HomeMy WebLinkAbout03.a. Review draft Position Paper to adopt (1) Resolution of Intention No. 2019- to initiate the formation of the Ridgewood Road Contractual Assessment District (CAD) No. 2019-2 for the purpose of installing sewer improvements on Ridgewood Road in A Page 1 of 9
Item 3.a.
CENTRAL SAN BOARD OF DIRECTORS
POSITION PAPER
DRAFT
MEETING DATE: OCTOBER 15, 2019
SUBJECT: REVIEW DRAFT POSITION PAPER TO ADOPT (1) RESOLUTION
OF INTENTION NO. 2019- TO INITIATE THE FORMATION OF THE
RIDGEWOOD ROAD CONTRACTUAL ASSESSMENT DISTRICT
(CAD) NO. 2019-2 FOR THE PURPOSE OF INSTALLING SEWER
IMPROVEMENTS ON RIDGEWOOD ROAD INALAMO;
AND (2) RESOLUTION NO. 2019- APPROVING THE BOUNDARY FOR
THE PROPOSED CAD
SUBMITTED BY: INITIATING DEPARTMENT:
RUSSELL LEAVITT, ENGINEERING ENGINEERING AND TECHNICAL SERVICES-
ASSISTANT I I I PDS-PLANNI NG AND APPLI ED RESEARCH
REVIEWED BY: MICHAEL PENNY, ASSOCIATE ENGINEER
DAN FROST, SENIOR ENGINEER
DANEA GEMMELL, PLANNING AND DEVELOPMENT SERVICES DIVISION
MANAGER
JEAN-MARC PETIT, DIRECTOR OF ENGINEERINGAND TECHNICAL
SERVICES
ISSUE
Approval of a Resolution of Intention by the Board of Directors is required as the first step in the formation
of a CAD.
BACKGROUND
Owners of properties along Ridgewood Road in Alamo have expressed an interest in forming a CAD in
order to design and construct an extension of the public sewer system to serve seven properties. The
location and boundary of the proposed CAD is shown on Attachment 1.
The CAD Formation Process
The following Board actions are required to create a CAD:
October 15, 2019 EOPS Regular Committee Meeting Agenda Packet- Page 3 of 66
Page 2 of 9
• First Board Meeting — The Board of Directors passes a Resolution of Intention to form the CAD
and approves a CAD boundary map.
Following the passage of the Resolution of Intention, the participating property owners work with their
engineer to complete improvement plans and secure bids to construct the project.
Central San staff prepares an Engineer's Report. Staff also prepares and mails notices and ballots
to owners of all parcels which can connect to the project. Under State Law, the CAD is a voluntary
agreement which is not subject to Proposition 218; Central San's policy and procedure is to follow
the notification and balloting process described in Proposition 218 to the extent possible.
• Second Board Meeting —A public hearing is held to receive input and comments. Following the
public hearing, ballots are tabulated. If there is sufficient property owner support, the Board of
Directors may approve the Engineer's Report, approve the assessments, and order the construction
of the improvements.
Following the order to construct the improvements, the participating property owners retain a
contractor to construct the sewer improvements.
Central San inspects the construction of the sewer improvements to confirm that the construction
conforms to Central San's Standards and Specifications.
• Third Board Meeting — The Board of Directors approves the final assessment amounts and the
levy of the assessments.
Key Features of the CAD Program
The following are key features of the CAD program:
1. The CAD program creates voluntary assessment districts based on a contractual assessment
process. Participating property owners sign a contract with Central San agreeing to pay back funds
initially provided by Central San to cover the design and construction of the infrastructure.
2. The source of funds to cover the assessment district costs are ad valorem tax revenues which are
deposited each year in Central San's Sewer Construction Fund.
3. Assessment district formation criteria includes the requirement of at least five properties directly
tributary to a proposed CAD facility; a minimum of 60% of those properties having existing homes
served by septic tank systems; no more than two dwellings per Participant Parcel; and persons
owning multiple parcels may finance only one parcel through the CAD. This proposed CAD has six
directly tributary properties, all homes are on septic and no property has more than two dwellings,
and no persons own more than one parcel. The proposed CAD, therefore, complies with the terms
set forth in the revised Board Policy No. BP 010 - Contractual Assessment Districts, approved at
the February 1, 2018 Board of Directors meeting.
4. The obligation to pay assessments are recorded as a lien against the property. Participants are given
the option to pay off their assessment within one month of the assessment being set or are allowed
to amortize the debt through payments on their property tax bills.
5. The amortization period for paying back funds to Central San is 10 years with no interest penalty for
early payoff.
6. The CAD offers financing for the property owners'share of the sewer main extension design and
October 15, 2019 EOPS Regular Committee Meeting Agenda Packet- Page 4 of 66
Page 3 of 9
construction costs, including the portion of a private lateral sewer located in the street. Costs
specifically excluded from CAD financing include the cost of installing the lateral sewer on a
participant's property, abandoning an existing septic tank, and Central San's capacity fee and other
fees.
7. CAD participants are responsible for the non-participants'share of the costs of the CAD facilities.
Central San will establish reimbursement fees, which will be collected from non-participant parcels at
the time of connection to the public sewer system. The reimbursement fees will be used to first
reduce the outstanding assessments of the CAD participants, and any remaining reimbursement
fees will be distributed to the CAD participants.
CEQA
Staff has concluded that this project is exempt from the California Environmental Quality Act (CEQA)
under CEQA Guidelines Section 15061(b)(3), since it can be "seen with certainty that there is no
possibility that the activity in question may have a significant adverse effect on the environment." This
certainty is based on Central San's past experience with numerous sewer construction projects of this
nature, the relatively short distance involved, and the impact-limiting nature of Central San's construction
specifications that would be required of the project. Approval of this project will establish the Board of
Directors' independent finding that this project is exempt from CEQA.
ALTERNATIVES/CONSIDERATIONS
Reject or defer initiating formation of the CAD. These actions would halt or delay the CAD proceedings.
FINANCIAL IMPACTS
The CAD program is structured so that the design and construction costs are all paid by the property
owners. There are minor administrative costs for initiating the formation of a CAD. These costs eventually
will be paid by the CAD participants if a CAD is actually formed.
The estimated total costs for this CAD are $400,000.
A new District Project will be created upon approval of the Resolution of I ntention for this CAD. The new
District Project will be funded from the Sewer Construction Fund. These funds will be included in fiscal
year 2020-21 capital budget as the CAD Formation process is not expected to be completed until the end
of this fiscal year.
As noted above, the project is still dependent on approval of the participating property owners as outlined
in Board Policy 010 - Contractual Assessment District. Upon property owner approval, the engineer's
estimate of proposed construction costs will be submitted to the Board of Directors for approval.
COMMITTEE RECOMMENDATION
The Engineering and Operations Committee reviewed this matter at its meeting on October 15, 2019
and recommended
RECOMMENDED BOARD ACTION
Authorize formation of a CAD consisting of seven properties on Ridgewood Road in Alamo by:
1. Adopting a Resolution of Intention to create Ridgewood Road CAD No. 2019-2 for the purpose of
installing sewer improvements (Attachment 2); and
October 15, 2019 EOPS Regular Committee Meeting Agenda Packet- Page 5 of 66
Page 4 of 9
2. Adopting a Resolution approving the boundary of the assessment district (Attachment 3).
Strategic Plan re-In
GOAL ONE: Provide Exceptional Customer Service
Strategy 1 - Build external customer relationships and awareness
GOAL THREE: Be a Fiscally Sound and Effective Water Sector Utility
Strategy 2- Manage costs
ATTACHMENTS:
1. Boundary Map
2. Proposed Resolution of Intention to Initiate CAD Formation
3. Proposed Resolution to Approve Boundary Map
October 15, 2019 EOPS Regular Committee Meeting Agenda Packet- Page 6 of 66
Page 5 of 9
Walnut Creek �� \ \\ RIGG4S / \ POS
—
_ \ \ O \
\ to
Rudgeas-Rd, \ \
DETAIL I O�
AREA [3Alamo sro I I G 00
\ O ne�a//ey els' I `OGV
Pei 1 �
°a \
i
Danville
N Mile 7
3 /
\ \ SIE
\ \ 2155 SIE
\ \\ 2163
\\
2233
\ 2160 \
2230
\\ \ 2401 i
\ �\ 2244 \ \
rn
CD
NCD
\ \ \ I
CD \ \ \ \ \
0 \ \ \ \ \ \
N \ \ \
u \ \
Potential Participant
`\ �\ O Existing Sewer Structure
Existing Sewer
a Potential Sewer
0 100 200
N
Feet CAD Area
W
N Attachment
Proposed Boundaries of Ridgewood RoadCENTRLSAN
6 V 1
Contractual Assessment District No. 2019-2
Z
October 15, 2019 EOPS Regular Committee Meeting Agenda Packet- Page 7 of 66
Attac igmelnt 2
RESOLUTION NO. 2019-
A RESOLUTION OF INTENTION
BY THE CENTRAL CONTRA COSTA SANITARY DISTRICT
TO CREATE RIDGEWOOD ROAD
CONTRACTUAL ASSESSMENT DISTRICT NO. 2019-2
FOR THE PURPOSE OF INSTALLING SEWER IMPROVEMENTS
WHEREAS, the public health and the environment will be best protected by the
expansion of the public sewer system; and
WHEREAS, the construction and installation of a sanitary sewer pipeline, together with
appurtenant work and facilities, in areas not presently connected to the sewer system
will facilitate the elimination of potential public health problems due to failing septic
systems; and
WHEREAS, it would be convenient and advantageous to establish a boundary around
an area within which Central Contra Costa Sanitary District (Central San) and property
owners may enter into contractual assessments and make arrangements to finance
public improvements to parcels which are developed and where the costs and time
delays involved in creating an assessment district pursuant to alternative provisions in
the law would be prohibitively large relative to the cost of the improvement.
THEREFORE, the Board of Directors of Central San (Board) resolves:
1. This Board intends to approve the following improvements under the
authority of Chapter 29, Contractual Assessment Districts (CAD), of the
Municipal Improvement Act of 1911, as amended, to wit: construction and
installation of approximately 1 ,300 linear feet of sanitary sewer line,
together with appurtenant work and facilities located at Ridgewood Road in
Alamo, California.
2. This Board finds that the parcels within the intended CAD are shown within
the boundaries of the map entitled, "Proposed Boundaries of Ridgewood
Road CAD No. 2019- 2."
3. This Board intends to levy a special assessment upon participating parcels
within the described CAD in accordance with the special benefit to be
received by each parcel of land, respectively, from the improvements. The
improvements proposed will not confer any special benefit upon any
publicly-owned land. Hence, there shall be omitted from special assessment
all public streets, alleys, and places, and all land belonging to the United
States, the State of California, Contra Costa County, and Central San now
in use in the performance of a public function.
4. Central San intends to provide loan financing for the improvements, subject
to the availability of funds and any limitation on the commitment or
expenditure of funds for the CAD Program as may be established from
time to time by the Board. Loans shall be repaid by assessments on the
property of participating parcel owners. Assessments shall be paid over a
maximum period of ten (10) years with interest at a rate to be fixed by
Central San.
October 15, 2019 EOPS Regular Committee Meeting Agenda Packet- Page 8 of 66
Page 7 of 9
Central Contra Costa Sanitary District
Resolution No. 2019-
Page 2 of 2
5. The procedure for the collection of assessments will be the placement of
assessments on participating parcel owners' tax bills. The first assessments
may be placed on owners' tax bills in fiscal year 2020-21.
6. This Board appoints Michael Penny, Associate Engineer, as the Engineer of
Work for this project to prepare the report required by Section 5898.22 of
the Streets and Highways Code.
7. A public hearing is expected to be held on this matter before the Board on
March 19, 2020 at Central San's Offices at 5019 Imhoff Place, Martinez,
California. This date is tentative and may be modified in the future.
8. This Board independently finds that this project is exempt from the
California Environmental Quality Act (CEQA) under CEQA Guidelines
Section 15061(b)(3), since it can be "seen with certainty that there is no
possibility that the activity in question may have a significant effect on the
environment." This certainty is based on Central San's past experience with
numerous sewer construction projects of this nature, the relatively short
distance involved, and Central San's impact-limiting construction
specifications that would be required of the project.
PASSED AND ADOPTED this 7th day of November, 2019, by the Board of Directors of
Central San by the following votes:
AYES: Members:
NOES: Members:
ABSENT: Members:
David R. Williams
President of the Board of Directors
Central Contra Costa Sanitary District
County of Contra Costa, State of California
COUNTERSIGNED:
Katie Young
Secretary of the District
Central Contra Costa Sanitary District
County of Contra Costa, State of California
Approved as to form:
Kenton L. Alm, Esq.
Counsel for the District
October 15, 2019 EOPS Regular Committee Meeting Agenda Packet- Page 9 of 66
Page 8 of 9
Attachment 3
RESOLUTION NO. 2019-
RESOLUTION APPROVING BOUNDARY MAP
RIDGWOOD ROAD CONTRACTUAL ASSESSMENT DISTRICT NO. 2019-2
The Board of Directors (Board) of the Central Contra Costa Sanitary District (Central
San) resolves:
A map entitled "Proposed Boundaries of Ridgewood Road Contractual Assessment
District (CAD) No. 2019-2" has been filed with the Secretary of the District.
This Board approves the map and adopts the boundaries shown on the map as
describing the extent of the territory included in a proposed assessment district to be
known as Ridgewood Road CAD No. 2019-2, Central Contra Costa Sanitary District,
County of Contra Costa, California.
This Board intends to levy a contractual assessment upon participating parcels within
the described CAD in accordance with the benefit to be received by each parcel of land,
respectively, from the improvement. There shall be omitted from assessment all public
streets, alleys, and places and all land belonging to the United States, the State of
California, Contra Costa County, and Central San because it has been determined that
no special benefit will be conferred on any such land within Central San.
This Board finds that the map is in the form and contains the matters prescribed by
Section 3110 of the California Streets and Highways Code
This Board directs the Secretary of the District to certify the adoption of this resolution
on the face of the map and to file a copy of the map with the County Recorder for
placement in the Book of Maps of Assessment and Community Facilities Districts.
PASSED AND ADOPTED this 7t" day of November, 2019, the Board of Directors of
Central San by the following vote:
AYES: Members:
NOES: Members:
ABSENT: Members:
David R. Williams
President of the Board of Directors
Central Contra Costa Sanitary District
County of Contra Costa, State of California
October 15, 2019 EOPS Regular Committee Meeting Agenda Packet- Page 10 of 66
Page 9 of 9
Central Contra Costa Sanitary District
Resolution No. 2019-
Page 2 of 2
COUNTERSIGNED:
Katie Young
Secretary of the District
Central Contra Costa Sanitary District
County of Contra Costa, State of California
Approved as to form:
Kenton L. Alm, Esq.
Counsel for the District
October 15, 2019 EOPS Regular Committee Meeting Agenda Packet- Page 11 of 66