Item 3.a.
CENTRAL
CONTRACENTRAL COSTA SANITARY DISTRICT
January 14, 2019
TO: ENGINEERING AND OPERATIONS COMMITTEE
FROM: DAMASIO ZEPEDAARAGON, ASSOCIATE ENGINEER
REVIEWED BY: SASHA MESTETSKY, SENIOR ENGINEER
EDGAR J. LOPEZ, CAPITAL PROJECTS DIVISION MANAGER
JEAN-MARC PETIT, DIRECTOR OF ENGINEERING AND TECHNICAL
SERVICES
ROGER S. BAILEY GENERAL MANAGER
SUBJECT: RECEIVE UPDATE ON UTILITY CONFLICTS DURING SEWER
CONSTRUCTION PROJECTS, INCLUDING THE WALNUT CREEK SEWER
RENOVATIONS, PHASE 12, DISTRICT PROJECT 8435
Attached is a presentation on utility conflicts during sewer renovation projects, including the Walnut Creek
Sewer Renovations, Phase 12, District Project 8435 and others throughout Central San.
Strategic Plan Tie-In
GOAL ONE:Provide Exceptional Customer Service
Strategy 1 - Foster Customer Engagement and Awareness
GOAL TWO: Strive to Meet Regulatory Requirements
Strategy 1 - Strive to achieve 100%permit compliance in air, water, land, and other regulations, Strategy 2- Strive to
minimize the number of sanitary sewer overflows
GOAL FIVE:Maintain a Reliable Infrastructure
Strategy 1 - Manage assets optimally throughout their lifecycle, Strategy 2- Facilitate longterm capital renewal and
replacement
GOAL SIX:Embrace Technology, Innovation and Environmental Sustainability
Strategy 2- Evaluate Business Processes and Optimize Business Operations
ATTACHMENTS:
1. Presentation
January 14, 2019 EOPS Regular Committee Meeting Agenda Packet- Page 3 of 27
Page 2 of 5
+ UTILITY CONFLICTS ON SEWER
RENOVATION PROJECTS AND
OTHERS
= Engineering & Operations Committee
h January 14, 2019
ry
Edgar J. Lopez
Capital Projects Division Manager
moi¢ � •.
ELECTRICAL VAULT ABOVE SEWER
' DSM1 > 73E
Pa 2423
era blocked,, inspection abandoned -
Working with PG&E to remove bar and sewer repair.
2
CENTRALSAN
1
January 14, 2019 EOPS Regular Committee Meeting Agenda Packet- Page 4 of 27
Page 3of5
ELECTRICAL POLE ANCHOR
DAMAGED PIPE TEMPORARY REPAIR
%LAVEFAIDA 13�S-S <- 7NS"6,
r'
AA
r
L
�r
arl
- e
Sewer repaired by CSO staff, working with PG&E for final repair.
Af 3
CENTRALSAN
SOUTH ORINDA PHASE 6 -
WATER PIPELINE NEAR TRENCH
LEAKING PIPE TRENCH FAILURE
mro
:
Discovered during night work in Downtown Orinda.
_ � 4
CENTRALSAN
2
January 14, 2019 EOPS Regular Committee Meeting Agenda Packet- Page 5 of 27
Page 4 of 5
SOUTH ORINDA PHASE 6 -
WATER PIPELINE NEAR TRENCH
r
r
v-r
i
••f fr
Additional work due to conditions, including shoring.
Restoration at cost of up to$54,000.
5
CENT■
WALNUT CREEK PHASE 12 -
COMMUNICATIONS DUCTS
EXISTING SEWER DUCT BANK
'J
• fir.
i4POOM
U Ft 91 VA P-Q 00
EL&161 IVf
Delay in construction, modified standards to install new sewer.
Total cost for replacement up to$160,000.
_ � 6
CENTRALSAN
3
January 14, 2019 EOPS Regular Committee Meeting Agenda Packet- Page 6 of 27
Page 5 of 5
QUESTIONS?
4aq) 7
CENTRALSAN
4
January 14, 2019 EOPS Regular Committee Meeting Agenda Packet- Page 7 of 27