Loading...
HomeMy WebLinkAbout12. Updated presentation Attachment 4 (Updated) FILTER PLANT AND CLEARWELL IMPROVEMENTS, PHASE 1A DISTRICT PROJECT 7361 Board Meeting May 2, 2019 Jean-Marc Petit Director of Engineering and Technical Services g g CENT =F + w 1 . PROJECT OBJECTIVES AND BACKGROUND 'e 04 La CENTRALSAN e,. - � n SIAL PROJECT OBJECTIVES Improve performance and reliability of the Recycled Water Plant (RWP) Filtration Disinfection Recycled Water (RW) storage and distribution (UW and Zone 1 ) Electrical Systems Modernize Automation and Control of RWP Migrate from batch operation to continuous operation Facilitate unattended operation Position RWP to meet future RW Title 22 demands Maximize asset value of existing facilitiesDoNo arrinsCu,�Rd,,�SeR,ou<<e,s "01"01dr w Rehabilitate drink "war� Central CvnSru Cuslu Wndory[HsfNl1 o Repurpose - Minimize investment in infrastructure for future RWP expansion Evaluate Impact and possible integration of Concord Redevelopment and , :.. Water Exchange Projects t _ CENTRALSAN EXISTING RECYCLED WATER PLANT FACILITIES Clearwell Pumping Station (PS ` Backwash (BW) Pumps IM. ' � effi.Ei • - --q2• RW Pumps (Zone 1) UW Pumps } Clearwell: East ' West a IWest East Substation 40CW CW 4 i' Filters (4) ,,, At illL Chemical Conditioning Filter Effluent Pipelines - Filter BW Basinamw Filter Diversion Structure - - - -- -- - _ 1 Forebays -- - - Applied Water PS i.' 4 2 . PROJECT FINDINGS AND RECOMMENDED IMPROVEMENTS SUMMARY OF KEY FINDINGS AND RECOMMENDED IMPROVEMENTS Electrical Power Distribution & 1-t- Motor Control Centers (MCC) v Structure 9000 and Forebays Filters -i Clearwell Disinfection Filter Building AN JJE6 . ti r •r s n s Clearwell: r h' Mechanical, r. tructural and Failing Electrical Equipment;and -..#y,4•�a �' East Cell Clearwell Pb Pump Condition and - + Cover and Liners Sizing ;�. � '{ . � Lr, - �" F Combined Storage and CIz Contact _� �; Filter Capacity and Basins Efficacy w Condition _ �- Pipeline and Pipe .R Electrical Power Supports Condition f Distribution Voltage and Reliability . Water Quality and Hydraulic Bottleneck Filter Building into Forebays Condition and Code Upgrades •F '� p r #' ! ` Electrical Equipment;and - ' AWPS Pump Condition and Sizing -r 3. PROJECT PRIORITIZATION AND PHASING i,4. -ht�, CENTRALSAN � 8 RECOMMENDED IMPLEMENTATION Split Phase 1 recommendations: Phase 1A: Proceed with 30% Design on elements of the project that would not be impacted by a future Water Exchange project Phase 1 B: Postpone improvement or rehabilitation of other elements that could be impacted if a Water Exchange project was to proceed Plan for, but not include, elements of Phase 2 into design which would be triggered and coordinated with CCRP 9 CENTRALSAN PROPOSED PHASE 1A SCOPE FOR RECYCLED WATER PLANT FACILITIES IMPROVEMENTS • Add UW Pump • Replace BW Motors (480V) • New 1 MG Storage Tank • Clearwell: • Rehab East Clearwell Seismic Pining of divider wall °�' ' • New Isolation Gates + x. ..". . . • Chlorine Contact asins • Rehab 1 Filter+ mech. .:m:m • Upgrade Chemical Feed } • les -- Forebays) - �;, Upgrade/Replace Electrical Gear New CW Electrical Facility Replace Substation 40 - 2400V ure 0) x" —"em 10 TOTAL PROJECT COST - ( PHASE 1A) Attachment 1 Filter Plant and Clearwell Improvements — Phase 1A District Project 7361 Estimated Capital Costs of Recommended Items Design, Staff, Total Total Project Project Component and Other Costs' Construction Cost Cost Filter Improvements $930,000 $3,100,000 $4,030,000 Chemical Conditioning System Rehabilitation $270,000 $900,000 $1,170,000 Clearwell Improvements $3,430,000 $11 ,100,00 $14,530,000 Clearwell Pump Station Upgrades $910,000 $2,700,000 $3,610,000 Electrical Distribution System Upgrades $2,460,000 $7,200,000 $9,660,000 Total Ca itaI Costs $8,000,000 $26,000,00 $337040,000 1 Includes $2.5 million for Stantec Consulting Services, Inc. professional engineering services agreement. w. Abl- A041 CENTR 11 11 .. _ ....aw a a 4. PROJECT SCHEDULE PHASE 1A 'e Lo CENTRALSAN e,. 12 ID ask Name Duration Start FinishHalf 1,2Q19 Half Z 2019 HaIF 1,2024 J F M A M 1 J A 5 O N D J F M A M 1 Project Management 17.5 mens 2 Conceptual Engineering 2.45 mons 3 Final Design NTP 0 days ♦411 4 Preliminary Design(30%Design 2 mons Submittal) 5 Design Development(60%Design 4 mons Submittal) 6 Final Design{95%Design Submittal} 4 mons 7 Bid Documents(100%Design 3 mons Submittal) S Bid Period 2mons 9 ward,Contractors NTP 0 mons M 5/22 Bring 30% back to E&O Bring 90% back to E&O Submit Application for SRF L_ Task Pmjart S—muy W—I Task Stmt.a* [ Deadline Project CCCSD Design Schedul SPlit Iracty Task D—fi—only Fi ah—ly 7 Pr�g— Date'Fri 1/25/19 Milestone ♦ Tractive Milesmne Ma-A Rdlur, Frlemal Tasks M—al Progress Summary SJmmaiy D I Mawal SJmmaiy Milesmra A 016h13 5. RECOMMENDATIONS 14 CENT±- - ■ . RECOMMENDED BOARD ACTIONS Staff recommends the following : Authorize the General Manager to amend an existing professional services agreement with Stantec Consulting Services, Inc. to increase the contract ceiling from $990,000 to $ 1 .54 million for design of the Filter Plant and Clearwell Improvements, Phase 1A, District Project 7361 i.' 15 CENTRALSAN QUESTIONS ooe 1,s