Loading...
HomeMy WebLinkAbout01. Presentation 06/03/19 Ya F MECHANICAL AND CONCRETE RENOVATIONS DISTRICT PROJECT 7351 �Y Influent Structure Bypass Tour June 4, 2019 INFLUENT STRUCTURE RENOVATIONS Ki- LN • Bypass pumping system Liner Inspection Replace three Wet Well inlet slide gates(84-inch)w/new Stainless Steel slide gates Replace Martinez Trunk(42-inch)slide gate w/new Stainless Steel slide gate Replace Dry Weather Channel(72-inch x 90-inch)stop plate w/new Stainless Steel stop plate Replace Dry Weather Overflow gate(10-inch x 10-inch)stem,stem guide,and stem nut Replace Wet Weather Bypass gate(84-inch x 48-inch)torque tube and gate operator and place on top of the deck Replace concrete cover and manhole frame and cover 1 06/03/19 PROJECT BACKGROUND Structure 1A Influent Structure 5 a BYPASS SCHEMATIC OF INFLUENT STRUCTURE Y ,. . i1RUClYI1EN cr.m�un� uowo � aR 2 06/03/19 BYPASS PUMPS/PIPING LAYOUT L .✓ yt } PS—Pump Station xf MGD—Million Gallons per Day AERIAL VIEW OF SETUP Pump Station 3 Pump Station 2 In Pump Station 4 A r ) Pump Station 1 y - Y� 9105134 M l 3 06/03/19 AERIAL VIEW OF SETUP 2019/05/24 IRA IT BYPASS SCHEDULE June 10th — installation of Bulkheads and pipe plugs. Start up pump system. Run and test for 7 days. June 17th — Begin construction work. Anticipated to take 2-3 weeks (24/7 uninterrupted operation during the bypass.) Demobilization of Pump System at Influent Structure, commissioning of the equipment and turn over to operations. 't 4