HomeMy WebLinkAbout04.b. Receive update on Fiscal Year 2019-20 Mid-Year Capital Improvement Budget Page 1 of 12
Item 4.b.
CENTRAL SAN
January 14, 2020
TO: ENGINEERING AND OPERATIONS COMMITTEE
FROM: EDGAR J. LOPEZ, CAPITAL PROJECTS DIVISION MANAGER
REVIEWED BY: JEAN-MARC PETIT, DIRECTOR OF ENGINEERING AND TECHNICAL
SERVICES
ROGER S. BAILEY, GENERAL MANAGER
SUBJECT: RECEIVE UPDATE ON FISCAL YEAR 2019-20 MID-YEAR CAPITAL
IMPROVEMENT BUDGET
Attached is a presentation on the Fiscal Year 2019-20 Mid-Year Capital Improvements Budget Update.
Strategic Plan re-In
GOAL TWO: Strive to Meet Regulatory Requirements
Strategy 1 - Strive to achieve 100%permit compliance in air, water, land, and other regulations, Strategy 2- Strive to
minimize the number of sanitary sewer overflows
GOAL THREE: Be a Fiscally Sound and Effective Water Sector Utility
Strategy 2- Manage costs
GOAL FOUR: Develop and retain a highly trained and innovative workforce
Strategy 3- Meet or exceed industry safety standards
GOAL FIVE: Maintain a Reliable Infrastructure
Strategy 1 - Manage assets optimally throughout their lifecycle, Strategy 2- Facilitate long-term capital renewal and
replacement, Strategy 3- Protect District personnel and assets from threats and emergencies
GOAL SIX: Embrace Technology, Innovation and Environmental Sustainability
Strategy 1 -Augment the region's water supply
ATTACHMENTS:
1. Presentation
January 14, 2020 EOPS Regular Committee Meeting Agenda Packet- Page 15 of 28
Page 2 of 12
FISCAL YEAR (FY) 2019-2020
MID-YEAR CAPITAL IMPROVEMENTS
BUDGET UPDATE
Engineering & Operations Committee
January 14, 2020
�i
Edgar J. Lopez
Capital Projects Division Manager
1
COLLECTION SYSTEM (CS) PROGRAM
HIGHLIGHTS
4Y.:- .
1
January 14, 2020 EOPS Regular Committee Meeting Agenda Packet- Page 16 of 28
Page 3 of 12
PUMP STATION UPGRADES -
PHASE 1 , DISTRICT PROJECT 8436
• Construction contract awarded
• Total Project Budget$35 million j
• Preconstruction Meeting held • �E
December 16, 2019 i
• Issue Notice to Proceed in January 2020
(Administrative)
• Estimate completion by December 2021
• Major electrical and mechanical t
renovation at Moraga, Orinda
Crossroads, and FlushKleen
13
WALNUT CREEK SEWER RENOVATIONS -
PHASE 13, DISTRICT PROJECT 8455
• Substantial completion • 54 new or rehab manholes
• Minor punch list items • Coordinated with City and County
• Renovated 8,250 feet of sewers paving projects
.r
E-
_ 1
,4 0511412119 fl8:10
4
2
January 14, 2020 EOPS Regular Committee Meeting Agenda Packet- Page 17 of 28
Page 4 of 12
LAFAYETTE SEWER RENOVATIONS -
PHASE 13, DISTRICT PROJECT 8452
• Substantial completion • 56 new or rehab manholes
• Minor punch list items • Coordinated with City paving
• Renovated 11,000 feet of sewers projects
.. F
Bit.
is
SOUTH ORINDA SEWER RENOVATIONS -
PHASE 7, DISTRICT PROJECT 8454
• Substantial completion • 55 new or rehab manholes
• Minor punch list items • Coordinated with City and
• Renovated 9,330 feet of sewers County paving projects
6
3
January 14, 2020 EOPS Regular Committee Meeting Agenda Packet- Page 18 of 28
Page 5 of 12
OTHER CS PROJECTS AND ITEMS TO COME
• Bid new Cured-in-Place Pipe Contract this fiscal year; current
contract closing
• Continue Pump Station Upgrades— Phase 2 design, includes
renovation of three Martinez pumping stations
• Planning a large diameter pipeline inspection program
• Items to come:
• Bid projects from Collection System Sewer Renovation—
Phase 1, including Danville, Lafayette (TBD), Martinez, Orinda,
and Walnut Creek
• Issue Requests for Proposal (RFP)for:
• Construction pipeline inspectors; and
• Locating and potholing
TREATMENT PLANT (TP) PROGRAM
HIGHLIGHTS
ow
k.
4
January 14, 2020 EOPS Regular Committee Meeting Agenda Packet- Page 19 of 28
Page 6 of 12
SOLIDS HANDLING FACILITY IMPROVEMENTS
(SOLIDS PROJECT , DISTRICT PROJECT 7348
• Black&Veatch issued 90%
i Design submittal to review
• MWH Constructors hired for
construction review
Major elements include solids
blending tanks, dewatering and
cake pumps, furnace
modifications, new wet
I scrubbers, building seismic, ash
handling, etc.
• Total project costs under review,
including contingency
_ • Update State Revolving Fund
Loan Application
n • Issue emergency solids haulin
and disposal RFP ... :9
EMERGENCY SLUDGE LOADING FACILITY
IMPROVEMENTS, DISTRICT PROJECT 7348A
• Construction 30% complete
�Y' '`- � • Upgrading the odor control system
and building ventilation ductwork
• Ordered new gates and actuators
for sludge disposal
• Facility mechanical and controls
improvements
c� • Contract in place for sludge
hauling and disposal at Lystek in
Fairfield
• Project will improve facility for
daily operation in case of
t emergency or planned disposal
i4 during the Solids Project
5
January 14, 2020 EOPS Regular Committee Meeting Agenda Packet- Page 20 of 28
Page 7 of 12
MECHANICAL AND CONCRETE RENOVATIONS,
DISTRICT PROJECT 7351
Construction 75% complete
• Completed bypass of influent and
- primary effluent channels
_ Installed new gates at the influent
and nearby structures
Rehabilitated Primary
Sedimentation Tanks (PSTs) 3
and 4, concrete and adjacent
structures
• Replaced and installed new gates
in the PSTs
• Completed odor control scrubber
rehabilitation
• Completed PST 3 and 4 flight rail
system replacementv„
OUTFALL IMPROVEMENTS - PHASE 7,
DISTRICT PROJECT 7353
Regulatory project(Inspected
every 5-10 years)
95% Design completed
{ Received CEQA Bypass
--; Permit to Lower Walnut Creek
• Bidding January 2020
• Construction summer of 2020
• Scope includes testing of
1,500 joints and repairs as
•� needed, corrosion control on
steel risers, replacement of
valves, Structure 9000 valve
and seismic modifications, and
trestle repairs in Suisun Bay
6
January 14, 2020 EOPS Regular Committee Meeting Agenda Packet- Page 21 of 28
Page 8 of 12
PLANT OPERATIONS BUILDING SEISMIC,
DISTRICT PROJECT 7362
• Structural steel completed
• Construction 95% complete
• Framing, drywall, and painting
completed
Shower and locker rooms available and
in use by staff
Flooring and ceilings completed
r
Lobby completed
• Cleaning in progress
• Punch list items
• Anticipated move back in
February
'+13
OTHER TP PROJECTS AND ITEMS TO COME
• Completed 30% Design of the Influent Pump Electrical
Improvements, District Project(DP) 7328
• Completed construction of the Plant Control System 1/0
Replacement- Phase 1, DP 7339
• Completed construction of the Sludge Blending Tank Repairs,
DP 6172
• Installed new chiller in the Solids Conditioning Building
• Completed several UPCCAA informal projects
• Completed condition assessments under Steam and Aeration
Blower Systems Renovation Project
• Bidding the TP Safety Enhancements- Phase 5, DP 7364
(Solids Conditioning Building Emergency Stairway)
• Design and bid of Treatment Plant Site Improvements
(Funded by security projects and other capital projects)
'1,4
7
January 14, 2020 EOPS Regular Committee Meeting Agenda Packet- Page 22 of 28
Page 9 of 12
GENERAL IMPROVEMENTS (GI)
PROGRAM HIGHLIGHTS
SERVER ROOM RELOCATION,
DISTRICT PROJECT 8243
90% complete
' Electrical (ATS, UPS, panels)
completed
• HVAC installed, undergoing
commissioning
• Server racks installed and
powered
• Fire suppression installed and
being commissioned for Fire
Marshall approval
• Once building approved, existing
servers and equipment to be
migrated by separate company
'1,6
8
January 14, 2020 EOPS Regular Committee Meeting Agenda Packet- Page 23 of 28
Page 10 of 12
OTHER GI PROJECTS AND ITEMS TO COME
• Ongoing Equipment and Vehicle Replacement Program projects
• IT Development: equipment procurement in progress
• Asset Management: e-Builder Program Management
• Enterprise Resource Planning Software replacement in progress
orAC�C
ERP Cloud
RECYCLED WATER PROGRAM
HIGHLIGHTS
9
January 14, 2020 EOPS Regular Committee Meeting Agenda Packet- Page 24 of 28
Page 11 of 12
FILTER PLANT AND CLEARWELL IMPROVEMENTS -
PHASE 1A, DISTRICT PROJECT 7361
• Add Utility Water Pump - • 60% Design
• Replace Backwash Motors
(48ov) -._ _ -_ submittal due at
• Two New Storage Tanks the end of January
Clearwell:
• East Clearwell 2020
decommissioned
• West Clearwell in • Pilot testing
service
• New Isolation Gates completed
•
Rehab 1 Filter&Mechanical • West Clearwell
Upgrade Ch mical Feed
cell commissioned
and operating
Upgrade/Replace Electrical Gear • Major electrical
New Clearwell Electrical Facility renovation for the
s Replace Substation 40-2400V
Clearwell
• New storage tanks
�1 ,s
FY 2019-20 CAPITAL IMPROVEMENTS BUDGET AND
EXPENDITURES AS OF 12/31/19
Budget Actual Expenditures %Actual
Program to Date as of 12/31/19 Budget Spent
to Date
Collection System $26,472,165 $9,355,541 35%
Treatment Plant $33,971,975 $13,136,184 39%
General Improvements $8,211,413 $3,188,729 39%
Recycled Water $6,013,968 $ 1,640,530 27%
CIB Contingency $0 NA NA
Totals: $74,669,521 $27,320,984 37%
20
10
January 14, 2020 EOPS Regular Committee Meeting Agenda Packet- Page 25 of 28
Page 12 of 12
QUESTIONS?
11
January 14, 2020 EOPS Regular Committee Meeting Agenda Packet- Page 26 of 28