Loading...
HomeMy WebLinkAbout09.f. (Handout) Presentation ATTACHMENT 3 (Item 91 - Handout) �a INTRODUCTION TO MEMBRANE FILTRATION PILOT PROJECT Jean-Marc Petit -� Director of Engineering and Technical Services Board Meeting January 16, 2020 I PROJECT OBJECTIVES 1 . Proof of concept using tertiary membrane filtration for producing Title 22 recycled water with Central San's secondary effluent 2. Prepare business case evaluation comparing a tertiary membrane filtration alternative with granular media filtration (current technology used by Central San) 3. Leverage pilot opportunity to evaluate other benefits of using membrane filtration for future recycled water projects 4. Preliminary evaluation of using pilot using membrane for MBR upstream of the filter and RO downstream in planning for the water exchange project Membrane Bioreactor(MBR) Reverse Osmosis(RO) z 1 • I Proposed Site � .. -rte• - �� y r I. .' may, a `'•�' �. -",,,.� d� PROPOSED PILOT PROJECT LOCATION 3 ISOMETRIC OF 1 FIBRACAST MEMBRANE r: ,IIS SCC S CFNTRAI SAN PHOTO OF A FIBRACAST MEMBRANE UNIT --- ' S PILOT PROJECT COST • Estimated project cost approximately $200,000 to $250,000 (including vendor contract around $75,000) • Funded from existing budget through District Project 7315 — Applied Research ' 6 3 PROJECT SCHEDULE • September 2019: Discussed possible tertiary pilot opportunity with Fibracast at Water Reuse Symposium in San Diego • October 2019: Discussed possible combining with an MBR pilot opportunity with Fibracast at WEFTEC Conference in Chicago.Also visited Echo Water in Sacramento to look at their Zenon membrane pilot • November-December 2019: Received pilot proposals and started pilot planning • December 16, 2019: Presented concept to REEP committee • January 2020: Plan to issue contract with Fibracast • February-March 2020: Fast-track site and pilot preparation • March 2020: Approximate timing to receive Pilot Unit • April through June 2020: Operate Pilot Unit(with option to continue additional three months if required) • Third Quarter 2020: Present results to REEP and Board FirdMiTITIM M. QUESTIONS? CFNTPAISAN 4