Item 3.b.
Av CENTRAL SAN
April 23, 2019
TO: FINANCE COMMITTEE
FROM: CHRIS THOMAS, FINANCE ADMINISTRATOR
REVIEWED BY: PHILIP LEIBER, DIRECTOR OF FINANCE AND ADMINISTRATION
ANN SASAKI, DEPUTY GENERAL MANAGER
ROGER S. BAILEY, GENERAL MANAGER
SUBJECT: REVIEW MARCH 2019 FINANCIAL STATEMENTS AND INVESTMENT
REPORTS
Attached for review are the Financial Statements and Investment Reports as of the date shown above.
Staff is creating several new reports related to areas of interest to the Board that will be added to this
package in the coming months. The first such reports are at the end of this package in new section
entitled "Dashboard Data". The first reports include pension and Other Post-Employment Benefits
(OPEB)funding summary, Capital Improvement Budget (Cl B)transfers, and intra-year projected and
actual cash and investment balances for Running Expense and Sewer Construction funds. Still pending
is a commitments report for CI B expenditures that will aggregate the project-by-project commitments that
have already been shown for the past month as projects are brought to the Engineering & Operations
Committee for review. Comments on the new reports are invited.
Strategic Plan re-In
GOAL THREE: Be a Fiscally Sound and Effective Water Sector Utility
Strategy 1 - Conduct long-range financial planning, Strategy 2- Manage costs
ATTACHMENTS:
1. March 2019 Financial Statements and Investment Reports
April 23, 2019 Regular FINANCE Committee Meeting Agenda Packet- Page 67 of 156
P"MIRRRL(OTRA COSTA SANITARY DISTRICT
April 10,2019
TO: THE BOARD OF DIRECTORS
VIA: CHRIS THOMAS e,'I'
FROM: AMAL LYON
SUBJECT: O&M Variance Analysis
The following are brief year-to-date variance explanations through period ending March 31,2019:
YTD Fav/(Unfav) Variance
O&M Revenues: Budgeted Actual Variance Explanation
First installment received was higher than budgeted. Percentage received varies
Total $37,267,920 $ 43,490,893 $ 6,222,973 annually.
O&M Expenses:
Total Labor Charges $39,176,118 $ 38,650,084 $ 526,034 Expenses are typically lower in the beginning of the year. Some positions budgeted for in
July are filled later in the fiscal year resulting in savings.
Chemicals 1,073,290 934,115 139,175 Chemicals are purchased sporadically throughout the year rather than monthly as is
budgeted. The variance should be reduced by year-end.
Utilities 2,847,989 2,901,914 (53 925) Higher than budget due to high PG&E bills
Repairs&Maintenance 3,973,600 3,294,142 679,458 Lower due to budget spread over 12 months versus actual expense occurring
sporadically throughout the year.
Professional&Legal Services 633,909 517,775 116,134 Due to delay in legal and professional invoices.
Outside Services 2,691,644 1,910,635 781,009 Mostly due to lower Technical Services than budgeted thus far in the fiscal year.Another
main contributor is RSC Services/Xerox Corporation only paid through Oct.Various
billing issues in Dispute.
Other Expenses 2,318,297 1,863,294 455,003 BACWA expense lower than budget by$154k. However,additional BACWA expense
may be incurred later in the fiscal year for Nutrient Studies. Public Agency Fees, Public
information&Tech training expenses lower than budgeted thus far in the fiscal year.
Unfunded Liabilities 11,067,338 11,349,161 (281,823) Variance due to UAAL vacancy. Budgeted vacancy is higher than actual vacancies thus
far in the fiscal year.
All Other 3,156,450 3,166,062 (9 612) Minor variances for multiple account categories.
Total $66,938,635 $ 64,587,182 $ 2,351,453
April 23, 2019 Regular FINANCE Committee Meeting Agenda Packet- Page 68 of 156
Page 2 of 41
J&V lics entral Contra Costa Sanitary District
Protecting public health and the environment
Revenue Report MTD
Fund: 001 - RUNNING EXPENSE(O&M)
March 2019 Fiscal Period 9/2019
Report Generated on Apr 10, 2019 9:25:27 AM
Category MTD Estimate MTD Actual MTD%Rev YTD Estimate YTD Actual YTD%Rev Annual Estimate Unrealized Balance Annual%Rev
Concord $0 $0 0.0% $0 $0 0.0% $14,800,000 $14,800,000 0.0%
HHW $8,000 $8,464 5.8% $82,000 $74,564 -9.1% $929,000 $854,436 8.0%
Other $243,664 $367,183 50.7% $3,027,676 $3,582,181 18.3% $4,123,000 $540,819 86.9%
Sewer Service Charges $14,916 $13,295 -10.9% $34,158,244 $39,834,148 16.6% $67,073,732 $27,239,584 59.4%
Total Revenue $266,580 $388,943 45.9% $37,267,920 $43,490,893 16.7% $86,925,732 $43,434,839 50.0%
Page 3 of 41
ACV ts entral Contra Costa Sanitary District
Protecting public health and the environment
Expense Report - District Summary MTD
Fund: 001 -RUNNING EXPENSE(O&M)
March 2019 Fiscal Period 09/2019
Report Generated on Apr 10, 2019 9:27:11 AM
$70,000,000.00 $66,938,635 Budget
Actual
$64,587,182
$60,000,000.00 $58,48
$51,37 411,026
$50,000,000.00
$44,52 ,586,006
$40,000,000.00 $37,537,572 $42,592,870
$35,666,108
$30,000,000.00 $30,229,184
$23,129,558 $28,064,083
$20,000,000.00 $21,657,968
$16,222,021
$14,989,002
$10,000,000.00 $8,838,210
$8,238,746
$0.00
Jul(1)2018 Aug(2)2018 Sep(3)2018 Oct(4)2018 Nov(5)2018 Dec(6)2018 Jan(7)2019 Feb(8)2019 Mar(9)2019
Fiscal Periods
Page 4 of 41
AwLcentral Contra Costa Sanitary District
Protecting public health and the environment
Expense Report - District Summary MTD
Fund: 001 - RUNNING EXPENSE(O&M)
March 2019 Fiscal Period 09/2019
Report Generated on Apr 10, 2019 9:27:11 AM
Category Period Budget Period Actual Period Variance % YTD Budget YTD Actual YTD Variance % Annual %
Budget
SALARIES&WAGES $2,964,217 $2,771,682 $192,535 6.5% $26,677,953 $26,210,221 $467,732 1.8% $35,571,037 73.7%
EMPLOYEE BENEFITS $1,686,321 $1,759,793 ($73,472) -4.4% $15,482,889 $15,338,966 $143,923 0.9% $20,993,695 73.1%
CAPITALIZED ADM OVERHEAD ($331,636) ($509,397) $177,761 -53.6% ($2,984,724) ($2,899,103) ($85,621) 2.9% ($3,979,723) 72.8%
DIRECTOR FEES&EXPENSES $14,041 $12,300 $1,741 12.4% $126,369 $118,249 $8,120 6.4% $168,494 70.2%
CHEMICALS $121,547 $190,349 ($68,802) -56.6% $1,073,290 $934,115 $139,175 13.0% $1,459,000 64.0%
UTILITIES $345,206 $409,868 ($64,662) -18.7% $2,847,989 $2,901,914 ($53,925) -1.9% $4,142,550 70.1%
REPAIRS&MAINTENANCE $427,431 $386,049 $41,382 9.7% $3,973,600 $3,294,142 $679,459 17.1% $5,414,644 60.8%
HAULING&DISPOSAL $93,867 $90,029 $3,838 4.1% $696,803 $656,494 $40,309 5.8% $1,126,475 58.3%
PROFESSIONAL&LEGAL SERV $72,101 $58,876 $13,225 18.3% $633,909 $517,776 $116,133 18.3% $845,300 61.3%
OUTSIDE SERVICES $411,726 $334,422 $77,304 18.8% $2,691,644 $1,910,635 $781,009 29.0% $3,510,822 54.4%
SELF-INSURANCE EXPENSE $0 $5 ($5) 0.0% $779,500 $779,505 ($5) 0.0% $779,500 100.0%
MATERIALS&SUPPLIES $175,642 $233,071 ($57,429) -32.7% $1,553,778 $1,611,812 ($58,034) -3.7% $2,108,126 76.5%
OTHER EXPENSES $132,134 $121,525 $10,609 8.0% $2,318,297 $1,863,294 $455,003 19.6% $2,777,258 67.1%
UNFUNDED LIABILITIES $2,343,356 $2,317,584 $25,772 1.1% $11,067,338 $11,349,161 ($281,823) -2.5% $14,803,278 76.7%
Total Expenses $8,455,953 $8,176,156 $279,797 3.3% $66,938,635 $64,587,182 $2,351,453 3.5% $89,720,456 72.0%
Color Key: 0 to 10%over budget > 10%over budget M
Page 5 of 41
ACV Central Contra Costa Sanitary District
Protecting public health and the environment
Expense Report - By Department MTD
Fund: 001 - RUNNING EXPENSE (O&M)
March 2019 Fiscal Period 09/2019
Report Generated on Apr 10, 2019 9:29:02 AM
$4,000,000 ❑Period Budget $25,000,000 ' ❑YTD Budget
❑Period Actual ❑ YTD Actual
$20,000,000-
$3,000,000-
$15,000,000-
$2,000,000-
$10,000,000-
$1,000,000-
$5,000,000
15,000,000$2,000,000 $10,000,000$1,000,000 $5,000,000
LlLL�
$0 $0 - I
Po�� � G°���°�� Q��c°e� S�P �� Po���`s\��°�c�`�``�� °��o �oQ�c Q J�Q S�P �
Period Budget Period Actual Period Variance YTD Budget YTD Actual YTD Variance
ADMINISTRATION $3,376,515 $3,279,296 $97,219 $20,790,498 $19,015,295 $1,775,203
ENGINEERING $1,369,715 $1,117,046 $252,669 $12,771,794 $12,348,226 $423,568
COLLECTION SYSTEM OPS. $1,162,280 $1,242,269 ($79,989) $10,357,021 $10,445,684 ($88,663)
PLANT OPERATIONS $2,173,526 $2,173,565 ($39) $19,725,601 $19,799,577 ($73,976)
PUMP STATIONS $244,538 $258,838 ($14,300) $2,141,976 $2,093,254 $48,722
RECYCLED WATER $129,379 $105,141 $24,238 $1,151,745 $885,145 $266,600
Totals $8,455,953 $8,176,156 $279,797 $66,938,635 $64,587,182 $2,351,453
Page 6 of 41
ZwLcentral Contra Costa Sanitary District
Protecting public health and the environment
Expense Report - By Department MTD
Fund: 001 - RUNNING EXPENSE(O&M)
March 2019 Fiscal Period 09/2019
Report Generated on Apr 10, 2019 9:29:02 AM
Department: ADMINISTRATION
Categor;711k. Period Budget Period Actual Period Variance % YTD Budget YTD Actual YTD Variance % Annual %
SALARIES&WAGES $611,365 $549,919 $61,446 10.1% $5,502,285 $5,086,995 $415,290 7.5% $7,336,515 69.3%
EMPLOYEE BENEFITS $652,688 $743,416 ($90,728) -13.9% $6,180,192 $5,851,187 $329,005 5.3% $8,588,771 68.1%
CAPITALIZED ADM OVERHEAD ($4,147) ($2,219) ($1,928) 46.5% ($37,323) ($23,555) ($13,768) 36.9% ($49,764) 47.3%
DIRECTOR FEES&EXPENSES $14,041 $12,300 $1,741 12.4% $126,369 $118,249 $8,120 6.4% $168,494 70.2%
UTILITIES $10,816 $20,272 ($9,456) -87.4% $97,344 $99,317 ($1,973) -2.0% $129,800 76.5%
REPAIRS&MAINTENANCE $70,592 $25,930 $44,662 63.3% $860,548 $584,809 $275,739 32.0% $1,132,390 51.6%
PROFESSIONAL&LEGAL SERV $55,771 $44,362 $11,409 20.5% $486,939 $408,084 $78,855 16.2% $649,300 62.8%
OUTSIDE SERVICES $265,355 $183,278 $82,077 30.9% $1,280,029 $802,786 $477,243 37.3% $1,647,300 48.7%
SELF-INSURANCE EXPENSE $0 $5 ($5) 0.0% $779,500 $779,505 ($5) 0.0% $779,500 100.0%
MATERIALS&SUPPLIES $16,329 $21,257 ($4,928) -30.2% $146,961 $93,298 $53,663 36.5% $196,025 47.6%
OTHER EXPENSES $57,336 $78,541 ($21,205) -37.0% $753,199 $627,405 $125,794 16.7% $960,040 65.4%
UNFUNDED LIABILITIES $1,626,369 $1,602,235 $24,134 1.5% $4,614,455 $4,587,214 $27,241 0.6% $6,199,286 74.0%
ADMINISTRATION Total Expenses $3,376,515 $3,279,296 $97,219 2.9% $20,790,498 $19,015,295 $1,775,203 8.5% $27,737,657 68.6%
Color Key: 0 to 10%over budget > 10%over budget M
Page 7 of 41
ZwLcentral Contra Costa Sanitary District
Protecting public health and the environment
Expense Report - By Department MTD
Fund: 001 - RUNNING EXPENSE(O&M)
March 2019 Fiscal Period 09/2019
Report Generated on Apr 10, 2019 9:29:02 AM
Department: ENGINEERING
Category Period Budget Period Actual Period Variance % YTD Budget YTD Actual YTD Variance % Annual %
Budget
SALARIES&WAGES $833,166 $745,214 $87,952 10.6% $7,498,494 $7,473,700 $24,794 0.3% $9,998,042 74.8%
EMPLOYEE BENEFITS $329,253 $311,618 $17,635 5.4% $2,963,277 $3,084,098 ($120,821) -4.1% $3,951,391 78.1%
CAPITALIZED ADM OVERHEAD ($296,790) ($419,543) $122,753 -41.4% ($2,671,110) ($2,617,406) ($53,704) 2.0% ($3,561,499) 73.5%
UTILITIES $14,432 $17,937 ($3,505) -24.3% $129,888 $139,760 ($9,872) -7.6% $173,200 80.7%
REPAIRS&MAINTENANCE $14,281 $14,127 $154 1.1% $128,529 $63,256 $65,273 50.8% $171,400 36.9%
HAULING&DISPOSAL $44,867 $37,630 $7,237 16.1% $255,803 $291,303 ($35,500) = $538,425 54.1%
PROFESSIONAL&LEGAL SERV $14,248 $14,033 $215 1.5% $128,232 $87,041 $41,191 32.1% $171,000 50.9%
OUTSIDE SERVICES $96,931 $94,614 $2,317 2.4% $979,321 $653,333 $325,988 33.3% $1,270,142 51.4%
MATERIALS&SUPPLIES $32,915 $43,377 ($10,462) -31.8% $296,235 $238,766 $57,469 19.4% $395,050 60.4%
OTHER EXPENSES $22,962 $9,504 $13,458 58.6% $692,075 $457,950 $234,125 33.8% $764,812 59.9%
UNFUNDED LIABILITIES $263,450 $248,536 $14,914 5.7% $2,371,050 $2,476,427 ($105,377) -4.4% $3,161,443 78.3%
ENGINEERING Total Expenses $1,369,715 $1,117,046 $252,669 18.4% $12,771,794 $12,348,226 $423,568 3.3% $17,033,406 72.5%
Color Key: 0 to 10%over budget > 10%over budget M
Page 8of41
' Central Contra Costa Sanitary District
Protecting public health and the environment
Expense Report - By Department MTD
Fund: 001 - RUNNING EXPENSE(O&M)
March 2019 Fiscal Period 09/2019
Report Generated on Apr 10, 2019 9:29:02 AM
Department: COLLECTION SYSTEM OPS.
Category Period Budget Period Actual Period Variance % YTD Budget YTD Actual YTD Variance % Annual %
Budget
SALARIES&WAGES $522,693 $545,607 ($22,914) -4.4% $4,704,237 $4,782,268 ($78,031) -1.7% $6,272,384 76.2%
EMPLOYEE BENEFITS $255,254 $262,347 ($7,093) -2.8% $2,297,286 $2,345,055 ($47,769) -2.1% $3,063,394 76.6%
CAPITALIZED ADM OVERHEAD ($2,676) ($2,978) $302 -11.3% ($24,084) ($28,361) $4,277 = ($32,120) 88.3%
UTILITIES $12,115 $10,829 $1,286 10.6% $109,035 $107,997 $1,038 1.0% $145,400 74.3%
REPAIRS&MAINTENANCE $122,873 $145,171 ($22,298) -18.1% $1,007,358 $878,994 $128,364 12.7% $1,474,504 59.6%
HAULING&DISPOSAL $10,916 $3,970 $6,946 63.6% $98,244 $53,340 $44,904 45.7% $131,000 40.7%
PROFESSIONAL&LEGAL SERV $625 $241 $384 61.5% $5,625 $1,732 $3,893 69.2% $7,500 23.1%
OUTSIDE SERVICES $4,972 $2,468 $2,505 50.4% $44,748 $46,524 ($1,776) -4.0% $59,680 78.0%
MATERIALS&SUPPLIES $63,074 $91,910 ($28,836) -45.7% $550,666 $642,340 ($91,674) = $756,951 84.9%
OTHER EXPENSES $10,529 $11,743 ($1,214) -11.5% $106,761 $96,562 $10,199 9.6% $138,445 69.7%
UNFUNDED LIABILITIES $161,905 $170,961 ($9,056) -5.6% $1,457,145 $1,519,234 ($62,089) -4.3% $1,942,922 78.2%
COLLECTION SYSTEM OPS.Total $1,162,280 $1,242,269 ($79,989) -6.9% $10,357,021 $10,445,684 ($88,663) -0.9% $13,960,060 74.8%
Expenses
Color Key: 0 to 10%over budget > 10%over budget
Page 9of41
ZwLcentral Contra Costa Sanitary District
Protecting public health and the environment
Expense Report - By Department MTD
Fund: 001 - RUNNING EXPENSE(O&M)
March 2019 Fiscal Period 09/2019
Report Generated on Apr 10, 2019 9:29:02 AM
Department: PLANT OPERATIONS
Category Period Budget Period Actual Period Variance % YTD Budget YTD Actual YTD Variance % Annual %
Budget
SALARIES&WAGES $869,326 $810,479 $58,847 6.8% $7,823,934 $7,778,399 $45,535 0.6% $10,432,017 74.6%
EMPLOYEE BENEFITS $380,506 $375,218 $5,288 1.4% $3,424,554 $3,494,400 ($69,846) -2.0% $4,566,639 76.5%
CAPITALIZED ADM OVERHEAD ($28,023) ($84,657) $56,634 -202.1% ($252,207) ($229,781) ($22,426) 8.9% ($336,340) 68.3%
CHEMICALS $93,715 $187,147 ($93,432) -99.7% $843,635 $806,859 $36,776 4.4% $1,125,000 71.7%
UTILITIES $250,215 $288,219 ($38,004) -15.2% $2,031,103 $2,102,524 ($71,421) -3.5% $3,002,600 70.0%
REPAIRS&MAINTENANCE $186,609 $162,368 $24,241 13.0% $1,679,481 $1,524,141 $155,340 9.2% $2,239,400 68.1%
HAULING&DISPOSAL $37,351 $47,488 ($10,137) -27.1% $336,159 $303,949 $32,210 9.6% $448,250 67.8%
PROFESSIONAL&LEGAL SERV $291 $241 $50 17.2% $2,619 $1,872 $747 28.5% $3,500 53.5%
OUTSIDE SERVICES $19,912 $29,113 ($9,201) -46.2% $179,208 $256,055 ($76,847) $239,000 107.1%
MATERIALS&SUPPLIES $58,871 $70,957 ($12,086) -20.5% $519,839 $611,708 ($91,869) $706,600 86.6%
OTHER EXPENSES $35,534 $18,417 $17,117 48.2% $714,305 $637,085 $77,220 10.8% $844,615 75.4%
UNFUNDED LIABILITIES $269,219 $268,576 $643 0.2% $2,422,971 $2,512,367 ($89,396) -3.7% $3,230,674 77.8%
PLANT OPERATIONS Total Expenses $2,173,526 $2,173,565 ($39) 0.0% $19,725,601 $19,799,577 ($73,976) -0.4% $26,501,955 74.7%
Color Key: 0 to 10%over budget > 10%over budget M
Page 10 of 41
j&V ts entral Contra Costa Sanitary District
Protecting public health and the environment
Expense Report - By Department MTD
Fund: 001 - RUNNING EXPENSE(O&M)
March 2019 Fiscal Period 09/2019
Report Generated on Apr 10, 2019 9:29:02 AM
Department: PUMP STATIONS
Category Period Budget Period Actual Period Variance % YTD Budget YTD Actual YTD Variance % Annual %
Budget
SALARIES&WAGES $80,539 $83,045 ($2,506) -3.1% $724,851 $760,360 ($35,509) -4.9% $966,479 78.7%
EMPLOYEE BENEFITS $33,186 $40,339 ($7,153) -21.6% $298,674 $337,122 ($38,448) M $398,256 84.6%
CAPITALIZED ADM OVERHEAD $0 $0 $0 0.0% $0 $0 $0 0.0% $0 0.0%
CHEMICALS $20,833 $0 $20,833 100.0% $166,664 $61,841 $104,823 62.9% $250,000 24.7%
UTILITIES $43,045 $61,218 ($18,173) -42.2% $349,372 $389,531 ($40,159) = $516,550 75.4%
REPAIRS&MAINTENANCE $30,661 $38,454 ($7,793) -25.4% $275,949 $231,998 $43,951 15.9% $367,950 63.1%
HAULING&DISPOSAL $733 $940 ($207) -28.3% $6,597 $7,902 ($1,305) ®.'. $8,800 89.8%
OUTSIDE SERVICES $6,683 $600 $6,083 91.0% $60,147 $13,450 $46,697 77.6% $80,200 16.8%
MATERIALS&SUPPLIES $3,466 $5,571 ($2,105) -60.7% $31,194 $18,557 $12,637 40.5% $41,600 44.6%
OTHER EXPENSES $2,979 $1,396 $1,583 53.1% $26,811 $18,573 $8,238 30.7% $35,796 51.9%
UNFUNDED LIABILITIES $22,413 $27,275 ($4,862) -21.7% $201,717 $253,920 ($52,203)= $268,953 94.4%
PUMP STATIONS Total Expenses $244,538 $258,838 ($14,300) -5.8% $2,141,976 $2,093,254 $48,722 2.3% $2,934,584 71.3%
Color Key: 0 to 10%over budget > 10%over budget M
Page 11 of 41
' Central Contra Costa Sanitary District
Protecting public health and the environment
Expense Report - By Department MTD
Fund: 001 - RUNNING EXPENSE(O&M)
March 2019 Fiscal Period 09/2019
Report Generated on Apr 10, 2019 9:29:02 AM
Department: RECYCLED WATER
Category Period Budget Period Actual Period Variance % YTD Budget YTD Actual YTD Variance % Annual %
Budget
SALARIES&WAGES $47,128 $37,419 $9,709 20.6% $424,152 $328,498 $95,654 22.6% $565,600 58.1%
EMPLOYEE BENEFITS $35,434 $26,854 $8,580 24.2% $318,906 $227,105 $91,801 28.8% $425,244 53.4%
CHEMICALS $6,999 $3,201 $3,798 54.3% $62,991 $65,416 ($2,425) -3.8% $84,000 77.9%
UTILITIES $14,583 $11,393 $3,190 21.9% $131,247 $62,785 $68,462 52.2% $175,000 35.9%
REPAIRS&MAINTENANCE $2,415 $0 $2,415 100.0% $21,735 $10,944 $10,791 49.7% $29,000 37.7%
PROFESSIONAL&LEGAL SERV $1,166 $0 $1,166 100.0% $10,494 $19,047 ($8,553) = $14,000 136.1%
OUTSIDE SERVICES $17,873 $24,350 ($6,477) -36.2% $148,191 $138,487 $9,704 6.5% $214,500 64.6%
MATERIALS&SUPPLIES $987 $0 $987 100.0% $8,883 $7,145 $1,738 19.6% $11,900 60.0%
OTHER EXPENSES $2,794 $1,924 $870 31.2% $25,146 $25,719 ($573) -2.3% $33,550 76.7%
RECYCLED WATER Total Expenses $129,379 $105,141 $24,238 18.7% $1,151,745 $885,145 $266,600 23.1% $1,552,794 57.0%
Color Key: 0 to 10%over budget > 10%over budget M
Page 12 of 41
CENTRAL CONTRA COSTA SANITARY DISTRICT
RUNNING EXPENSE FUND
TEMPORARY INVESTMENTS
MARCH,2019
INVESTMENTS
(cents omitted) INTEREST INCOME
DATE OF
Days to ANNUAL CASH B.O.M. PURCHASE E.O.M. E.O.M %of CURRENT B.O.M. E.O.M.
NO. ISSUER TYPE PURCHASE MATURITY Maturity YIELD OUTLAY FACE VALUE (MATURITY) FACE VALUE MKT VALUE Portfolio MONTH CUMULATIVE CUMULATIVE
519 State of Calif. LAIF 10/99- ------- 1 (1) $6,000,000 $8,000,000 ($2,000,000) $6,000,000 $6,031,210 23.08% $15,910 $205,120 $221,030
RE05 US Gov't FHLMC 08/31/18 03/04/19 0 2.266% 4,943,215 5,000,000 (5,000,000) 0.00% 921 55,864 56,785
RE07 FHLB FED AGENCY 12/24/18 03/22/19 0 2.424% 4,970,544 5,000,000 (5,000,000) 0.00% 7,029 22,426 29,456
RE08 FHLB FED AGENCY 12/24/18 03/21/19 0 2.448% 4,971,000 5,000,000 (5,000,000) 0.00% 6,667 22,333 29,000
RE09 FHLB FED AGENCY 12/24/18 7/22/19 112 2.558% 4,927,375 5,000,000 5,000,000 4,962,350 19.23% 10,721 23,171 33,892
RE10 FHLB FED AGENCY 12/24/18 7/23/19 113 2.558% 4,927,029 5,000,000 5,000,000 4,962,000 19.23% 10,721 23,171 33,892
RE11 FHLMC FED AGENCY 3/4/19 7/23/19 113 2.420% 4,952,608 5,000,000 5,000,000 4,962,000 19.23% 9,411
RE12 FHLB FED AGENCY 3/22/19 7/23/19 113 2.410% 4,958,829 5,000,000 5,000,000 4,962,000 19.23% 3,347
(3) $40,650,601 $33,000,000 ($7,000,000) $26,000,000 $25,879,560 100.00% 64,727 352,085 404,054
(2)
58,783 58,783
$64,727 $410,868 $462,837
NOTE:(1) Annual yield of Local Agency Investment Fund(LAIF)varies with the composition of the Fund.
The estimated yield as of March,2019 was 2.44%.
(2) The face value indicates the value of the investment if held until maturity,which is the usual District Practice.
(3) The weighted average yield of the total Running Expense portfolio is 2.4768%.
(4) The market value of the portfolio on March,2019 was$25,879,560.
(5) The District has sufficient funds available combined with secured SSC and Property Tax received in December and April to cover
six months of cash flow needs.
COMPLIANCE STATEMENT:
All investments comply with the District's internal investment policy approved by the Board of Directors.
April 23, 2019 Regular FINANCE Committee Meeting Agenda Packet- Page 79 of 156
Page 13 of 41
' Central Contra Costa sanitary District
Protecting public health and the environment
Balance Sheet
Fund:001-RUNNING EXPENSE(O&M)
March 2019 Fiscal Period 9/2019
Summarized by Account
Report Generated on Apr 10,2019 9:21:32 AM
TOTAL ASSETS
Current Assets
CASH ACCOUNTS/CASH $1,399,960
CASH ACCOUNTS/PAYROLL CLEARING $20,000
CASH ACCOUNTS/PETTY CASH $3,400
CASH ACCOUNTS/TEMPORARY INVESTMENTS $26,000,000
DEFERRED OUTFLOWS/DEFERRED OUTFLOWS-GASB 68 $21,503,021
DEFERRED OUTFLOWS/DEFERRED OUTFLOWS-GASB 75 $30,400
DUE FROM/DUE FROM S/C $33,128,906
DUE FROM/DUE FROM S/I $788,100
INVENTORY/SUPPLIES&MATERIAL INV $2,163,349
PREPAID ACCOUNTS/PREPAID CAFETERIA PLAN $46,104
PREPAID ACCOUNTS/PREPAID COMMUTER PLAN $572
PREPAID ACCOUNTS/PREPAID EXPENSES $1,000,873
PREPAID ACCOUNTS/PREPAID INSURANCE $2,867
PREPAID ACCOUNTS/PREPAID RETIREMENT $5,681,093
RECEIVABLE ACCOUNTS/A/R-SSC DIRECT BILL $127,990
RECEIVABLE ACCOUNTS/ACCOUNTS RECEIVABLE $413,063
RECEIVABLE ACCOUNTS/ACCOUNTS RECEIVABLE-COBRA $1,837
RECEIVABLE ACCOUNTS/ACCRUED INTEREST A/R $70,769
RECEIVABLE ACCOUNTS/COMPUTER PURCHASE PROGRAM $12,419
RECEIVABLE ACCOUNTS/DEPOSITS TO BANK ESCROW $100,640
RECEIVABLE ACCOUNTS/OVERTIME INSPECTION A/R $3,423
Current Assets $92,498,784
Net Property,Plant and Equipment
CONTRIBUTED FIXED ASSETS/ACC DEPR-CONTRIB ASSETS ($61,491,489)
CONTRIBUTED FIXED ASSETS/CONTRIBUTED SEWER LINES $159,795,333
FIXED ASSETS-C.I.P./CONSTRUCTION IN PROGRESS $35,820,635
FIXED ASSETS/ACC DEPR-BUILDINGS ($14,154,661)
FIXED ASSETS/ACC DEPR-FURN&EQUIP ($9,236,015)
FIXED ASSETS/ACC DEPR-OUTFALL ($3,768,376)
FIXED ASSETS/ACC DEPR-PUMPING STATIONS ($35,288,443)
FIXED ASSETS/ACC DEPR-SEWAGE COL SYS ($73,525,809)
FIXED ASSETS/ACC DEPR-TREATMENT PLANT ($228,809,775)
FIXED ASSETS/ACC DEPR-VEHICLES ($5,217,732)
FIXED ASSETS/ACCUM DEPRC-RECY WATER ($9,680,325)
FIXED ASSETS/BUILDINGS $44,238,508
FIXED ASSETS/FURNITURE&EQUIPMENT $13,841,424
FIXED ASSETS/INTANGIBLE ASSETS $4,949,507
FIXED ASSETS/LAND $17,320,570
FIXED ASSETS/OUTFALL SEWERS $11,371,574
FIXED ASSETS/PUMPING STATIONS $57,327,020
FIXED ASSETS/RECY WATER INFRASTRUCTURE $20,292,366
FIXED ASSETS/SEWAGE COLLECTION FACIL $379,247,498
FIXED ASSETS/TREATMENT PLANT $341,675,108
FIXED ASSETS/VEHICLES $7,695,424
Net Property,Plant and Equipment $652,402,342
TOTAL ASSETS $744,901,126
TOTAL LIABILITIES AND FUND EQUITY
Total Liabilities
ACCOUNTS PAYABLE/SALES TAX PAYABLE $0
CURRENT LIABILITIES/ACCOUNTS PAYABLE ($741,528)
CURRENT LIABILITIES/ACCRUED COMPENSATED ABS. ($4,448,044)
CURRENT LIABILITIES/ACCRUED WAGES PAYABLE ($1,198,082)
Page 14 of 41
' Central Contra Costa sanitary District
Protecting public health and the environment
Balance Sheet
Fund:001-RUNNING EXPENSE(O&M)
March 2019 Fiscal Period 9/2019
Summarized by Account
Report Generated on Apr 10,2019 9:21:32 AM
CURRENT LIABILITIES/CAFETERIA PLAN PAYABLE ($16,701)
CURRENT LIABILITIES/COMMUTER PLAN PAYABLE ($670)
CURRENT LIABILITIES/MISC DEPOSITS/LIABILITIES ($139,931)
CURRENT LIABILITIES/OTHER PAYROLL WITHHOLDING ($7,583)
CURRENT LIABILITIES/PERMIT CLEARING ($91)
CURRENT LIABILITIES/REFUNDABLE DEPOSITS ($41,080)
CURRENT LIABILITIES/RETIREMENT CONTRIB W/H $2
CURRENT LIABILITIES/WORKERS'COMP INS PAYABLE $96,824
DEF.COMP.CONTRIB W/H/ICMA $0
DUE TO/DUE TO DEBT FUND ($3,528,591)
DUE TO/DUE TO S/C ($23,610,448)
DUE TO/DUE TO S/I ($783,408)
LIABILITIES-LONG TERM/DEFERRED INFLOWS-GASB 68 ($28,076,634)
LIABILITIES-LONG TERM/NET OPEB LIAB-GASB 75 ($46,350,454)
LIABILITIES-LONG TERM/NET PENSION LIAB-GASB 68 ($63,806,000)
LIABILITIES-LONG TERM/POST EMP.BENEFIT-PENSION $5,571,088
LIABILITIES/UNEARNED INTEREST ($153,617)
MEDICAL LIABILITIES/DELTA DENTAL $478
MEDICAL LIABILITIES/DISABILITY INS $154
MEDICAL LIABILITIES/HEALTH NET $0
MEDICAL LIABILITIES/KAISER PERMANENTE $3,222
MEDICAL LIABILITIES/LIFE INS $30
MEDICAL LIABILITIES/OCCUPATIONAL HEALTH $3,136
MEDICAL LIABILITIES/POST EMP.BENEFIT-OPEB $395,700
PAYROLL TAXES WITHHELD/CALIFORNIA WITHHOLDING $368
PAYROLL TAXES WITHHELD FEDERAL WITHHOLDING $792
REIMBURSEMENT FEES ($54,466)
Total Liabilities ($166,885,534)
Total Fund Equity
FUND EQUITY/AVAILABLE FUND BALANCE ($38,409,231)
FUND EQUITY/CAPITAL COST SHARING ($115,056,482)
FUND EQUITY/CONTRIBUTED SEWER LINES ($159,795,333)
FUND EQUITY/EXPENDITURE SUMMARY $64,587,182
FUND EQUITY/GENERAL FIXED ASSET GROUP ($210,549,556)
FUND EQUITY/STATE R FED CAPITAL GRANT ($75,301,279)
YEAR TO DATE REVENUES/REVENUE SUMMARY ($43,490,893)
Total Fund Equity ($578,015,592)
TOTAL LIABILITIES AND FUND EQUITY ($744,901,126)
Page 15 of 41
CENTRAL CONTRA COSTA SANITARY DISTRICT
April 10, 2019
TO: THE BOARD OF DIRECTORS
VIA: CHRIS THOMAS CO--
FROM: AMAL LYON W
SUBJECT: Sewer Construction Variance Analysis
The following are brief year-to-date variance explanations through period ending March 31,2019:
YTD YTD Fav/(Unfav)
SIC Revenues: Budgeted Actual Variance Explanation
SSC&Property tax revenue received from the County
Total $ 24,446,229 $ 29,188,396 $ 4,742,167 was higher than budgeted.
FY YTD FY
S/C Expenses: Budget* Actual Remaining %Spent
Total $ 52,287,827 $ 26,049,059 $ 26,238,768 49.82%
Includes 17/18 carry-over($6,968,827)
April 23, 2019 Regular FINANCE Committee Meeting Agenda Packet- Page 82 of 156
Page 16 of 41
AIMILSentral Contra Costa Sanitary District
Protecting public health and the environment
Revenue Report MTD
Fund: 002-SEWER CONSTRUCTION (Capital)
March 2019 Fiscal Period 9/2019
Report Generated on Apr 10, 2019 9:25:27 AM
Category MTD Estimate MTD Actual MTD%Rev YTD Estimate YTD Actual YTD%Rev Annual Estimate Unrealized Balance Annual%Rev
Concord $0 $0 0.0% $0 $0 0.0% $7,150,000 $7,150,000 0.0%
Other $625,581 $710,302 13.5% $10,483,229 $12,600,699 20.2% $20,813,000 $8,212,301 60.5%
Sewer Service Charges $0 $5,536 0.0% $13,963,000 $16,587,697 18.8% $27,926,268 $11,338,571 59.4%
Total Revenue $625,581 $715,839 14.4% $24,446,229 $29,188,396 19.4% $55,889,268 $26,700,872 52.2%
Page 17 of 41
Sewer Fund (Capital) Spending FY 18-19
$35,000,000
$32,401,823
$29,197,153
$30,000,000
$23,890,698 $26,513,645
$25,000,000
$19,397,124 Page f 4 1 lo $26,049,059
$20,000,000 $23,808,150
$20,736,779
$15,000,000 $13,377,477 $18,379,941
$9,429,510 $14,503,936
$10,000,000 $11,543,304
$3,996,336
$5,000,000
$1,426,829 $8,485,345
$ $3,404,835
$1,600,939
July August September October November December January February Mnrrh
Projected* Actual
Columnl July August September October November December January February March
Projected* $ 1,426,829 $ 3,996,336 $ 9,429,510 $ 13,377,477 $ 19,397,124 $ 23,890,698 $ 26,513,645 $ 29,197,153 $ 32,401,823
Actual 1,600,939 3,404,835 8,485,345 11,543,304 14,503,936 18,379,941 20,736,779 23,808,150 26,049,059
*Projected - Current year budget allocated by month based on historical spending in previous 2 years
A-,-;I ')0 004n o .,,1 CIAIAAIr'C r-,.,....,...,;++-- rA--+;-- A-..-,+, r)-.,.I,,.+ 17).--- 0n _F -1 M2
Page 18 of 41
PROGRAM/GM185L4-Modified in Excel CAPITAL IMPROVEMENT BUDGET REPORT ACCOUNTING
CENTRAL CONTRA COSTA SANITARY DISTRICT PERIOD ENDING: 3/31/2019 PERIOD 9/2019
A )nnC -B DE ) 7EXPENDITURES
(C+D+E) I (F-G)
PROJECT TOTAL TOTAL FY 2018-19 BUDGET ADJUSTEDPPROVED TOTAL TOTAL
PROJ BUDGETS EXPENDITURES PROJECT APPROVED ADJUSTMENTS BUDGET SPENT IN REMAINING BUDGET
NO PROJECT TITLE PYS(THRU FYE 17-18) PYS(THRU FYE 17-18) CARRY-FORWARD BUDGET FY 2018-19 FY 2018-19Y 2018-19 FY 2018-19 FY 2018-19
TYPE CS Collection System $ 29,409,417 30,841,697 (1,432,280) 19,347,000 600,000 19,947,000 18,514,720 13,639,812 4,874,925
TYPE TP Treatment Plant 32,746,274 26,758,622 5,987,652 16,865,000 1,231,177 18,096,177 24,083,829 9,746,254 14,337,582
TYPE GI General Improvements 9,024,737 7,225,141 1,799,596 4,750,000 (1,208,677) 3,541,323 5,340,919 1,421,137 3,919,780
TYPE RW Recycled Water 2,382,894 1,769,035 613,859 2,857,000 - 2,857,000 3,470,859 1,241,856 2,229,002
CIB Contingency - - - 1,500,000 (622,500) 877,500 877,500 - 877,500
TOTAL DISTRICT 73,563,322 $ 66,594,495 $ 6,968,827 $ 45,319,000 $ 45,319,000 $ 52,287,827 $ 26,049,059 $ 26,238,789
Argil 7'3 7()10 Donidnr MKIAAI('G ('nmmif+cc KAccfinn Anonrin DnnIrG+_ Dorm S2r.of 1G.C.
Page 19 of 41
PROGRAM/GM185L4-Modified in Excel CAPITAL IMPROVEMENT BUDGET REPORT ACCOUNTING
CENTRAL CONTRA COSTA SANITARY DISTRICT PERIOD ENDING: 3/31/2019 PERIOD 9/2019
A )nnn -B DE ) (C+D+E) I (F-G)
PROJECT TOTAL TOTAL FY 2018-19 BUDGET ADJUSTED APPROVED TOTAL TOTAL
PROJ BUDGETS EXPENDITURES PROJECT APPROVED ADJUSTMENTS BUDGET EXPENDITURES SPENT IN REMAINING BUDGET
NO PROJECT TITLE PYS(THRU FYE 17-18) PYS(THRU FYE 17-18) CARRY-FORWARD BUDGET FY 2018-19 FY 2018-19 FY 2018-19 FY 2018-19 FY 2018-19
TYPE CS Collection S stem
5991 PH Sewer Renovation Phase 2 460,000 277,761 182,239 - - 182,239 - 182,239
****6534 Harper Lane Area CAD - - - - 800,000 800,000 800,000 174,029 625,971
6602 South Jackson CAD 411,290 391,290 20,000 - - 20,000 - 20,000
6603 North Jackson CAD 400,000 - 400,000 - (123,443) (123,443) 276,557 31,372 245,185
****6679 Coredell Drive CAD - - - - 123,443 123,443 123,443 54,906 68,537
**7367 Concord Main Metering Station - - - - 250,000 250,000 250,000 12,729 237,271
8249 CSO Dump Pad Modifications 60,000 - 60,000 - - 60,000 6,853 53,147
*8412 PH Grayson Creek Trunk 15,100,000 15,061,359 38,641 - - 38,641 179,070 (140,429)
8419 Collection System Planning LT 885,000 884,387 613 100,000 100,000 100,613 79,588 21,025
*8430 Lafayette Sewer Renovation Phase 11 4,319,000 4,289,317 29,683 - - 29,683 13,399 16,284
8433 S.Orinda Sewer Renovation Phase 6 1,962,127 3,066,717 (1,104,590) 2,758,873 2,758,873 1,654,283 1,539,090 115,193
8435 WC Sewer Renovation Phase 12 1,450,000 2,891,122 (1,441,122) 3,100,000 3,100,000 1,658,878 1,645,835 13,043
8436 Moraga/Crossroads PS Project 1,300,000 1,138,016 161,984 2,697,000 (250,000) 2,447,000 2,608,984 1,293,219 1,315,765
8441 CIPP Contract 17-20 300,000 80,247 219,753 100,000 100,000 319,753 171,503 148,250
8442 PS Equipment Piping Replacement PH2 36,000 - 36,000 25,000 25,000 61,000 - 61,000
8443 LG Diameter Pipe line Inspection 200,000 5,793 194,207 50,000 50,000 244,207 10,696 233,511
8444 Force Main Inspection Program 75,000 - 75,000 50,000 50,000 125,000 - 125,000
8445 N.Orinda Sewer Renovation 636,000 768,680 (132,680) 3,731,000 3,731,000 3,598,320 3,481,161 117,159
8446 Lafayette Sewer Renovation Phase 12 636,000 1,216,107 (580,107) 3,397,600 3,397,600 2,817,493 2,493,626 323,867
8447 Pump Station Security Improvement 131,000 - 131,000 25,000 25,000 156,000 - 156,000
8448 Manhole Modifications 400,000 375,370 24,630 300,000 300,000 324,630 131,170 193,460
8449 Collection System Modeling Support 100,000 56,761 43,239 100,000 100,000 143,239 44,180 99,059
8450 Development Sewerage Support 400,000 240,770 159,230 250,000 250,000 409,230 724,266 (315,036)
8451 C.S.Sewer Renovation 50,000 - 50,000 2,612,527 (2,200,000) 412,527 462,527 - 462,527
***8452 Lafayette Sewer Ren. Ph. 13 - - - - 500,000 500,000 500,000 325,217 174,783
*8453 Willows Sewer Repair 98,000 98,000 - - - - - -
***8454 So.Orinda Sewer Ren. Ph.7 - - - - 500,000 500,000 500,000 503,486 (3,486)
***8455 W.C.Sewer Renov. Ph. 13 - - - - 500,000 500,000 500,000 512,626 (12,626)
***8456 Danville Sewer Ren. Ph.3 - - - - 500,000 500,000 500,000 211,791 288,209
8457 Pump Station Upgrades-Ph.2 - - - 50,000 50,000 50,000 - 50,000
Rounding 17
Total FY 2018-19 CS Amount $ 29,409,417 30,841,697 (1,432,280) 19,347,000 600,000 19,947,000 18,514,720 13,639,812 4,874,925
*Italic Projects open but not in CIB for 18/19
*** Not in 18/19 Budget. New projects opened in August 2018. Funds transferred from DP8451
Anril ')4 onto Rona In IZIKIA[\I('D r'-iff- nano+inn A,-In Dn,Lnf- Dnn AP of 9r,9
Page 20 of 41
PROGRAM/GM185L4-Modified in Excel CAPITAL IMPROVEMENT BUDGET REPORT ACCOUNTING
CENTRAL CONTRA COSTA SANITARY DISTRICT PERIOD ENDING: 3/31/2019 PERIOD 9/2019
A )nnn -B DE ) 7EXPENDITURES
(C+D+E) I (F-G)
PROJECT TOTAL TOTAL FY 2018-19 BUDGET ADJUSTEDPPROVED TOTAL TOTAL
PROJ BUDGETS EXPENDITURES PROJECT APPROVED ADJUSTMENTS BUDGET SPENT IN REMAINING BUDGET
NO PROJECT TITLE PYS(THRU FYE 17-18) PYS(THRU FYE 17-18) CARRY-FORWARD BUDGET FY 2018-19 FY 2018-19Y 2018-19 FY 2018-19 FY 2018-19
**** Not in 18/19 Budget. New projects opened in October 2018. Funds transferred from DP7353,7315,8451&6603 for CAD
** Not in 18/19 Budget. New projects opened in December 2018. Funds transferred from DP8436
TYPE TP Treatment Plant
7291 Pump&Blower Bldg.Seismic Upgrade 6,692,000 6,638,700 53,300 - - - 53,300 10,393 42,907
7292 Switchgear Refurbishment-Ph.2 770,000 433,911 336,089 200,000 - 200,000 536,089 32,688 503,401
7304 Instr&Controls PLC Upgrade 575,000 397,606 177,394 110,000 - 110,000 287,394 70,065 217,329
7315 Applied Research and Innovations 557,274 251,302 305,972 300,000 (300,000) - 305,972 39,032 266,940
7317 Plant Control System Network Upgrades 330,000 234,234 95,766 100,000 - 100,000 195,766 9,250 186,516
7320 Plant Energy Optimization 1,094,000 1,063,448 30,552 - - - 30,552 (58,880) 89,432
7322 Fire Protection System Ph.2 1,406,000 1,014,803 391,197 - - - 391,197 310,003 81,194
7326 Equipment Replacement FY 15-FY 24 1,166,000 748,217 417,783 250,000 - 250,000 667,783 778,008 (110,225)
7327 Headwork's Screening Upgrade 8,144,000 7,845,455 298,545 76,000 - 76,000 374,545 155,295 219,250
7328 Influent Pump Electrical improvements 100,000 757 99,243 510,000 - 510,000 609,243 176,512 432,731
7329 MHF Burner Upgrade 220,000 156,933 63,067 - - - 63,067 - 63,067
7330 Piping Renovation Phase 9 2,566,000 513,944 2,052,056 614,000 - 614,000 2,666,056 2,356,159 309,897
7339 T. Plant Control System 1/0 Replacement 470,000 605,231 (135,231) 900,000 - 900,000 764,769 92,644 672,125
7341 WC/Grayson Creek Levee Rehab 100,000 - 100,000 - - - 100,000 36,876 63,124
7348 Solids Handling Facility Improvements 4,975,000 4,516,007 458,993 5,715,000 - 5,715,000 6,173,993 2,344,896 3,829,097
7349 Aeration& Energy Upgrade 300,000 35,539 264,461 1,200,000 - 1,200,000 1,464,461 178,952 1,285,509
7351 Mechanical&Concrete Renovation 1,300,000 1,254,155 45,845 3,000,000 - 3,000,000 3,045,845 912,374 2,133,471
7352 UV Disinfection Upgrades - - - 500,000 - 500,000 500,000 134,507 365,493
7353 Outfall Improvements Ph.7 - - - 400,000 (300,000) 100,000 100,000 15,496 84,504
7354 TP Security Improvements 87,000 2,995 84,005 50,000 - 50,000 134,005 22,058 111,947
7355 Odor Control Upgrade Ph. 1 44,000 - 44,000 200,000 - 200,000 244,000 - 244,000
7357 Plant Wide Instrumentation Upgrade 100,000 27,288 72,712 190,000 - 190,000 262,712 50,570 212,142
7358 Innovation Bioenergy Demo 300,000 261,182 38,818 - - - 38,818 1,585 37,233
7359 Solids Conditioning Bldg. roof replacement 500,000 189,377 310,623 800,000 - 800,000 1,110,623 893,309 217,314
7360 Existing Plant Facility Drawing 100,000 83,040 16,960 100,000 - 100,000 116,960 41,684 75,276
7362 POB Seismic Upgrades 400,000 135,591 264,409 1,100,000 1,831,177 2,931,177 3,195,586 868,373 2,327,213
7363 Treatment Plant Planning 450,000 348,907 101,093 450,000 - 450,000 551,093 274,405 276,688
7364 TP Safety Enhancement Ph.5 - - - 100,000 - 100,000 100,000 - 100,000
Rounding 7
Total FY 2017-18 TP Amount $ 32,746,274 26,758,622 5,987,652 16,865,000 1,231,177 18,096,17 24,083,829 9,746,254 14,337,582
*Italic Projects open but not in CIB for 18/19
AnriI ')'2 7/11Q D�n11Inr GIAIAAI('1= (-i#.- 1%A o+inn An nr4n DonL f- Dono 527 of 9 FC.
Page 21 of 41
PROGRAM/GM185L4-Modified in Excel CAPITAL IMPROVEMENT BUDGET REPORT ACCOUNTING
CENTRAL CONTRA COSTA SANITARY DISTRICT PERIOD ENDING: 3/31/2019 PERIOD 9/2019
A )nnn -B DE ) (C+D+E) I (F-G)
PROJECT TOTAL TOTAL FY 2018-19 BUDGET ADJUSTED APPROVED TOTAL TOTAL
PROJ BUDGETS EXPENDITURES PROJECT APPROVED ADJUSTMENTS BUDGET EXPENDITURES SPENT IN REMAINING BUDGET
NO PROJECT TITLE PYS(THRU FYE 17-18) PYS(THRU FYE 17-18) CARRY-FORWARD BUDGET FY 2018-19 FY 2018-19 FY 2018-19 FY 2018-19 FY 2018-19
TYPE GI General Improvements
8207 General Security and Access $ 194,616 121,661 72,955 500,000 (559,641) (59,641) 13,314 13,313 1
8230 Capital Legal Services 158,665 132,070 26,595 20,000 - 20,000 46,595 10,191 36,404
8236 District Easements 208,047 164,616 43,431 50,000 - 50,000 93,431 49,497 43,934
8238 Asset Management 2,969,185 2,790,236 178,949 400,000 - 400,000 578,949 483,372 95,577
8240 IT Development 2,188,794 2,187,431 1,363 1,750,000 (450,000) 1,300,000 1,301,363 212,141 1,089,222
8243 Server Room Relocation 955,430 515,656 439,774 880,000 164,570 1,044,570 1,484,344 327,987 1,156,357
8247 Property&Building Improvements 400,000 178,767 221,233 300,000 (363,606) (63,606) 157,627 169,608 (11,981)
8248 Cyber Security 75,000 - 75,000 - - - 75,000 - 75,000
8516 District Equipment Acquisition 676,000 590,745 85,255 200,000 - 200,000 285,255 14,830 270,425
8517 Vehicle Replacement Program 1,199,000 603,959 595,041 650,000 - 650,000 1,245,041 140,200 1,104,841
9999 Capital Project Clearing(Accounting Use Only)** - (60,000) 60,000 - - - 60,000 (2) 60,002
Rounding (2)
Total FY 2017-18 GI Amount 9,024,737 7,225,141 1,799,596 (1,208,677) 3,541,323 5,340,919 1,421,137 3,919,780
Ancil ` '4 onia P,I^JY GIKIA[\I(`D ('nmmiffoo r%Roofinn An nr4n D-Lof- Do 5252 of IrP
Page 22 of 41
PROGRAM/GM185L4-Modified in Excel CAPITAL IMPROVEMENT BUDGET REPORT ACCOUNTING
CENTRAL CONTRA COSTA SANITARY DISTRICT PERIOD ENDING: 3/31/2019 PERIOD 9/2019
A )nnn -B DE ) (C+D+E) I (F-G)
PROJECT TOTAL TOTAL FY 2018-19 BUDGET ADJUSTED APPROVED TOTAL TOTAL
PROJ BUDGETS EXPENDITURES PROJECT APPROVED ADJUSTMENTS BUDGET EXPENDITURES SPENT IN REMAINING BUDGET
NO PROJECT TITLE PYS(THRU FYE 17-18) PYS(THRU FYE 17-18) CARRY-FORWARD BUDGET FY 2018-19 FY 2018-19 FY 2018-19 FY 2018-19 FY 2018-19
TYPE RW Recycled W
7306 Zone 1 Recycled Water 497,894 484,984 12,910 35,000 - 35,000 47,910 14,358 33,552
7346 Surge Analysis 16-17 155,000 3,125 151,875 50,000 - 50,000 201,875 109,516 92,359
7361 Filter Plant Improvments 330,000 162,293 167,707 2,457,000 - 2,457,000 2,624,707 892,327 1,732,380
7365 Recycle Water Clearwell Repairs 1,400,000 1,118,633 281,367 300,000 - 300,000 581,367 225,655 355,712
7366 ReW Distribution System Renov. Program - - - 15,000 - 15,000 15,000 - 15,000
Rounding (1)
Total FY 2016-17 RW Amount $ 2,382,894 1,769,035 613,859 2,857,000 - 2,857,000 3,470,859 1,241,856 2,229,002
9990 CONTINGENCY-ALL PROGRAMS - - - 1,500,000 (622,500) 877,500 877,500 877,500
GRAND TOTAL $ 73,563,322 66,594,495 6,968,827 45,319,000 - 45,319,000 52,287,827 26,049,059 26,238,789
Anril 0a 7()10 Dnr iI- GINIAN I(`I= ('-iff- rkA o+inn An nr!o D-Lo+_ Dnn 520 of 11:,9
Page 23 of 41
FY 18-19 CAPITAL BUDGET TRANSFERS
PERIOD ENDING:3/31/19
Position Paper Position Paper
Memo to GM Position Paper Position Paper
approved 10/4/19 item 2 11/15 Item 10 11/1 item 7 & 12/20 item 7
09/05/18 & Deputy GM &GM 12/12 GM 12/19 &GM 18/19 Contingency
signature 1/08/19
PROD.# PROJECTS TOTAL Balance
*8451 C.S.Sewer Renovation (2,000,000) (200,000) - - - (2,200,000)
*8452 Lafayette Sewer Ren. Ph. 13 500,000 - 500,000
*8454 So. Orinda Sewer Ren. Ph. 7 500,000 - 500,000
*8455 W.C.Sewer Renov. Ph. 13 500,000 - - - 500,000
*8456 Danville Sewer Renov. Ph. 3 500,000 - - - - 500,000
6534 Harper Lane Area CAD(new Project) - 800,000 - - - 800,000
7353 Outfall Improvements (300,000) - - - (300,000)
7315 Applied Research (300,000) - - - (300,000)
7367 Concord Main Metering Station - 250,000 - - 250,000
8436 Moraga Crossroads Pump Station - (250,000) - - (250,000)
8243 Server Room Relocation Proj. - - 164,570 - 164,570
7362 POB Seismic Upgrades - - 1,831,177 - 1,831,177
8240 IT Technology Development - - (450,000) (450,000)
8247 Property& Building Improvements - - - (363,606) (363,606)
8207 General Security&Access - - - (559,641) - (559,641)
6679 Cordell Drive CAD - - - - 123,443 123,443
6603 North Jackson CAD - - - - (123,443) (123,443)
9990 Capital Projects-Contingency - - - (622,500) - (622,500) 877,500
0
* Not actual transfers. All part of one project split into individual projects for construction
April 23, 2019 Regular FINANCE Committee Meeting Agenda Packet- Page 90 of 156
Page 24 of 41
O&M PROJECTS- EXPENDITURE LIST ACCOUNTING
PERIOD ENDING: 03/31/19 01/06/00
OM043 - Naval Weapons Station
Prior years Project expended
Expenditure type through 17-18 Jul. '18 Aug. '18 Sept. '18 Oct. '18 Nov. '18 Dec. '18 Jan. '19 Feb. '19 Mar. '19 Apr. '19 May'19 Jun. '19 2018-19 YTD to date
Salary& Benefits $ 17,293 $ - $ - $ - $ - $ - $ - $ - $ - $ 136 $ - $ - $ - $ 136 $ 17,429
Technical Services $ 75,169 - - - - - - - - - - - - - $ 75,169
Total $ 92,462 1 $ - $ - $ - $ - $ - $ - $ - $ - $ 136 $ - $ - $ - $ 136 $ 92,598
Page 25 of 42
OM080 - CoCo Farm (Kiewit Future Farm Proposal)
Prior years Project expended
Expenditure type through 17-18 Jul. '18 Aug. '18 Sept. '18 Oct. '18 Nov. '18 Dec. '18 Jan. '19 Feb. '19 Mar. '19 Apr. '19 May'19 Jun. '19 2018-19 YTD to date
Salary& Benefits $ 206,827 $ 1,444 $ 225 $ - $ 403 $ 241 $ - $ - $ - $ 851 $ - $ - $ - $ 3,165 $ 209,992
Other Charges $ 74,996 - - - - 561 - - - - - - - - $ 74,996
Total $ 281,824 $ 1,444 $ 225 $ - $ 403 $ 802 $ - $ - $ - $ 851 $ - $ - $ - $ 3,165 $ 284,988
OM083 - Refinery Recycled Water Exchange
Prior years Project expended
Expenditure type through 17-18 Jul. '18 Aug. '18 Sept. '18 Oct. '18 Nov. '18 Dec. '18 Jan. '19 Feb. '19 Mar. '19 Apr. '19 May '19 Jun. '19 2018-19 YTD to date
Salary& Benefits $ 23,648 $ 2,746 $ 1,540 $ 2,411 $ 2,324 $ 1,549 $ 4,069 $ 3,391 $ 6,368 $ 10,037 $ - $ - $ - $ 34,436 $ 58,084
other Charges $ - - - - - - - - - - $ - $ -
Total $ 23,648 1 $ 2,746 $ 1,540 $ 2,411 $ 2,324 $ 1,549 $ 4,069 $ 3,391 $ 6,368 $ 10,037 $ - $ - $ - $ 34,4361 $ 58,084
n-._:i nn nnnn ri__..i_._ rIKI nninn_ n-- M--I,_a ri_-_ - _t A-
Page 25 of 41
CENTRAL CONTRA COSTA SANITARY DISTRICT
SEWER CONSTRUCTION FUND
TEMPORARY INVESTMENTS
MARCH,2019
INVESTMENTS
(cents omitted) INTEREST INCOME
DATE OF Days to ANNUAL CASH B.O.M. PURCHASE E.O.M. E.O.M. %of CURRENT B.O.M. E.O.M.
NO. ISSUER TYPE PURCHASE MATURITY Maturity YIELD OUTLAY FACE VALUE (MATURITY) FACE VALUE MKT VALUE Portfolio MONTH CUMULATIVE CUMULATIVE
519 State of Calif. LAIF 8/86-2/90 ---- 1 (1) $11,500,000 $13,500,000 ($2,000,000) $11,500,000 $11,559,820 23.23% $26,305.21 $153,355.94 $179,661.15
933 US Gov't Agency Dscnt 06/08/18 05/28/19 59 2.32 4,956,560 5,000,000 5,000,000 4,991,600 10.10% 3,804 29,692 33,496
936 Toyota Motor CP 09/06/18 03/04/19 0 2.43 3,952,267 4,000,000 (4,000,000) 0 0 0.00% 800 46,933 47,733
937 FHLB Fed Agency 09/06/18 03/06/19 0 2.30 4,943,689 5,000,000 (5,000,000) 0 0 0.00% 1,556 54,756 56,311
938 FHLMC FHLMC 12/06/18 6/03/19 63 2.57 4,937,847 5,000,000 5,000,000 4,978,850 10.10% 10,764 29,514 40,278
938A FHLB Fed Agency 12/21/18 3/20/19 0 2.45 4,970,333 5,000,000 (5,000,000) 0 0 0.00% 6,333 23,333 29,667
939 FHLB Fed Agency 12/21/18 04/02/19 1 2.48 4,965,646 5,000,000 5,000,000 4,999,650 10.10% 10,441 23,576 34,017
940 US Gov't T-Bill 12/21/18 06/20/19 80 2.52 4,938,284 5,000,000 5,000,000 4,973,750 10.10% 10,570 23,868 34,438
941 US Gov't T-Bill 2/28/19 8/29/19 150 2.49 3,950,860 4,000,000 4,000,000 3,960,720 8.08% 8,370 270 8,640
942 US Gov't T-Bill 3/4/19 8/29/19 150 2.50 3,951,742 4,000,000 4,000,000 3,960,720 8.08% 7,591 0 7,591
943 FHLMC Fed Agency 3/06/19 6/12/19 72 2.46 4,967,197 5,000,000 5,000,000 4,975,800 10.10% 8,703 0 8,703
944 T-Bill US Tbill 3/21/19 9/19/19 171 2.50 4,938,575 5,000,000 5,000,000 4,943,700 10.10% 3,713 0 3,713
0 0
(4) $62,973,000 $51,500,000 ($2,000,000) $49,500,000 $49,344,610 100.00% 98,950 385,299 484,248
(3) (5)
5,729 199,669 205,398
$104,679 $584,968 $689,646
NOTE: (1) Annual Yield of Local Agency Investment Fund(LAIF)varies with the composition of the Fund.
The estimated yield as of March 2019 was 2.440%.
(2) The face value indicates the value of the investment if held until maturity, which is the usual District practice.
(3) The weighted average yield of the total Sewer Construction portfolio is 2.4654%.
(4) The market value of the portfolio on March 31,2019 was$49,344,610.
GASB 31 requires adjusting investments to market value. The District will adjust annually,but report market values monthly.
(5) The District has sufficient funds available combined with secured SSC and Property Tax received in December and April to cover
six months of cash flow needs.
COMPLIANCE STATEMENT: All investments comply with the District's internal investment policy approved by the Board of Directors.
April 23, 2019 Regular FINANCE Committee Meeting Agenda Packet- Page 92 of 156
Page 26 of 41
' Central Contra Costa sanitary District
Protecting public health and the environment
Balance Sheet
Fund:002-SEWER CONSTRUCTION(Capital)
March 2019 Fiscal Period 9/2019
Summarized by Account
Report Generated on Apr 10,2019 9:21:32 AM
TOTAL ASSETS
Current Assets
CAD RECEIVABLE/AVAD-ALHAMBRA VLY AR $820,003
CASH ACCOUNTS/CASH $1,407,511
CASH ACCOUNTS/TEMPORARY INVESTMENTS $49,500,000
DUE FROM/DUE FROM DEBT FUND $3,685,382
DUE FROM/DUE FROM RIE $23,610,448
RECEIVABLE ACCOUNTS/ACCOUNTS RECEIVABLE $68,601
RECEIVABLE ACCOUNTS/ACCRUED INTEREST A/R $102,584
RECEIVABLE ACCOUNTS/CAD RECEIVABLE $162,781
Current Assets $79,357,310
Net Property,Plant and Equipment
FIXED ASSETS-C.I.P./CONSTRUCTION IN PROGRESS $26,049,058
Net Property,Plant and Equipment $26,049,058
TOTAL ASSETS $105,406,368
TOTAL LIABILITIES AND FUND EQUITY
Total Liabilities
ACCOUNTS PAYABLE/SALES TAX PAYABLE $0
CURRENT LIABILITIES/ACCOUNTS PAYABLE ($73,585)
CURRENT LIABILITIES/PROJECT RETENTION PAYABLE ($1,432,249)
CURRENT LIABILITIES/REFUNDABLE CONST BONDS ($290,149)
DUE TO/DUE TO DEBT FUND ($67,318)
DUE TO/DUE TO RIE ($33,128,906)
LIABILITIES/UNEARNED INTEREST ($219,463)
Total Liabilities ($35,211,670)
Total Fund Equity
EXPENDITURE SUMMARY/TRANSFER TO CIP ($26,049,058)
FUND EQUITY/AVAILABLE FUND BALANCE ($41,006,302)
FUND EQUITY/EXPENDITURE SUMMARY $26,049,058
YEAR TO DATE REVENUES/REVENUE SUMMARY ($29,188,396)
Total Fund Equity ($70,194,697)
TOTAL LIABILITIES AND FUND EQUITY ($105,406,368)
Page 27 of 41
AwLcentral Contra Costa Sanitary District
Protecting public health and the environment
Revenue Report MTD
Fund: 003-SELF-INSURANCE
March 2019 Fiscal Period 9/2019
Report Generated on Apr 10, 2019 9:25:27 AM
Category MTD Estimate MTD Actual MTD%Rev YTD Estimate YTD Actual YTD%Rev Annual Estimate Unrealized Balance Annual%Rev
Other $9,645 $14,921 54.7% $866,305 $907,319 4.7% $960,250 552,931 94.5%
Total Revenue $866,305 $907,319
Page 28 of 41
ACV ts entral Contra Costa Sanitary District
Protecting public health and the environment
Expense Report - By Department MTD
Fund: 003-SELF-INSURANCE
March 2019 Fiscal Period 09/2019
Report Generated on Apr 10, 2019 9:29:02 AM
$30,000 ❑Period Budget $1,000,000 ❑ YTD Budget
❑Period Actual ❑ YTD Actual
$25,000
$800,000-
$20,000-
$600,000-
$15,000-,//
800,000$20,000 $600,000$15,000 '
$400,000-
$10,000-1/
400,000$10,000 '
$200,000-
$5,000-//
$0 $0
Period Budget Period Actual Period Variance YTD Budget YTD Actual YTD Variance
$29,540 $14,122 $15,418 $835,860 $736,305 $99,555
Totals $29,540 $14,122 $15,418 $835,860 $736,305 $99,555
Page 29 of 41
j&V ts entral Contra Costa Sanitary District
Protecting public health and the environment
Expense Report - By Department MTD
Fund: 003-SELF-INSURANCE
March 2019 Fiscal Period 09/2019
Report Generated on Apr 10, 2019 9:29:02 AM
Department:
Category Period Budget Period Actual Period Variance % YTD Budget YTD Actual YTD Variance % Annual %
Budget
INSURANCE&OTHER EXP $791 $956 ($165) -20.8% $577,119 $604,038 ($26,919) -4.7% $579,500 104.2%
GENERAL&AUTO LIABILITY $28,749 $13,166 $15,583 54.2% $258,741 $132,267 $126,474 48.9% $345,000 38.3%
EMP RELATED&POLLUTION $0 $0 $0 0.0% $0 $0 $0 0.0% $0 0.0%
Total Expenses $29,540 $14,122 $15,418 52.2% $835,860 $736,305 $99,555 11.9% $924,500 79.6%
Color Key: 0 to 10%over budget > 10%over budget M
Page 30 of 41
CENTRAL CONTRA COSTA SANITARY DISTRICT
SELF-INSURANCE FUND
TEMPORARY INVESTMENTS
MARCH,2019
INVESTMENTS
(cents omitted) INTEREST INCOME
DATE OF
Days to ANNUAL CASH B.O.M. PURCHASE E.O.M. E.O.M %of CURRENT B.O.M. E.O.M.
NO. ISSUER TYPE PURCHASE MATURITY Maturity YIELD OUTLAY FACE VALUE (MATURITY) FACE VALUE MKT VALUE Portfolio MONTH CUMULATIVE CUMULATIVE
519 State of Calif. LAW 10/99- ------- 1 (1) $7,200,000 $7,200,000 $0 $7,200,000 $7,237,452 100.00% $14,921 $101,979 $116,899
(3) $7,200,000 $7,200,000 $0 $7,200,000 $7,237,452 100.00% 14,921 101,979 116,899
(2)
5,943 5,943
$14,921 $107,921 $122,842
NOTE: (1) Annual yield of Local Agency Investment Fund(LAIF)varies with the composition of the Fund.
The estimated yield as of March,2019 was 2.440%.
(2) The face value indicates the value of the investment if held until maturity,which is the usual District Practice.
(3) The weighted average yield of the total Self-Insurance portfolio is 2.440%.
(4) The market value of the portfolio on March 31,2019 was$7,237,452.
COMPLIANCE STATEMENT:
All investments comply with the District's internal investment policy approved by the Board of Directors.
April 23, 2019 Regular FINANCE Committee Meeting Agenda Packet- Page 97 of 156
Page 31 of 41
' Central Contra Costa sanitary District
Protecting public health and the environment
Balance Sheet
Fund:003-SELF-INSURANCE
March 2019 Fiscal Period 9/2019
Summarized by Account
Report Generated on Apr 10,2019 9:21:32 AM
TOTAL ASSETS
Current Assets
CASH ACCOUNTS/CASH $99,215
CASH ACCOUNTS/TEMPORARY INVESTMENTS $7,200,000
DUE FROM/DUE FROM R/E $783,408
RECEIVABLE ACCOUNTS/ACCRUED INTEREST A/R $42,553
Current Assets $8,125,176
TOTAL ASSETS $8,125,176
TOTAL LIABILITIES AND FUND EQUITY
Total Liabilities
CURRENT LIABILITIES/ACCOUNTS PAYABLE ($3,784)
CURRENT LIABILITIES/GASB10 ACTUARIAL RESERVE ($882,230)
DUE TO/DUE TO R/E ($788,100)
Total Liabilities ($1,674,114)
Total Fund Equity
FUND EQUITY/EMPLOYMENT/POLLUTION RISK ($5,000,000)
FUND EQUITY/EXPENDITURE SUMMARY $736,305
FUND EQUITY/INS PREMS/CLAIMS/LAWSUITS ($1,280,047)
YEAR TO DATE REVENUES/REVENUE SUMMARY ($907,319)
Total Fund Equity ($6,451,062)
TOTAL LIABILITIES AND FUND EQUITY ($8,125,176)
Page 32 of 41
AwLcentral Contra Costa Sanitary District
Protecting public health and the environment
Revenue Report MTD
Fund: 004-DEBT SERVICE
March 2019 Fiscal Period 9/2019
Report Generated on Apr 10, 2019 9:25:27 AM
Category MTD Estimate MTD Actual MTD%Rev YTD Estimate YTD Actual YTD%Rev Annual Estimate Unrealized Balance Annual%Rev
Other $0 $0 0.0°% $3,528,591 $3,531,028 0.1% $3,611,037 580,009 97.8%
Total Revenue 0.0% $3,528,591 $3,531,028 0.1% $3,611,037
Page 33 of 41
ACV ts entral Contra Costa Sanitary District
Protecting public health and the environment
Expense Report - By Department MTD
Fund: 004- DEBT SERVICE
March 2019 Fiscal Period 09/2019
Report Generated on Apr 10, 2019 9:29:02 AM
$5,000 ❑Period Budget $1,000,000 ❑ YTD Budget
❑Period Actual ❑ YTD Actual
$4,000 $800,000-
$3,000- $600,000-
$2,000- $400,000-
$1,000- $200,000-
$0- $0
Period Budget Period Actual Period Variance YTD Budget YTD Actual YTD Variance
$4,742 $0 $4,742 $764,278 $868,491 ($104,213)
Totals $4,742 $0 $4,742 $764,278 $868,491 ($104,213)
Page 34 of 41
ZwLcentral Contra Costa Sanitary District
Protecting public health and the environment
Expense Report - By Department MTD
Fund: 004-DEBT SERVICE
March 2019 Fiscal Period 09/2019
Report Generated on Apr 10, 2019 9:29:02 AM
Department:
Category Period Budget Period Actual Period Variance % YTD Budget YTID Actual YTD Variance % Annual %
Budget
INTEREST EXPENSE $4,742 $0 $4,742 100.0% $764,278 $868,491 ($104,213) $1,135,780 76.5%
Total Expenses $4,742 $0 $4,742 100.0% $764,278 $868,491 ($104,213) -13.6% $1,135,780 76.5%
Total Expenses $8,490,235 $8,190,278 $299,957 3.5% $68,538,773 $66,191,978 $2,346,795 3.4% $91,780,736 72.1%
Color Key: 0 to 10%over budget > 10%over budget M
Page 35 of 41
' Central Contra Costa Sanitary District
Protecting public health and the environment
Balance Sheet
Fund:004-DEBT SERVICE
March 2019 Fiscal Period 9/2019
Summarized by Account
Report Generated on Apr 10,2019 9:21:32 AM
TOTAL ASSETS
Current Assets
DUE FROM/DUE FROM RIE $3,528,591
DUE FROM/DUE FROM S/C $67,318
L.T.DEBT ACCOUNTING/DEPOSIT W/TRUSTEE-RESERVE $0
RECEIVABLE ACCOUNTS/ACCRUED INTEREST A/R $99,384
Current Assets $3,695,292
TOTAL ASSETS $3,695,292
TOTAL LIABILITIES AND FUND EQUITY
Total Liabilities
DUE TO/DUE TO S/C ($3,685,382)
L.T.DEBT ACCOUNTING/BOND ACR INTEREST PAYABLE $0
L.T.DEBT ACCOUNTING/BONDS PAYABLE ($19,450,000)
Total Liabilities ($23,135,382)
Total Fund Equity
FUND EQUITY/AVAILABLE FUND BALANCE $24,673,496
FUND EQUITY/EXPENDITURE SUMMARY $868,491
LIABILITIES/DEFERRAL-BOND REFUNDING ($2,570,870)
YEAR TO DATE REVENUES/REVENUE SUMMARY ($3,531,028)
Total Fund Equity $19,440,090
TOTAL LIABILITIES AND FUND EQUITY ($3,695,292)
Page 36 of 41
DASHBOARD DATA
(SELECTED DATA ON MATTERS
OF CONTINUING BOARD INTEREST)
April 23, 2019 Regular FINANCE Committee Meeting Agenda Packet- Page 103 of 156
Page 37 of 41
PENSION AND OPEB
LIABILITY AND FUNDING STATUS
Pension OPEB
$160 100% $90 100%
$140 90% $80 90%
$120 80% $70 80%
70% $60 70%
$100 60% $50 60%
$80 50% 50%
$60 40% $40 40%
30% $30 30%
$40
20% $20 20%
$20 10% $10 10%
$0 0% $0 0%
2012 2013 2014 2015 2016 2017 2018 2019 2012 2013 2014 2015 2016 2017 2018 2019
�UAAL —Funded% �UAAL —Funded%
Notes:
* Pension: 2018 valuation is released summer of 2019.
** OPEB-Valuations projected liabilities less assets as of June 30 of that year
*** Pension funded percentage excludes Section 115 Trust Assets (established in FY 2017-18).
April 23, 2019 Regular FINANCE Committee Meeting Agenda Packet- Page 104 of 156
Page 38 of 41
CIB TRANSFERS SINCE FY 2016=17
Cause for Transfers
Past Three Years Total Original Project Budgets and Transfers
#of (FY2016-17 to FY2018-19 to 3/31)
transfers Past Three Years
s
�N016-17 to FY2018-19 to 3 f 31�
$30r0oof000
5
$251000,000
3 $20rOW rW0
2 $15,000,000
1
$10,Oo0rao0 F.Cost exceeded initial budget
o AW E.New project scope
D.NewProject
OOOr000 C.Developer/CAU or other cost neutral
■ c ■ o ■ � ■ v ■ a ■v
= o m o 0
3 o 0.Cashflow accelerations
A.Bundling
Notes:
*There were no additional project transfers from the initial transfer report presented at the January 15, 2019 Board workshop
through March 31, 2019
April 23, 2019 Regular FINANCE Committee Meeting Agenda Packet- Page 105 of 156
Page 39 of 41
CIB TRANSFERS-CU RRENT YEAR
Cause for Transfers Total Original Project Budgets and Transfers
Current Year Only-FY2018-19 to 3/31 Current Year Only-FY2018-19 to 3/31
#of transfers
8
7
6 53100c,acc
5 $2500,aCC
52,aa0,aaa
3
2 $15001000
1 �iXo,aaa F.Cost exceeded initial hud.;et
o AW E.New project scope
h
D.New Project
• _ X30 • � • � 300000 AW
v v C.developer/CAD or Other cost neutral
m m7
CL o z a h B.Ctl5il�illW JLL�ief ilJ[Jfl
LL a A Bundling
� o
Notes:
*There were no additional project transfers from the initial transfer report presented at the January 15, 2019 Board workshop
through March 31, 2019
April 23, 2019 Regular FINANCE Committee Meeting Agenda Packet- Page 106 of 156
Page 40 of 41
FY 2018-19 Running Expense Fund Total Cash & Investment Balances
(Actuals through March 2019)
$52.5
$50.0 $46.7
$43.7 $44.3
$40.3 $42.5 , $ao.2 $40.9
$40.0 _
$37.1
$33.9 $37.3
$31.5 $31.9
$30.0 $29.6
$25.6 $26 7
$za.z
$21.9 $20.6
$20.5 $19.4
$20.0
$15.3 $13.5
$10.0
$0.0
e
`p `a Je�`a
�o
MProjected Balance* MActual Balance Reserve Target at Year End**
NOTES: * Projected balances were generated in June 2018 based on budgeted revenues and expenses for FY 2018-19 and applied to the actual balance at June 30,2018
**The Reserve Target at Year End is the minimum balance required at June 30,2019 to comply with the District Fiscal Reserve Policy
April 23, 2019 Regular FINANCE Committee Meeting Agenda Packet- Page 107 of 156
Page 41 of 41
FY 2018-19 Sewer Construction Fund Total Cash & Investment Balances
(Actuals through March 2019)
$60.0 $59.1
$54.0 $53.6 $54.9
$53.0 $51.3 $51.8 $50.9
$49.8
$50.0 $47.9
$44.1
$40.4
$40.0 $37.3 $36.4 $37.9 $34.3
$35.7
$31.6 $33.0 $32.4 $31.1
$30.0 $29.1$22.7 $30.0
$30.4
$20.0
$10.0
$0.0
MProjected Balance* MActual Balance Reserve Target at Year End**
NOTES: * Projected balances were generated in June 2018 based on budgeted revenues and expenses for FY 2018-19 and applied to the actual balance at June 30,2018
**The Reserve Target at Year End is the minimum balance required at June 30,2019 to comply with the District Fiscal Reserve Policy