Loading...
HomeMy WebLinkAbout09.c. Receive summary of 2018 energy usage Page 1 of 7 Item 9.c. ,ek CENTRAL SAN SANITARYCENTRAL CONTRA COSTA , . February 21, 2019 TO: HONORABLE BOARD OF DIRECTORS FROM: CLINT SHIMA, SENIOR ENGINEER REVIEWED BY: NEIL MEYER, PLANT MAINTENANCE DIVISION MANAGER ANN SASAKI, DEPUTY GENERAL MANAGER ROGER S. BAILEY, GENERAL MANAGER SUBJECT: RECEIVE SUMMARY OF 2018 ENERGY USAGE Senior Engineer Clint Shima will present a summary of Central San's 2018 energy usage. The presentation will include the following: • Treatment Plant Usage - 2017 versus 2018 • MCE Impact • Monthly Usage Statistics • General Energy Information • Solar Panels Strategic Plan Tie-In GOAL SIX: Embrace Technology, Innovation and Environmental Sustainability Strategy 2- Reduce reliance on non-renewable energy, Strategy 3- Encourage the review and testing of technology to optimize and modernize business operations ATTACHMENTS: 1. December 2018 Energy Usage 2. Presentation February 21, 2019 Regular Board Meeting Agenda Packet- Page 74 of 111 CCCSD December 2018 Energy Usage HHWCF(Solar) Treatment Plant Monthly Total Energy Cost: $318,488 HHWCF(Gas and $250 87%of Total$ POD Demand Electricity)$142 0% 0% POD Reserv.&Serv.Charge(VICE) $- $284 /MG Treated Charges(PG&E) 0% Misc(Gas and $22,373 8% POD Electricity 1 723 kWh/MG Treated Electricity) $2,429 Import(NICE)1% $15,165 6% CSO Facility CSO solar, 0.6%of Total $ Fr $2,174,... CSO Gas, $1,631,33% PG&E Charges CSO Electricity, Rs'@,26 of 7 (trans.+dist.+etc. $36,1% Bay Gas, $485 minus Reserv.& CSO Vehicle ,10% Serv.Charges) Bay Electricity, POD Natural Gas $41,571 $528,11% $105,574 38% 15% Pump Stations San Ramon,$9,236, 12%of Total$ 24% POD Landfill Gas 12 Other Pump Moraga,$9,767, $35,541 Stations,$2,294,6% 25% 13% POD Natural Gas— Transmission Concord Industrial, L $52,203 $923,2% Orinda Crossroads, $6,806,18% Fairview Lift Station, $1,524,4% Lower Orinda,$3,879, 10% Maltby,$1,556,4% Martinez,$2,652,7% Operating Cost of CCCSD by Month TP Electricity Source in kWh TP MMBTU of Gas Consumed $350,000 $295,926 $318,737 2,500 50 $289,638 $290,717 45 $300,000 2,000 40 $250,000 3 m 35 1,500 30 $200,000 c v m 25 Mm $150,000 F 1,000 s 20 $100,000 15 500 10 $50,000 5 $0 0 0 Sep-18 Oct-18 Nov-18 Dec-18 Sep-18 Oct-18 Nov-18 Dec-18 Sep-18 Oct-18 Nov-18 Dec-18 ■PG&E Charges ■POD Reserv.&Serv.Charges ■POD Demand Charge ■Other Energy Charges ■Cogen ■Standby Power ■PG&E ■Natural Gas ■Landfill Gas ■POD Landfill Gas ■Natural Gas Delivery ■POD Natural Gas TP Electricity by Source in kWh TP MMBTU of Gas Consumed TP Energy by Source in kWh 30 600 100 90 4.92 1.73 6.93 2.05 25 500 80 3 2.05 70 till[ 20 400 � s 60 r 3 Y15 ° 300 x50 c 40 — 10OS o 200 22.67— — 0 30 25.98 26.36—29,27—29.58— ~ 20 5 100 10 0 0 0 2014 2015 2016 2017 2018 2014 2015 2016 2017 2018 2014 2015 2016 2017 2018 Year Year Year ■Cogen ■Standby Power ■PG&E ■Natural Gas ■Landfill Gas ■Aux Boilers WHB Steam ■Cogen Steam ■Cogen Electrical ■Standby Power ■PG&E This month CCCSD produced and purchased electricity at an average rate of $0,1155( /kWh(including maintenance) Anthropogenic GHG Compared to $0,1270 /kWh if exclusively from PG&E Emissions Renewable Energy Landfill Gas MT CO2e Profile 7,912 MMBtu zs000 17% 23,787 Generation breaks even with PG&E at $55,87 /MMBTU 20000 Recovered Waste Heat 4,898 MMBtu Natural gas was purchased at 15000 11% $3,34 /MMBTU v Solar a rate of � 39 MMBtu eq. ou 10000 Total Non-Renewable 0.09% 2 32,869 MMBtu /MMBTU as transmission cost 71% g $1,655 5000 VICE Renewables Natural 573 NI eq. 0 1.24% CCCSD produces steam at an average rate of $0.0033 /Ib steam February 21, 2019 Regular Board Meeting Agenda Packet- Page 75 of 111 Page 3 of 7 !I SUMMARY OF CENTRAL SAN'S 2018 ENERGY USAGE Board of Directors Meeting February 21, 2019 Clint Shima, P.E. Senior Engineer a Plant Maintenance Division i - Slide 1 = OVERVIEW • Central San's Monthly Energy Usage o Board Updated Quarterly • Treatment Plant 2017 versus 2018 • MCE Impact • Monthly Usage Statistics • General Energy Information 9A Solar Panels _ _.. Slide2 ' February 21, 2019 Regular Board Meeting Agenda Packet- Page 76 of 111 Page 4 of 7 TREATMENT PLANT 2017 VERSUS 2018 2017 2018 Natural Gas (NG): 398,000 MMBtu $1.8 M 421,000 MMBtu $2.0 M Landfill Gas 89.000 MMBtu $308k 94.000 MMBtu $354k (LFG): Total: 487,000 MMBtu $2.1 M 515,000 MMBtu $2.3 M Electricity (PG&E&MCE): 61606,000 kWh $1.3 M 2,093,000 kWh $806k (Cogen): 19,679,000 kWh 22,236,000 kWh Total: 26,285,000 kWh 24,329,000 kWh Slide 3 �` I MCE IMPACT (MCE • MCE began providing electricity generation to Central San in May 2018 • Savings: Approximately $18,000 compared to PG&E rates • In 2019, MCE expects Light Green to be 61% renewable • Total PG&E and MCE 2018 Cost: $806,000 • MCE (May— December 2018): $116,000 Slide4 February 21, 2019 Regular Board Meeting Agenda Packet- Page 77 of 111 Page 5 of 7 MONTHLY USAGE STATISTICS Total Costs (NG, LFG, and Electricity) o Range: $268,000 to $394,000 o Average: $312,000 Average Cost / MG: $289.50 Average kWh / MG: 1,861 Area Cost Breakdown Treatment Plant: 83% — 88% Pumping Stations: 10% — 15% Collection System Operations Facility: < 1% 4 � Slide 5 = GENERAL ENERGY INFORMATION Increased cogeneration production reduced electrical import NG 2017 Average: $3.50/MMBtu NG 2018 Average: $3.24/MMBtu • NG 2019 Average: $3.04/MMBtu • NG 2020 Average: None • New LFG Contract in October 2018 Supply is steady 2018 Greenhouse Gas: Below 25,000 CO2e MT Renewable Energy: —27% Slide 6 ' 1 February 21, 2019 Regular Board Meeting Agenda Packet- Page 78 of 111 Page 6 of 7 GENERAL ENERGY INFORMATION PG&E Filed Chapter 11 Bankruptcy Protection on January 29, 2019 Service will be maintained Energy Optimization o PG&E large integrated audit o Strategic Energy ManagementF _ Slide? SOLAR PANELS INSTALLED AT HOUSEHOLD HAZARDOUS WASTE FACILITY AND COLLECTION SYSTEMS OPERATIONS FACILITY 2017 Produced: 288 MWh ` 2018 Produced: 277 MWh rt r rt Slide � February 21, 2019 Regular Board Meeting Agenda Packet- Page 79 of 111 Page 7 of 7 Slide 9 I February 21, 2019 Regular Board Meeting Agenda Packet- Page 80 of 111