HomeMy WebLinkAbout09. Authorize two 3-year agreements for inspection services for capital improvement projects Page 1 of 3
Item 9.
CENTRAL SAN BOARD OF DIRECTORS
vie
. , Hill. , , . .
POSITION PAPER
MEETING DATE: FEBRUARY20, 2020
SUBJECT: AUTHORIZE THE GENERAL MANAGER TO EXECUTE THREE-YEAR
PROFESSIONAL ENGINEERING SERVICES AGREEMENTS WITH
CONSOLIDATED CM, INC. AND HDR, INC. IN AN AMOUNT NOT TO
EXCEED $500,000 EACH TO PROVIDE CONSTRUCTION AND SPECIALTY
INSPECTION SERVICES FOR CAPITAL IMPROVEMENT PROJECTS AT
THE WASTEWATER TREATMENT PLANT
SUBMITTED BY: INITIATING DEPARTMENT:
CRAIG MIZUTANI, SENIOR ENGINEER ENGINEERING AND TECHNICAL SERVICES-
CAPITAL PROJECTS
EDGAR J. LOPEZ, CAPITAL PROJECTS DIVISION MANAGER
JEAN-MARC PETIT, DIRECTOR OF ENGINEERING AND TECHNICAL
SERVICES
Roger S. Bailey Kenton L. Alm
General Manager District Counsel
ISSUE
The Board of Directors' authorization is required for the General Manager to execute a professional
engineering services agreement in an amount greater than $100,000.
BACKGROUND
Several construction projects have been or will be presented to the Board for award in the Capital
Improvements Program relating to the wastewater treatment plant (plant) or general improvements. Central
San staff routinely provides construction management, administration, resident engineering, and inspection
February 20, 2020 Regular Board Meeting Agenda Packet- Page 80 of 161
Page 2 of 3
duties for projects and supplements with outside inspectors as needed. Construction inspection consists
of general inspection duties to coordinate and monitor daily contractor activities and report any issues or
conflicts to Central San's construction manager or engineer as problems arise. Inspectors are critical
during construction since they are the field assurance that the project is built according to the approved
project submittals and contract documents (specifications and drawings). Specialty services include
inspection of electrical, instrumentation, control systems, specialty materials, welding, and other trades that
require specialty training or knowledge.
An evaluation of the projected construction activities remaining in Fiscal Year(FY) 2019-2020 through FY
2021-22 indicates the need to hire up to three additional inspectors for the peak construction months (May
through October). Construction inspection and specialty services are needed for the Emergency Sludge
Loadout Facility(ESLF) Upgrades, District Project (DP) 7348A and for the Mechanical and Concrete
Renovations, DP 7351. In addition, future projects, including the Treatment Plant Piping Renovations-
Phase 10, Safety Enhancements-Phase 5, and other projects in the plant or general improvements
program will require the same outside services.
On September 11, 2019, a Request for Proposals was publicly advertised on Central San's website and
PlanetBids for as-needed construction inspection and specialty services. Five firms (Anchor CM,
Consolidated CM, Inc. (Consolidated CM), HDR, Inc. (HDR), K&B Construction Services, Inc., and MCK
Americas, Inc.) responded with qualified and responsive proposals. After evaluating the proposals based
on qualifications, fees, references, and proximity to Central San, staff selected two firms - Consolidated
CM and HDR. Both firms perform construction inspection; however, HDR was selected mainlyforthe
specialty services offered under their proposal. A large portion of Consolidated CM's tasks will be on the
ESLF project with a focus on general construction inspection, while HDR will provide specialty inspection
services for electrical and controls work.
ALT ERNAT IVES/CONSIDERAT IONS
Central San has historically used external construction inspection on an annual basis to inspect projects in
the plant.An alternative to the as-needed agreements would be to hire in-house construction inspectors or
similar positions in the Capital Projects Division. This would require creating positions and hiring an
additional two to three full-time or temporary staff. Based on the as-needed and seasonal time frame
required for the construction projects, this alternative is not recommended.
Another option would be to select only one of the two firms. However, having two as-needed contracts
available allows more flexibility since one firm may not always have staff readily available when services
are requested.Additionally, each of these two firms have their own focus of expertise that will be needed
on the various projects. Therefore, this alternative is not recommended.
FINANCIAL IMPACTS
The total cost for the two agreements presented is expected to reach $1 million over the period of the
agreements. The Consolidated CM and HDR agreements are anticipated to reach $500,000 each. The
hourly rate for the proposed inspectors ranges from $135 to $203 depending on the specialty
qualifications required for the project. The agreement duration is expected to be three years; however,
project schedules and construction may change over time for several reasons. Therefore, the duration of
the agreements may be extended by staff to complete construction of a project or if the agreement is not
fully utilized, as long as the rates are still competitive.
The services provided under these agreements are funded by project budgets approved in the annual
Capital Improvement Budget, and no additional funds are being requested.
February 20, 2020 Regular Board Meeting Agenda Packet- Page 81 of 161
Page 3 of 3
COMMITTEE RECOMMENDATION
The Engineering and Operations Committee reviewed this subject at the January 14, 2020 meeting
and recommended approval of the subject.
RECOMMENDED BOARD ACTION
Authorize the General Manager to execute professional engineering services agreements for a three-year
term in an amount not to exceed $500,000 each with the following firms:
1. Consolidated CM, Inc. for as-needed construction inspection; and
2. HDR, I nc. for as-needed construction inspection and specialty services.
Strategic Plan Tie-In
GOAL TWO: Strive to Meet Regulatory Requirements
Strategy 1 - Strive to achieve 100%permit compliance in air, water, land, and other regulations
GOAL THREE: Be a Fiscally Sound and Effective Water Sector Utility
Strategy 2- Manage costs
GOAL FIVE:Maintain a Reliable Infrastructure
Strategy 1 - Manage assets optimally throughout their lifecycle
February 20, 2020 Regular Board Meeting Agenda Packet- Page 82 of 161