTRAL SAN'S 2019 ENERGY USAGE Board of Directors Meeting March 5, 2020 Clint Shima, P.E. Senior Engineer Plant Maintenance Division Slide 1 OVERVIEW Central San's Monthly Energy Usage Board Updated Quarterly Treatment Plant 2018 versus 2019 Monthly Usage Statistics MCE Impact General Energy Information New Time-of-Use Rates 4;, s4 Solar Panels Slide 2 `'•.':(1 I 1"- March 5, 2020 Regular Board Meeting Agenda Packet- Page 39 of 106 Page 4 of 7 TREATMENT PLANT 2018 VERSUS 2019 2018 2019 Natural Gas 421,000 MMBtu $2.0 M 411,000 MMBtu $2.0 M (NG): Landfill Gas 94,000 MMBtu $354k 92,000 MMBtu $419k (LFG): Total: 515,000 MMBtu $2.3 M 503,000 MMBtu $2.4 M Electricity (PG&E&MCE): 2,093,000 kWh $806k 2,882,000 kWh $1,223k Cogeneration: 22,236,000 kWh 21,922,000 kWh Total: 24,329,000 kWh 24,804,000 kWh SlideCENTRALSAN 3 ` a� MONTHLY USAGE STATISTICS • Total Costs (NG, LFG, and Electricity) o Range: $323,000 to $378,000 o Average: $358,000 • Average Cost/ MG: $294.00 • Average kWh / MG: 1,678 • Area Cost Breakdown o Treatment Plant: 84% — 89% o Pumping Stations: 10% — 15% o Collection System Operations Facility: < 3% Slide 4 C". CENTRALSAN March 5, 2020 Regular Board Meeting Agenda Packet- Page 40 of 106 Page 5 of 7 MCE IMPACT ACIE • Savings: Approximately $19,000 compared to Pacific Gas and Electric (PG&E) rates • MCE: Light Green is 60% renewable • Total PG&E and MCE 2019 Cost: $1,223,000 • MCE (January — December 2019): $342,000 Slide 5 ` GENERAL ENERGY INFORMATION • Cogeneration borescope monitoring increased electrical import • Cogeneration engine exchanged in November • NG 2016 Average: $3.86 / MMBtu • NG 2017 Average: $3.50 / MMBtu • NG 2018 Average: $3.24 / MMBtu • NG 2019 Average: $3.04 / MMBtu • NG 2020 Average: $3.01 / MMBtu • 2019 Greenhouse Gas: Below 25,000 COZe MT • Renewable Energy: --27% Slide 6 CENTRALSAN March 5, 2020 Regular Board Meeting Agenda Packet- Page 41 of 106 Page 6 of 7 GENERAL ENERGY INFORMATION PG&E c Filed Chapter 11 Bankruptcy Protection in January 2019 — Plans to exit end of June 2020 o New rate schedule planned November 2020 o Public Safety Power Shutoff outages — Generators Energy Optimization o PG&E large integrated audit o Strategic Energy Management Slide 7 ` NEW TIME-OF-USE RATES • Time-of-Use Rate Plan change from E20 to B20 • Minimal affect on operations expected s�swe.: ,m..aneaw rr i !2=1.0 lu P.-,. Mare:Energy Time-0f-Use Cost E-20) After:Energy Time-of-Use Cost(8-20) smm�.w�a,r. .m„a-r.r.re-r �r-r.iaer ..me-rirr•�� xwu,n [vnm..1 I���I �ra•r ryn"�e.l nr.n,ro.u,mwrr`"`n dar f�""""0`}. ,rnPer ,zw.r+ oow eem a PARnA0.prpS OFF PEAK 90 nn, iAprnA lr PW low PENT SUPER OFF 1?un+re uAM-e pw PEAN 9AM-QPM PARTIAL PEAK OFF FEhN I/AI.4ln, i]PaM-plpiy PEAK PEAK PEAK PAIMALPFAK sru-eaa P,r OFF PEAK OFF 0WMK OFF PEAK vi'�prx.linN1 o-3o vel•.: 9PM•ff AY 9M1•i1 AIA 1 A:a Slide 8,,0i011r, I CENTRALSAN March 5, 2020 Regular Board Meeting Agenda Packet- Page 42 of 106 Page 7 of 7 SOLAR PANELS INSTALLED AT HOUSEHOLD HAZARDOUS WASTE FACILITY AND COLLECTION SYSTEMS OPERATIONS FACILITY 2018 Produced: 277 MWh 2019 Produced: 282 MWh a I ry+ Slide 9 s. Slide 10 CENTRALSAN March 5, 2020 Regular Board Meeting Agenda Packet- Page 43 of 106