HomeMy WebLinkAbout03.a. Review draft Position Paper to authorize the General Manager to execute a professional engineering services agreement in an amount not to exceed $675,000 with Woodard and Curran, Inc. to provide on-call services for the Planning and Development Div Page 1 of 4
Item 3.a.
CENTRAL SAN BOARD OF DIRECTORS
. , , .
POSITION PAPER
. ,
DRAFT
MEETING DATE: AUGUST 26, 2019
SUBJECT: REVIEW DRAFT POSITION PAPER TO AUTHORIZE THE GENERAL
MANAGER TO EXECUTE A PROFESSIONAL ENGINEERING SERVICES
AGREEMENT IN AN AMOUNT NOT TO EXCEED $675,000 WITH WOODARD
AND CURRAN, INC. TO PROVIDE ON-CALL SERVICES FOR THE
PLANNING AND DEVELOPMENT DIVISION FOR A THREE-YEAR TERM
SUBMITTED BY: INITIATING DEPARTMENT:
DANEA GEMMELL, PLANNING AND ENG-PDS-DIVISION MANAGER
DEVELOPMENT SERVICES DIVISION
MANAGER
REVIEWED BY: JEAN-MARC PETIT, DIRECTOR OF ENGINEERING AND TECHNICAL
SERVICES
ISSUE
The Board of Directors' authorization is required for the General Manager to execute agreements in an
amount greater than $100,000.
BACKGROUND
Optimization of Current and Past Practice Using On-call Agreements for Specialized
Expertise. Until now, the Planning and Development Services Division has contracted with many
consulting firms through on-call agreements, but has procured those services on a case-by-case basis
as tasks and needs are identified, sometimes, with multiple agreements with the same consultant but for
different types of services. The purpose of the on-call agreement process is to optimize procurement
and management of on-call services through a consolidated list of pre-qualified consulting firms that can
provide specialized expertise and professional experience for a number of small to medium-sized tasks
which enables staff to address ongoing needs and complete small to medium-sized projects. These on-
call agreements are for specialized expertise and are separate from the individual consulting
agreements typically issued by the Capital Projects Division for evaluating and designing large capital
improvement projects. As documented in the Capital Improvement Budget, capital expenditures are
expected to increase from $45M in Fiscal Year (FY) 2018-19; to $66M in FY 2019-20; to $97M in FY
2020-21; and to $106M in FY 2021-22. As workload increases, need for specialty expertise and support
is essential to complete these critical projects and tasks. The Board's approval of on-call agreements
authorizes Central San staff to assign work to pre-qualified firms through the issuance of a task order
which defines their respective scope of work, project cost, and delivery schedule.
August 26, 2019 REEP Committee Meeting Agenda Packet- Page 3 of 19
Page 2 of 4
Consultant Selection: Staff prepared and posted a Request for Qualifications on PlanetBids and the
Central San website. On May 24, 2019, Statements of Qualifications were received and evaluated for the
Planning and Applied Research section and Special Projects and Asset Management section.After
evaluating the firms based on qualifications, past experience, past performance, availability, and an oral
interview, staff selected Woodard and Curran, Inc. (Woodard and Curran)for an on-call agreement as the
firm best suited for Central San's anticipated needs to support the Planning and Applied Research section
for the following example scope areas:
• Planning Support for Development and Sewer Renovation: Staff requires ongoing consultant
support using the I nfoWorks® I CM collection system model for addressing development requests
to assess capacity, hydraulic impacts, and for evaluating sewer routing alternatives. Example
developments requiring model evaluation include: a proposed re-development in Bishop Ranch
which includes adding 4,500 residential units, over 166,600 square feet of retail space, and a hotel;
the 2,300-acre Concord Community Reuse Development; and several downtown Walnut Creek re-
developments including the BART transit village.
• Planning Support for Sewer Renovation, Shutdowns, and Bypasses: InfoWorks® ICM
modeling support is also used for evaluating the capacity and sizing of sewers renovated under
capital improvement projects and for evaluating capacity to accept large special discharge requests
through Central San's Environmental Compliance section (e.g. temporary contractor dewatering for
construction of the new Contra Costa County Administration Building in downtown Martinez). The
new dynamic model also enables staff and the consultant to provide planning support for proposed
sewer flow bypasses and shutdowns (e.g. helping to identify shutdown durations and windows, key
manholes to monitor, and routing alternatives). For example, recent bypass evaluations were
completed for the Headworks bypass and for planning out sequencing constraints for shutdowns
required at and near several pump stations.
• District Project 8449 — Collection System Modeling Support: Current Woodard and Curran
staff, including Gisa Ju, Chris Van Lienden, and Cathy Greenman, have been involved for many
years supporting Central San in the development, calibration, and use of collection system modeling
software including the launching of Central San's I nfoWorks® I CM model. Woodard and Curran
have significant experience in several modeling platforms including both I nfoWorks® I CM and
I nfoWater®that would be beneficial for Central San. Staff requires ongoing support to update and
improve GIS data used in the model, to continue to add new pipe segments into the working model,
support for any needed level and flow monitoring and calibration, to keep staff trained in the use and
capabilities of the model, and to continue to build critical modeling tools needed to support
development within Central San, the Capital Improvement Program, and for operational support.
• District Project 7306 —Zone 1 Recycled Water: Ongoing support is needed for developing
recycled water standard specifications and details, recycled water customer use guidelines,
maintenance guidelines, and improving and updating other program documentation. Support is also
needed for evaluating new customer uses and connections and assistance in preparing Title 22
Engineering Reports (e.g. for dual plumbing uses such as for the Plant Operations Building, Lobby,
and Board Room restrooms).
In general, the expertise that Woodard and Curran offers will be utilized for hydraulic modeling and support
for ongoing recycled water program implementation, such as, developing recycled water standards,
guidelines, and engineering reports. The services provided will directly benefit Central San customers and
developers, contractors, Operations and Maintenance staff, Capital Projects, Environmental Compliance,
and others. Woodard and Curran have been consistently timely and on budget with all previous requests
and on-call agreements with Central San staff. Staff have been very satisfied with the experience,
performance, and reliability of Woodard and Curran's services.
August 26, 2019 REEP Committee Meeting Agenda Packet- Page 4 of 19
Page 3 of 4
ALTERNATIVES/CONSIDERATIONS
Staff evaluated several alternatives for the Board to consider:
Alternative 1: Execute Three-year On-call Agreement As Recommended By Staff. This alternative
is recommended because it provides staff the support needed to complete the anticipated projects and
tasks, maintain the current high level of service, provides flexibility to staff to address issues as they arise,
and minimizes administrative work by procuring and consolidating support services into fewer contracts.
Alternative 2: Execute Two-year On-call Agreement. This alternative reduces the agreement limits to
cover the next two years of anticipated projects and tasks. Staff could return to the Board for approval to
amend the agreement for a third year of support. This alternative is not recommended because it requires
more administration than Alternative 1 and could limit the flexibility to assign task orders in Year 2 that are
anticipated to continue into Year 3.
Alternative 3: Do Not Approve the Agreement. This alternative would be for the Board to direct staff
not to execute the agreement. This is not recommended because it would result in the postponement of
several tasks and projects, impact staff's ability to address ongoing customer requests and provide
necessary support for Operations & Maintenance activities and capital projects, and overall reduce Central
San's current level of service. The continued support of our I nfoWorks®collection system is critical for
both design and to support developments services.
FINANCIAL IMPACTS
The amount for this on-call agreement is $225,000 per year for a three-year total contract amount of
$675,000. Woodard and Curran have been informed and understand that this on-call agreement is not a
guarantee of work.
This selection process and award of an agreement provides a go-to firm when support is required. This
allows Central San staff to expedite the process of completing work and addressing tasks as needed, and
to respond to needs in an efficient and responsive manner. Ongoing and additional specialty support
needs are anticipated to address upcoming projects and tasks.
The services provided are paid for and included in the Board-approved Budget. No additional funding for
this on-call agreement is required.
COMMITTEE RECOMMENDATION
The Real Estate, Environmental & Planning Committee reviewed this matter at the meeting on August 26,
2019, and recommended
RECOMMENDED BOARD ACTION
Staff recommends authorizing the General Manager to execute an agreement with Woodard and Curran,
I nc. with a cost ceiling of $675,000 for a three-year term, to provide on-call services for the Planning and
Development Services Division.
August 26, 2019 REEP Committee Meeting Agenda Packet- Page 5 of 19
Page 4 of 4
Strategic Plan re-In
GOAL TWO: Strive to Meet Regulatory Requirements
Strategy 1 - Strive to achieve 100%permit compliance in air, water, land, and other regulations, Strategy 2- Strive to
minimize the number of sanitary sewer overflows
GOAL THREE: Be a Fiscally Sound and Effective Water Sector Utility
Strategy 2- Manage costs
GOAL FIVE: Maintain a Reliable Infrastructure
Strategy 1 - Manage assets optimally throughout their lifecycle, Strategy 2- Facilitate long-term capital renewal and
replacement
GOAL SIX: Embrace Technology, Innovation and Environmental Sustainability
Strategy 2- Reduce reliance on non-renewable energy, Strategy 3- Encourage the review and testing of technology to
optimize and modernize business operations
August 26, 2019 REEP Committee Meeting Agenda Packet- Page 6 of 19