HomeMy WebLinkAbout12.c. Receive FY 2017-18 Optimizations Annual Report and Optimizations Program Plan Page 1 of 39
Item 12.c.
CENTRALSAN
CENTRAL CONTRA COSTA SANITARY DISTRICT
November 15, 2018
TO: HONORABLE BOARD OF DIRECTORS
FROM: CHRISTINA GEE, MANAGEMENT ANALYST
REVIEWED BY: ANN SASAKI, DEPUTY GENERAL MANAGER
ROGER S. BAILEY, GENERAL MANAGER
SUBJECT: RECEIVE FISCAL YEAR 2017-18 OPTIMIZATIONS ANNUAL REPORTAND
OPTIMIZATIONS PROGRAM PLAN
Last November, the Board received a report of the optimizations completed or in progress since August
2013. This was an effort to capture all the achievements made by staff to strive beyond performing their
regular duties, but to also improve upon them by applying human ingenuity, technology, and innovation.
Since that report, Central San was recognized for its commitment to optimization through inauguration into
the Leading Utilities of the World, a growing network of 36 of the world's most innovative water and
wastewater agencies.
Attached is the Fiscal Year 2017-18 Optimizations Annual Report (Attachment 1), which contains
completed and in progress optimizations during the last fiscal year, as well as optimizations planned for FY
2018-19.
The attached tri-fold brochure encapsulates the highlighted optimizations of FY 2017-18 (Attachment 2).
As we continue in the spirit of efficiency, effectiveness, and continuous improvement, the Board has set
forth as one of its FY 2018-19 goals for the General Manager to formalize an optimizations program at
Central San. Attached is the Optimizations Program Plan (Attachment 3), which outlines the objectives and
structure for the first year of Central San's new Optimizations Program.
This item was reviewed by the Administration Committee on November 6, 2018. Hard copies of the report and
brochure will be distributed at the Board meeting.
Strategic Plan Tie-In
GOAL ONE: Provide Exceptional Customer Service
November 15, 2018 Regular Board Meeting Agenda Packet- Page 137 of 254
Page 2 of 39
Strategy 2- Foster employee engagement and interdepartmental collaboration, Strategy 3- Maintain a strong reputation
in the community
GOAL THREE: Be a Fiscally Sound and Effective Water Sector Utility
Strategy 2- Manage costs
GOAL FIVE: Maintain a Reliable Infrastructure
Strategy 1 - Manage assets optimally throughout their lifecycle, Strategy 2- Facilitate long-term capital renewal and
replacement
GOAL SIX. Embrace Technology, Innovation and Environmental Sustainability
Strategy 2- Reduce reliance on non-renewable energy, Strategy 3- Encourage the review and testing of technology to
optimize and modernize business operations
ATTACHMENTS:
1. FY 2017-18 Optimizations Annual Report
2. FY 2017-18 Summary of Optimizations Tri-fold Brochure
3. Optimizations Program Plan
4. PowerPoint Presentation
November 15, 2018 Regular Board Meeting Agenda Packet- Page 138 of 254
fes= Page 3 of 39
• R p
M
�t
hum }
,tom
tis �i
I
4 �
f T CENTRAL CONTRA COSTA
�.}.. SANITARY DISTRICT
VI -
. OPTIMIZAI IVNb
ANNUAL REPORT
FISCAL YEAR 2017-18
r ber a5,201e lar Q.oardMee�nda Packet- Page 139 of 254
`4W
• Z�11. • •• 7V t q
1 t Z. I:"VIII rA.
f �
04, .I III
AW
•- -- S;'1I13
- • = = • • - USINE S P. OCESS IMPROVEMENTS 06
E am
..INF CTURE UPI 112
EFFICIENCIES 118 -
MINN
it
t 1L. -I
ON THE HORIZON 122 ' ' "`
1
CONTINUOUS IMPROVEMEt4T
A MESSAGE
lieFROM THE GENERAL MANAGER
InMl&mber 13antral WaEucted into deeding tkdities
World OhWb6idfuI dative
at�e1r tommitment optimization ,
whichbaw doing OmdW which mon to
fey
WEDw tetters udwitive ttrDmes fiileds
duct enfitomers flaicafgA d e rs continuous
anorovement increased activity do aaibhe iues
#!�pnges qure
mrbirements EftMignges organization
fib*, Feu,tech dolativ�s
and*aintenance &M et �*bAever
ring int
yrs and no r oustomers
Tomaintain ;deet FY 2019 20 b*bsting
More d mli ure Oet
IlUlmrement To fide 1zpayers
reviewetsDns omijTw
apdtetioeal ar foxtiveness efficiency
ii imizations thport t
towardi bgement and keeping hoWes as
pdabflAm high Wreice &Urkeholders
Regards
ROGER S. BAILEY,
GENERAL MANAGER
PAGE 01 1 ABOUT CENTRAL SAN
November 15, 2018 Regular Board Meeting Agenda Packet- Page 141 of 254
OUR MISSION, VISION,
Page 6 of 39
VALUES, AND GOALS
MISSION
To protect public health and the environment.
VISION
To be a high-performance organization that provides exceptional
service and regulatory compliance at responsible rates.
VALUES
• People • Principles
• Community • Leadership and
Commitment
STRATEGIC GOALS
1. Provide Exceptional 5. Maintain A Reliable
Customer Service and Infrastructure
Maintain An Excellent
Reputation in The Community 6. Embrace Technology,
Innovation, and
2. Strive to Meet Regulatory Environmental Sustainability
Requirements
3. Be A Fiscally Responsible and �
Effective Wastewater Utility
4. Recruit, Develop, and Retain 1000/0
a Highly-Trained and Safe
Workforce
ACHIEVEMENT OF OUR STRATEGIC
GOALS AND INITIATIVES
IN FY 2017-18
PACE 02 1 ABOUT CENTRAL SAN
November 15, 2018 Regular Board Meeting Agenda Packet- Page 142 of 254
FY 2017-18
Page 7 of 39
STRATEGIC ACCOMPLISHMENTS
CUSTOMER SERVICE
• Hosted the third Central San Academy to educate 39
interested members of our public.
• Celebrated the 20th Anniversary Household Hazardous
Waste (HHW) Collection Facility and held a Collection Drive,
serving 907 visitors - our highest participation week ever.
ENVIRONMENTAL STEWARDSHIP
• Achieved 20 consecutive years of total compliance with our
wastewater discharge permit.
• Executed a memorandum of understanding with local water
agencies to collaborate toward an innovative recycled water
exchange to augment the region's water supply.
• Increased collection of HHW by 7% (140,594 lbs.) and unwanted
pharmaceuticals by 4% (729 lbs.).
• Reduced sanitary sewer overflows by 36%, from 39 to 25.
INFRASTRUCTURE REHABILITATION
• Continued to meet critical needs identified in our
Comprehensive Wastewater Master Plan.
• Installed approximately 10,000 feet of 18- to 24-inch trunk
sewers as part of our Pleasant Hill-Grayson Trunk Sewer
Project.
PHYSICA! 4ND CYBER SECURITY
• Received Municipal Information Systems Association of
California Excellence in Information Technology (IT) Practices
Award, as one of only four special districts to do so.
• Completed Security Assessment Master Plan.
PAGE 03 1 ABOUT CENTRAL SAN
November 15, 2018 Regular Board Meeting Agenda Packet- Page 143 of 254
_ .V_
_r
i
Page 8 of 39
CENTRALSAN
CENTRAL CONTRA COSTA
SANITARYDISTRICT
ABOUT US = -4`
Central San is a special district governed by a five-member Board of Directors,
who are elected by voters within the service area for four-year staggered terms.
182
-square-mile service area
^Martinez
290
budgeted full-time employees
Established in 1946 Concord
Pleasant Hill
Clayton
Headquartered in Martinez, CA
Walnut Creek
Orinda
■
Serving Lafayette
488,900 customers
Moraga
and Oakland
Danville
3,000 businesses
■ Headquarters,Treatment Plant,HHW
Collection Facility San Ramon
1,540 miles of sewer i elines ■ Collection Systems Operation(Sewer
p p Maintenance)
operated and maintained []Wastewater Collection and Treatment;
HHW Collection
Wastewater Treatment and HHW
44M gallons of wastewater Collection A
o 2
HHW Collection only �Miles cleaned and disinfected per day
November 15, 2018 r Board Meeting Agenda Packet- Page 144 of 254
y r�
• LN I A%%
$139.5M TOTAL
"
FOR FY
2018-19
] $89.7M for O&M
$45.5M for Capital Improvement Program (CIP)
*> $5.6M for Debt Service
$0.9M for Self-Insurance
O&M .4' .
r .
2M pounds of hazardous waste
per year collected and kept out of
landfills and waterways each year
12,500ounds of unwanted drugs
s
p 9
collected each year by our
Pharmaceutical Collection Program
11,140 visitors served at
V, r the Residential Recycled Water
• , ; - Fill Station
3,433 students educated in h '
pollution prevention programsE 05 1 ABOUT CENTRAL SAN
'
November 15, 2018 Regular Board Meeting Agenda Packet- Page 1
BUSINESS PROCESS IMPROVEME 1,
As we prepare for a major project to replace the enterprise resoup e 10 of 39
planning software at the foundation of our operations, we are
' - identifying opportunities for efficiency within our business processes.
The improvements made as a result of these efforts have made use of
YJ. available technology, increased our predictability, and improved the
sustainability of our operations.
COMPLETED PROJECTS
BUSINESS PROCESS DOCUMENTATION AND READINESS
ASSESSMENT FOR ENTERPRISE RESOURCE PLANNING SOFTWARE
With stance i 155, uizb pmt OFOA staff
analyzedand documented Pashe®ses Accounting Asset
MakJogrTiqnt Permitting ,
606t-ajner Human Resources Peymflfimbnt
Ryocure Qtgiftb g Nubatgigment
Rn*erty Land Wenbijenhent &ppocutienttieg
inworkflow ,which indbrporated in cow eTikiwpTce
planningRRP software
ELECTRONIC TIMEKEEPING
krtelliTime automated t6perting and teeaking ttmt
eliminatedjaaperwork thmekeeping J5 _vees
tacess Oir�&sheets nabs eapervisors see
ttm&group Rill INHEE'lew I&ly 2018
b1t;trng on Pfi#Wti&d iiigeiftcantt
from�Tnd [rum ck fiei�enl met selecting the
acdclor tobffrict tmiffwd on and deport
newprogram .
ENHANCED CUSTOMER WEBSITE
�ilevv centralsan org improves `' '
trladsparency wee 1, el
,
turners expect PROTECTING
fromtlkn�brezes PUBLIC
olid to find information and AND THE
horates ENVIRONMENT :
refreshUdedlent femdback OL
ftfitd and #Dillic
tbatistics dine
fisted in seeing and how
to motion
PAGE 06 1 BUSINESS PROCESS IMPROVEMENTS - COMPLETED
November 15, 2018 Regular Board Meeting Agenda Packet- Page 146 of 254
ROOM SCHEDULING AND
VISITOR CHECK-IN APP
Pagel of 39
Them mpp ek#bwce s
schedule VabLetted aside
roomUsing tWaWtDyees tick
roomavmi lability aahetlla�-_ directly
onence
dipped with daipa bi I ity
FY201819 .
UsingdWe VLOw bbtek
ffifidots signing bDg book
069t rs fifth r
informationon suIbi1dt Ohre
andpiiitittly bi3rdgdaneously
e.yees
hawed simb i I text
PURCHASING REQUISITION TICKET SYSTEM
And tic system u0s fbirchasing filers
skilllllbki�bons Witomer
satisfactionwhwy fbi#Wett Purchasing tdeb
informationto #lxh61d1bzd and establish toetrics intprlaaL-
earls 1i®n bion '$ycftetn dies
pdathDrm desk diti-qTaI needed .
CONTROL SYSTEMS WORK ORDERS
FIs in Phut our
computerizeclsiyl eaweTa marks
tobhqjnreyk3d tbility dines
andeffdrdnate tedce
c ry vdb1itImns bA I
feda.fbdeshooting and tosiking related to Gppgt rr is
FIs diti-qTaI needed 010gaWks
tom Collection System OWrations Jnm6htenance
INTERNAL AUDIT PROGRAM ESTABLISHMENT
6antral developed program to eUddsBdt bmited
bfsghber b*:s FY W)17 Owbnpleted
bud itaI pa#pII and Obhurement "E�p of
contracted&it(jerked bmovements trade the
auditedtuocesses ar f#ieroley controls
PAGE 07 1 BUSINESS PROCESS IMPROVEMENTS - COMPLETED
November 15, 2018 Regular Board Meeting Agenda Packet- Page 147 of 254
DOCUSIGNO
Docusign bymkgroup P i$2 of 39
firing OMtzed savings eyBk4 and
reducedflA;6mai/ork hwhees training tuailable
dfi idirons Rurchasing and Human ftaUmbzds
AUTOMATIC VEHICLE LOCATION
Followingoi lot RWon WetworkFleet
now ira
Ak gram ves to efficiently _
dispatchfield hews *d on Jocality
I'F
fittiifiles icons
tbsTwnse pnabrgencies fadluces
consumption&bffg dAKirlestic
teports bE dchmarks plreatAive
p011aitliAtenance hdlllp cqydielol
eafits dEdmadme
DIG SMARTO
Se ntral also implemented Dig ftl niatt emetically
ander computerized Rityworks
Oftroximately Underground Ak&tdce locating reclerieod
15�O ry #wtld Love th3dina Ily
boars Rig394dafteet &1dart-_s
ttrng araWks bilmulteey Oityworks
ROD-STORAGE RACK
Toperform amaintenance sodding eve
thjock dale.6pTnent
&add do this ftwWW Elbbirle
went to dmEoil
V
Ydg #biffsed Way
bbokife O f Ese yard each 1
RWA i t ttAEhdisrW b I es eagle
toils onto an whicty aaamu -
fa ctu red i n G-RD yard NkdfA
040ding bkmibersome
MAINTENANCE HOTLINE
Apihrrneion a"s 66affrttenance efficiently
o6t"hmunicate each b#idng x chn js damectts
ehohinations bdbw tstrwe
eckaflu&iiiksaIIy to Mail mance Manager
and5uperintendent
PAGE 08 1 BUSINESS PROCESS IMPROVEMENTS - COMPLETED
November 15, 2018 Regular Board Meeting Agenda Packet- Page 148 of 254
MECHANICAL SHOP REORGANIZATION
Stuffftanical fkm been ! .
improved Wocating ted age 13 of 39
gridders tvhreels ceding •
arm consolidating aa& bolts
shelvinginto phlibovas
ging tpace ereate
reservedbbf;assembled equipment r
awaeteng s oKfttered the
shops IMb6es tfti3nder
been relocated to keep c
dhlloblyg area
1
OTHER COMPLETED OPTIMIZATIONS
•
Modifiedfikokig6tp to to plicated Wsier
readand snore With byemies
• Establisheda newdbnzsdytent fimproved tracking
andsegregation iacy
fused-ve
• BeganAmaming Board tneetings dAmby on web accessible
allu'esg tonployees qpeue Lting arfterest
inpftEieding theetings
•
I n s t a I I e d an-d rt b o a rd s aeras f k mte
meetinginoadihtjes facilitation h tdlnAews
meetings
•
ImplementedOffEmAsoft bodluding wipe
Mjmk WhMnt others
• Replacedoldtjh e software
withtherie 20 new and improved beadiness WpimbtaI
tearer read and tosier produce
• OutfittedWMtment tablets Orev de with mobile
tmcess ambiltmatics dther
• Simplified€hffchasing requisition Offing
authorization k si on .pzp&oilsory mdeidtng the
kolabbxol 18to3
• Beganscoring Rliiifipasals @W&-,a 0g
s he streamlined and kdtpmated
pfticoss bblifilifoes teapa s tbbstantiate
evaluations=mitteeedation h3vard
• CreatedWrideus iygh USOSonline
• Startedusing bldlie(tetion to allow bedpi4ctions be
conducted lll:ehone
• Updatedand serialized instituted paperless
ac�hel�z
PAGE 09 I BUSINESS PROCESS IMPROVEMENTS - COMPLETED
November 15, 2018 Regular Board Meeting Agenda Packet- Page 149 of 254
ONGOING PROJECTS
ERP SOFTWARE REPLACEMENT Page 14 of 39
SunGard HTE been Sant raI F,RP $mare
figuUedat i o n a I iiw
HumanAnscawnd6Wt Billing and related subsystems
f planned to perform targeted tmprovements extend tif —
aa re evements thgEfitlatio ns
utatbuntering vision toaEde EeoGized
lately to rtrz�&e
moment high tmquod,rt an RFP in Dtigg a
detailed0 tO system tequirements weeding vendors
canr �� nts vekDdbon
implementationkhedu led to begin in 05flI� BMW considering
staffingaugmentation tweds allow bmpdr)yees dohtipue
addition to setting up 9RP and learning how to Use
INTRANET REPLACEMENT
ftmt&ntn thUnhe F ��
mationSystem OTIS end Ri ration F' ._
-:
Witagement DIMS anets
r�
datedMaw bn}msnse hMction
properly dmnftits W(ficult
wA,
keepupdated Haw Mkwets staff
to res
amahuals laiu#3kos dimer t tes
Aselection e k ee ;a„r
fhemonstrations Digital
vnir.mW�.bho
fI obyment Was used to update .
r with staff
tojiltte
RISK INVENTORY
I n Wfit@wt j3regiee$eng i Brent
whicham*brgement &Atd7Tabn Those ri&a in
an tory evaluated misting and planned riskigation
qufflTtilbeing inrent oval in consideration of
dh&elopment gsent jiftere
aaarbnbdWd mitigation des and caWrts be
pmffbixdically Om rd
DIGITAL PROJECT PLAN REVIEW
@mlfhtor It msent Ofrecess
pilotingnew .isei sEgy W#Mt
allowengineering pct kEe✓iewed and inspected digitally
PAGE 10 1 BUSINESS PROCESS IMPROVEMENTS - ONGOING
November 15, 2018 Regular Board Meeting Agenda Packet- Page 150 of 254
AUTOMATED SLUDGE RETENTION TIME CONTROL
addEjtib mt entia I betldiaw Page 15 of 39
which and
dissolvedflixtation operation To help maintain fs@ sistent
automatedgjmtCfds irctatalled to anultrit=usly adjust
tk6vated drs the
alyftetiynts
tefted re in WiV g6l I five M?sB
PROJECT MANAGEMENT INFORMATION SYSTEM (PMIS)
dement implementation @Lilder track
schedulingand cash flow efigineering glee
faint timTeuming and Mlle
ly Buiildim and
tollout wed bonuary A0A ,with the
4bbption 291%9
PIPELINE CLEANING SCHEDULES
CSOUDntinues oll:elariiiTp b9heduIes
bining §cff¢biaaIly aiaitb mize
toffy d6mmases - -
betweenjob airt>el§ fill ias61yity
Miert OWextimately bfies ZN
e scheduled boaWs
each eduled ming and
WAff t6aklinge
aid u i es 06dIlteg oreWs
REFINING USE OF CITYWORKSO
Wntinue aWne
:r eng)Norks boding custom
a templates tbnate
� repo rtarh 9 process
I _ 5ts& collaborated to troubleshoot
FIs 6edd✓s
WINNER tdY)l an upgrade
eibgwerim in tome rks The
Boqzrtmental Award , addedtbility Gloom
recognizinguAemplary nowaccbss erft3ffmation in the
G*Works eru5htively fieldbying Owded amps
tmntribute tbotinued Vw1lelts tyncs ted
f®rrernent
PAGE 11 1 BUSINESS PROCESS IMPROVEMENTS - ONGOING
November 15, 2018 Regular Board Meeting Agenda Packet- Page 151 of 254
�. INFRASTRUCTURE UPGRADES
Through responsible and robust maintenance practicjlgW6 of 39
'gave extended much of our infrastructure - originally built in
the 7970's - well beyond its typical useful life. Therefore, we
completed several optimizations this year to upgrade our
i equipment for reliability, safety, and compliance with current
and future regulations.
COMPLETED PROJECTS :.
HEADWORKS SCREENING UPGRADES
iTfto r ks
t reanquoics -
fromf ,tewater to plrmtect reduce
ossa r twvnstrea m ftladpment
tuabce art
thinned CIP inetaIled new Wheibris
litatedtwo atmteftEy added new odor
daldt6ol gatection 13 eaipment
encloseddesign tmnnects tobtrol
systemwhich msilllSt Health Risk
I
ue ry
r
good efteova I Nesage
broAtejials collected Weethly
alsoseen JAEgging downstream and reduced
tiwd to clean Violet
ofe@� nent
ENHANCEMENT TO LUBRICATION PROGRAM
rttenance grease their
work Important have sot�ent
inffe ba&pss lubrication .
FrtoOntoried Y7mmtffie fiedIngs
ingimEftanical assigned oodTs
distributed art tffitenance help
themt fl�%tion bquipment d Fue Marine
filatltment guard against
p i�nation gfzhse stffff
time being tale Wa
color �+
PAGE 12 l INFRASTRUCTURE UPGRADES - COMPLETED
November 15, 2018 Regular Board Meeting Agenda Packet- Page 152 of 254
VULNERABILITY/SECURITY STUDY
fiWilirtmental iRiddebbilities Page 17 of 39
and' agents taking h1oklaralls
eadhquakes flooding into consideration In FY M)17 AmTuated 20
mollities completed Medy GExarld klyation r3®$nmittee
beenformed to t>bgllemm-rtded improvements plhdses
developrecommended podcies programs
PROXIMITY SWITCH PILOT AT PRIMARY SEDIMENTATION TANK
Ap,rMdhnity inataIIed bbeg Ilat:tor gearbox
p6lot dmobffilmnical finical was
usedto stop dhator buds ixWberable tberosive
11-1-1 1pent hu(6talled in bll
longfthktors thak& foiaintenance 2019 .
LONG FLIGHT COLLECTOR MONITORING SYSTEM
Aph )
inata l l ed to n-wr*b r ,
operationin tbdimentation tank
tri uhtd es
armstationed on each t1fia/e
VH,iftb i0h is r
damede byoken chain , T
skippedchain damaged Fhkts k li M ITI M
PLCcan velnme f'rg L-n
soman OfibmDr RR 4q RR R
fwitm9L. f gh is
ohain and Voirators
HYDRAULIC IRON WORKER
anical now Wgdraulic Worker
tote
mu*s custom tooling €mound #pant �
ek-vtlion (nods
tmsive M*Upment tiwe = _
tbility §hAaad e1w punch instead of -
elcilde notch Oansad t6rching
andto grind and trifid 2I$is eliminates
nta I
such&orres cutting torch and atmospheric
frerticulates grinding .
PAGE 13 1 INFRASTRUCTURE UPGRADES - COMPLETED
November 15, 2018 Regular Board Meeting Agenda Packet- Page 153 of 254
DON'T JUST FIX IT;
IMPROVE IT Page 18 of 39
Our Plant Maintenance staff is
constantly rehabilitating our
assets to extend their useful life
and optimize their performance,
going beyond simply performing
the preventive maintenance (PM)
or repair, but also asking what
more can be done. Work is
categorized as a "Don't Just Fix It;
Improve It" (DJFI) in the following
situations:
Proposal of an optimization idea
- Failure before an asst's useful
life
- Repeat failures showing on the
Bad Actors list
• Multiple reactive or corrective
work orders on a high-criticality
asset
More than 1 reactive work order
with a priority of 1 or 2 on specific
asset between PM tasks.
In tota1, 14 DJFIs were completed
in FY 2017-18, including those on
the following pages.
WINNER -30'
bility
SMineering
Mad9twmnce
NaII 0 1 0'•
ba.:(11ership
PAGE 14 INFRASTRUCTURE witlbbility
UPGRADES - COMPLETED DJFIa management
November 15, 2018 Regular Board Meeting Agend6 Packet- Page 154
FURNACE NO. 2 CENTER SHAFT DRIVE
Theold sbiftr in Multiple Hearth Page 19 of 39
Furnace No 2 had multiple hgzlesement
no ale {>frchase and the
des fly0aulic were maintenance and
re #mss be removed with an
ated design Xhus new design involving an
the gearbox was
structed and a variable ftiquency now
trols speed t#ie pabbdi FIs
possiblebefore The new design tikes
ftfiilsibility btsb fifties
maintenanceand more system control
REPLACED CONDUIT AT PRIMARY SEDIMENTATION TANK
Stofficed a mss inatalled as pilot
stemless The old adnd d mater drain into
gindors lag in Sion damage shock
hazardThe new rpo n old the and droves
tililiability equipment
SPLIT COLLAR WRENCH
ilieassembly fadlbr pump>Ihalgves
a cbatltnn,�e Ose wrench thad
refabricated f®e 08*jll1bA
J abhined a wrench from a #Whr
3
���ility M49er NMsle the
zhskssembly mWiming downtime man
hndrs andiponents eliminating the risk of
damageto the uhabve Wdsked so thm
ikpff designing a splim rh The
smi I
ACCESS HATCH
z� Ahatch wasted finder hefioss a
three vwdye the pre aeration basin €bior
tallation to reach the valve pperators
to remove a pedel railing and
po a confined space w tio
�J t 2 Sours
PAGE 15 I INFRASTRUCTURE
UPGRADES - COMPLETED DJFIS
November 15, 2018 Regular Board Meeting Agenda Packet- Page 155 of 254
OTHER COMPLETED DJFIS
• Modified0miar &uuth Glarifier Wdibgx greas�age 20 of 39
Pm rt th& reducing @Wky
• Modifiedand bbbgilt gntation
tamilplifying todr>jions qf0a*Wgjk ti le by
addingatop in Oa6tidn
• Addedbi(awa lwn f emL-ration Bogen differential
OpEtRdti piping testing 4ozihgemabcia to better
maintainand nt remove
p6p,dbiittion ptugging in #d*W6hg
downthgen ofigEibility falling dffbne €eying
OTHER COMPLETED OPTIMIZATIONS
• Replacedoeltworking switch to OnbkWimzzy
leuiIt nisms 6ty
QW*e tacess di-etwork
• Expandedn-mtW(bolking tools tively
• Installed*oftnding sings certain tnotors p-ffdYimatEee
bang failure
• Designedand fabricated baih fhk gybes
scrubbers
• Designedand fabricated pb ff�ileg thevice fdciiii L,
khdsiker hfijibesey effectiveness
• Modifiedauto lubrication hyktems in mug
plects ORWi4wneh arms installed an auto -
lubricationsystem on baduced C&aft wags
• Designedfabricated and installed new gFiiltites smooth transition
from�qaiare aaund Ohneeating clogging up t&her
conveyor
• Improved t0fifieWqt disinfection bypatz;
instal lingshutdown dntkys enhancing dmfiLet
• Pilotedd?trs �bqntation basins
sesta ry
• Tra ns i t i o n ed d6dUcHid draft from an
tlaWti>rtetl-r tied e rn RLKa a c
• Enhanced&mjgwe bpVjmling
otic
No]0
• Implementedcogeneration British thi tmal
tantrol eax&gy siprepAMpn
• Streamlinedand cleaned Witodan server
tospdwfije
PAGE 16 I INFRASTRUCTURE UPGRADES - COMPLETED
November 15, 2018 Regular Board Meeting Agenda Packet- Page 156 of 254
ONGOING PROJECTS
SECURITY DRONE Page 21 of 39
Central bostracted with an Oqdablrymy fly
droned preperty ptunt
tble aacbss pmtbklly kCtly
penclingA&dareh Administration approval
STEAM AND BLOWER REPLACEMENT PROJECT
Itment system imochplex aging haquires _
sigW tematnce ential perform
dodoiaallp pAtbllel pec
*d ly ffiwAa n d s #+s==
dbDwe rs extra fow air
demand)nridfitions dfigggers
W&W4P &nergen -
Undersized fiends
mere sedandant ble ec
Ism and dement used
CIPkdms dan3dition and remaining d&sfUrhg boiler
fkedrmater and aeration efflstlffrirated structural
efEdtrical instrumentation and ti*Wknds confirm bmt
wry aeration system I metibwnt
botheadtent Nftele Wiloment optimal
&[dressing 0@10fiiWents
supportingtffb at3orative expand dipycled s aiJer the
Refiydgd mange
PORTABLE LOAD BANK
Pumpingyed pocdattle
loadfEmhiing fixed and gontallDrs verify
operationlm-,Fdler Vikilw thoEncord
NgWhbrial Kleen and C?u3nroads
pingons lamok9w „u,
PTOOTWnance with #OW4jby tble
Omnh3klea nce
troubleshooting.
Bad tkWbks b.eed on the generators
mate A:ulate L;
bbt)ugh qMdretically good burn m rich
r to imt
festa n i ng
PAGE 17 1 INFRASTRUCTURE UPGRADES - ONGOING
November 15, 2018 Regular Board Meeting Agenda Packet- Page 157 of 254
EFFICIENCIES
As we look to double our capital program budget nexge 22 of 39
year and continue in our fifth year of keeping our O&M
budget flat, we have implemented efficiencies to
manage and reduce costs without sacrificing the high
level of service our customers expect from us.
COMPLETED PROJECTS
WET SCRUBBER PILOT
Iilfica n
Irs fir: .
pilbth confirmed aew
re �r
designfMaldbe t �
o6thpliance andent
EdEpl�t��lkn�l
i rements across
daltiltluents
collaboratedon tbiscessful WINNER
s
resultedin an estimated SanFrancisco statewide
i0vings 14M&xgoing atkmt
SlalkWing Facilities WEA Engineering and Research
Rn#mlzement ResearchOWhievement l awrd
OTHER COMPLETED OPTIMIZATIONS
• Refinancedttebt r roximately 82M through 2029 on gTtemst
costpa red to 0opmebts dtid bbThlds
maintainingdmmmll tit
• Negotiatedtkereases sive �EU in ids medical
a nd¢entialers
• Saved $50000 purchasing e
nt rate
• Repairedtwo a3dEkiblies U5CDs e ,which reduced the
Umbukidme toe e ks mks saved about
$8000 Oraick faerhanics fQtaI wmiters
$16000 and cm-u nth idiiwkntime
• Enrolledin Shereau motive Program to bene
smogrr aju6dment bqnding in dWR Atdgram This
s%ves 9300 Pmr smog SWEles twc-
t*ntj tbbicles getogged
PACE 18 1 EFFICIENCIES - COMPLETED
November 15, 2018 Regular Board Meeting Agenda Packet- Page 158 of 254
• Addedelecanting and filtration system to emulation machine
toad mated s�Iving *out 1300 !fir t& Page 23 of 39
newifiers
• Continuedto bitrirculate Yeaftmes
dissolvedflixtation gearboxes
ONGOING PROJECTS
LIME REDUCTION TESTING j=
bEiAded to btu3dge SIMedd�ng
gyration to help condition the `
Uptkjtelring in fbmace
Peclucingddmhacht would have r
amential mdMztis ` '' -
OE41a rs e ba4m i c a l relieve
impacity fbmace
Therefore ongoing eorative
rte-
th*biqtfsents ongoing to tbEt
e (t$ng limraleading W hlether
eabse melting in Xmsffes
benchteading Pampleted in FY 2016 17 ,.
Rmond i%g pmsLponed
ire bolnbul
a paraded
SODIUM HYPOCHLORITE USAGE FOR #3 WATER
tore aaptetnfcted and placed into aeayjcael 1998 the
tMd13ffyl (# dary motion
tit system implemented Bwttral started
addingsodium kl$kpffaifhIorite to tt*h and low #fIetdifying
thlity ate in Ositential
h*Vjb1hcy th i n)® wd ples
gathereddata
C(bEffffirmed fii# anent plant
v& tin admen System Permit
andthle &mter iilM&nption owvs
VantraI could ate feqmbchlorite to tigh
andlow [kessure ntly by
much.iag Wilted with elimination there
460tal reduction a)ciknately
ns with € jots patre)ntialIy
totimization ffnture
PAGE 19 1 EFFICIENCIES - COMPLETED
November 15, 2018 Regular Board Meeting Agenda Packet- Page 159 of 254
SOLIDS HANDLING FACILITY IMPROVEMENTS
motioning Building was Page 24 of 39
built thi3l 4970 bnd fuels
,tined C I P treject
X1111!
dWers new ei�nission control !i?r
it �I�ill�f�1 �I � r1c
with izesnents � lil�ll•IIIE�II■■ +� �+lltll '
andiency a es equipment ■��t �;
trp(izwnts
epdrations result lower &Mcosts
134ducing ehmtnical
napd3iltenance #Kgienses �.
includingf(bl&owing
• NewtAwkfing tArdd fo r
17dtdia J Ory
thickenedac tketed sludge
i m provi ngderdgfaera bi I ity
• N ewpaIlffm r high effittiidhges ftEkeps
increasedaffiitbility sial airialg less
f43&ace
• NewkldbKul�, combustion b'e'En fbEnace
improvingeirnission #kwjkys feud
• N ewtmiNbWErs bV#mgency ash slurry
drainsystem with P31tftia izrht tedt8le ensure
z6thpliance both existing and expected regulatcrnpnts
• Newest igattrat Wk collection system and ash plumpp
systemto esed eafgl� oyee
I �
�r
PAGE 20 1 EFFICIENCIES - COMPLETED
November 15, 2018 Regular Board Meeting Agenda Packet- Page 160 of 254
IMPROVE SLUDGE PROCESSING BY
e 25 of 39
OPTIMIZING SELECTOR T -
Agood > ctes.
resultingin int
pedaxtion in bulking and an increase
Wedtment f acity tfWmate
g6laievi ng da0abo
neededusing existing bhnbmtjbcture
improved performance
anqp6s4u soticrb(bration related to Pladomated
Slee d,ion Gptitrdiation on PagW help avoid over
$10MM rylents
y srurrently pti(igress
needto benducted on bDng term bmsis hbe
determiningstoq optimization actions
ADOPTION OF UNIFORM PUBLIC CONSTRUCTION COST
ACCOUNTING ACT (UPCCAA)
In1RrW Rm rd adopted t1;CCAA to bffpt(bivQber
2018With tIfiKCAA 13antral can bafrngI fnocedures
constructions bntracts 1 $0W meter
*ilonis I atrdVve
bfdding and allowt-tion xrelhNioing a
pcmbpR!ELitive containing po*ect
REPLACE EXISTING LIGHTING WITH LED LIGHTS
AMWb±ant initiated to bjiATade intensity
andioyent LED f'bctures ®avirgy
bbkstenance going on few gees pbi3;r
I•rghts R4W Collection fadjil tag wwh bql ting in the
atly andvorks Room ire
replaced.
PACE 21 1 EFFICIENCIES - COMPLETED
November 15, 2018 Regular Board Meeting Agenda Packet- Page 161 of 254
ON THE HORIZON Page 26 of 39
FORMALIZATION OF OPTIMIZATIONS PROGRAM
meted motions
whichingrains
b-ptimizations dat#i,prany fvk*der
divisionld3entified s ophi!ridemg
inFY 201849 listed below .
OPTIMIZATIONS CONSIDERED TO BEGIN FY 2018-19
iove 208 19 Inue work on the
ongoingftp#=kzations FY M)17 including €0grbffirtant
art5dats cement adkbp(dean tifie
UPCCAAand OIS in addition to fbdbowing
• Owkatlwwnt 91adtipurpose to record training
motions Wmks lops Academy
and er record oldrkmate
I along Yneund and
broad e n#mhaibiIities recording in them
• WeEll6ence system to mess
eachbersome € i eI
• Switchto CalPERS health fiffzWbWe retiree
Inca re � b
tost Santral through membership in *Igbr
• "ifilati communication Abe desktop phone
t9stems ie
dwa re
*tilafifging b ishment
• hbaffiage madatility Mey Collection
1540$tyng tbatracted staffing levels
PAGE 22 1 ON THE HORIZON
November 15, 2018 Regular Board Meeting Agenda Packet- Page 162 of 254
• Developsystem Ebarard Voticies Acbilr-6diste3tive Page 27 of 39
i•neiaodjiegient standardized Wi3deture
najiensive log and -kmtive
toocess o6thcide related tblmted Board Policies
• Linkpdnotos insets Wogtrapl ida system $o staff
ify went the
# ioarUment
• ]1ll#F-91 ,el to WWjAd6fi
lJotaftiollysioned with bmiphxilal staff
• t rent tuograms avoid dquilat met
fly WledWqess Oveak mrd
testi ngto ¢iraI F lite e /
troubleshootingand ultrasound testing ftmogiragns testing /
g7easing and ea*erMs
• Q*ace 8xygen whab)zer often blues
with ace with aew WnWer MW
need0fillillikmance idyle
oxygentesting on tfwv Onoflyzer ]aelhel$if
TMUI&mynts dfway oxygen analyzer
omnli theiinstrument
• Establishuabmising program to dW&tpm nt®tp
functioningtbAe lack tde avoid unforeseen delays capital
projects
fixed ds dement
causingoaer&dds T
t allivit4y disinfection l3q3falsing obsolete
kbdki�re on low otadsmittance coordinating
withUr4oluOwnent to WhiLm ily
systemwith aew mrntt, 13
PAGE 23 l ON THE HORIZON
November 15, 2018 Regular Board Meeting Agenda Packet- Page 163 of 254
� _ f
ACKNOWLEDGEMENTS
Central San is made of a diverse group of employees with varying skills and
duties,yet we have found opportunities to optimize processes across our
organization and will continue to do so as we move into FY 2018-19. Committing
to optimize often means changing our past practices or routines, and, at times, it
also requires a significant amount of work to launch and maintain. We
are grateful to have staff who recognize the importance of laying this
groundwork for long-term success.
None of the accomplishments in this report would be possible without the hard
work, ingenuity, and collaboration of our staff; the oversight of our managers
and executives; and the support of our Board of Directors.
*d
I�
vember 15, 2018 Regular Board Meeting Agenda Packet- Page 164 of 254
ACRONYMSPage 29 of 39
FOUND IN THIS DOCUMENT
• l�bitimlltic
• QftkaWment
• SpOw pion Operations
• WAFrove
• Bt�e
• lira I
• H H\A1WUmMeJuaW
• CJI �I�er�r�i�r�ce
• aftna ble
• P M PWW#0tTEffnae
• ,�atYmemt
• RSI
• Rg6i o n
• U MICAA AokAih titi g n
• UVraviolet
PAGE 25 I ACRONYMS
November 15, 2018 Regular Board Meeting Agenda Packet- Page 165 of 254
Page 30 of 39
CENTRALSAKORG
November 15, 2018 Regular Board Meeting Agenda Packet- Page 166 of 254
ACCOMPLISHMENTS : •
r10 0010
N NUMBERS -
des - 1.
$14M i
technology • „r'
.� s;i!�i ire��C: • — ��'
$8.2Mh r
d#btancingft
'' •
s
$297K v*ked . -.
OmAlWers
.:J W,G, - I
$SOK �tbl e ' ---
O g
ming
$16K
i bk liion : �►�� ���.
hmedvrb l i es
$9K filoba+nitting
NO
5npai edents
1,700 efibm#bige
top
fbituda: 1
oried
70 t> ""aging • • CENTRALSAN.ORG
program
• • FY 2017-IP
20ied SUMMARY OF
"b it 5,20 r OPTIMIZATIONS
ovember 5, 20 8 Regular Board Meeting Agenda Packet-
BUSINESS INFRASTRUCTURE EFFICIENCIES
PROCES&- UPGRAQES
1 VEMENTS
• . ftwjMeiminge •:NN :1 10 r.;:,
5t: m m;. -
aaiiCynent »•�»
U3qzg3wDc k
- -•
ffaigtment EAAeonment
- � Y Rudea rc h
Rtekdevehient
ONGOINGO WAizwdr Y-
ane DAMbber
fe4uxir&wpnts OIN
• ' - DON'T JUST FIX IT; SoiWing IL
IMPROVE IT
•,: .� : Meffiftenance
:n aou -
:
(8 01. Opiftpi-zonce JWWlessing
fialh
_ 01W&ate costs
= T ming
CityWorks Hxcellence fdaced QDMtratitign
DgmAit rental rimed ::a: • .
: -
t t•:n• "
bibmative �ty expedite
m a ilrge�ram # hpk&kdors project 0. -77?
ou#4EBtbons • -
EBtbons s completion
November 109"Miar Board Meeting end lb�VrPage 168 of 254
Page 33 of 39
Optimizations Program Plan
Under General Manager Roger S. Bailey's leadership, Central San has emphasized
optimizations as a means of becoming a highly efficient and effective utility with a focus
on continuous improvement. We protect public health and the environment in service to
our customers, to whom we aim to deliver the best value for their investment, while
maintaining our reputation of being safe and reliable. As our agency is in its 72nd year of
operation, much of our infrastructure is in need of replacement, and we consider each
task, no matter how small, an opportunity to identify ways to do our work better. This
fiscal year, we formalize this mindset with the launch of Central San's Optimizations
Program.
Objective for FY 2018-19
To inaugurate the Optimizations Program, which will identify and execute optimizations
to critical processes District wide, develop a mechanism to track progress, establish
executive oversight, and ingrain optimizations into the company culture as an everyday
mindset for all staff.
Structure
An Optimizations Tracking Log has been created for internal use. This log will track
optimizations that occur throughout the year and will serve as a centralized, running list
of all ongoing and planned optimizations District wide.
After the close of each fiscal year, each division manager will be asked to submit at least
one optimization planned to begin in the following fiscal year and meet the following
criteria:
• The initiative must be critical or important to the operation of the District.
• A team must be named to manage the project.
• Each Manager and Department Director is expected to be involved in the
development and implementation.
To ensure timely and successful outcome of all projects, the Management Analyst will
facilitate a quarterly progress review at Managers Forum. The Optimizations Steering
Committee, consisting of the Executive Team, will also meet as needed to support the
program.
At the end of each fiscal year, staff will provide an annual report to the Administration
Committee and full Board on the achievements and progress of the fiscal year, as well
as the optimizations planned for the next fiscal year. Presentations will also be made
periodically at departmental staff meetings.
November 15, 2018 Regular Board Meeting Agenda Packet- Page 169 of 254
11/06/18
FISCAL YEAR (FY) 2017-18
OPTIMIZATIONS ANNUAL REPORT
AND
PROGRAM PLAN
Board Meeting
November 15, 2018
Christina Gee
Management Analyst
FY 2017-18 ANNUAL REPORT
•Achievements and
• progress in
optimizations by
category
• Business Process
Y'
OPTIMIZATIONS Improvements
y ANNUAL REPORT
IN • Infrastructure
Upgrades
' � • Efficiencies
- r
August 2013— July 1, 2017— . On the Horizon
June 30, 2017 June 30, 2018 . Program formalization
• FY 2018-19
A�MARY
„„ TONsF
optimizations
z '
November 15, 2018 Regular Board Meeting Agenda Packet- Page 170 of 254
1
11/06/18
BUSINESS PROCESS IMPROVEMENTS
• Enhanced customer website
• App for visitor check-in and room scheduling
• Business process documentation and
readiness assessment
• Electronic timekeeping
• Work order ticketing systems
• Internal audit program
• Automatic vehicle location (AVL)
• Rod-storage rack `
L
ram for automatic creation of /
rground service alert(USA) locating
est work orders
3
INFRASTRUCTURE UPGRADES
• Headworks screening upgrades
• Vulnerability/Security Study rl+
• Core networking switch
replacement
• Don't Just Fix It; Improve It (DJFI)
• Optimization idea
• Failure before asset useful life
• Repeat failures showing up on Bad
Actors list
• Multiple reactive or corrective work
orders on high-criticality asset
• More than 1 reactive work orders with °
priority of 1 or 2 on specific asset
betwpreventative maintenance
J.een
4 �I
November 15, 2018 Regular Board Meeting Agenda Packet- Page 171 of 254
2
11/06/18
14 DJFIS COMPLETED
• Furnace No. 2 Center Shaft Drive
• Conduit at Primary Sedimentation Tank
• Split Collar Wrench
• Access Hatch
EFFICIENCIES
•Piloting wet scrubber technology
•Refinancing debt(total anticipated gross
interest savings through 2029)
•Negotiating rate decreases in benefits
costs
F9,71III
•Purchasing control systems hardware at
an early-bird rate
•Repairing two rodder assemblies in
house
•Submitting AVL data in lieu of smogging
vehicles
•Reusing recirculated oil for the clarifiers
CIENTRALSAN
6 '
November 15, 2018 Regular Board Meeting Agenda Packet- Page 172 of 254
3
11/06/18
FY 2017-18
ONGOING OPTIMIZATIONS
• New enterprise resource V
planning software
• Intranet replacement
• E-Builder® project management
information system
• CityWorks® refinement
• Uniform Public Construction
Cost Accounting Act
• Solids Handling Facility
Improvements
• Steam and Blower Replacement
OPTIMIZATIONS PROGRAM PLAN
• Structure
• Optimizations Tracking Log
• Quarterly progress review at Managers Forum
• Optimizations Steering Committee meetings as needed
• Annual reporting to Administration Committee and full Board
• Commitment to plan additional projects for next fiscal year
• Periodic departmental presentations
• Objectives
• Identify and execute optimizations to critical processes
District wide
• Develop a mechanism to track progress
• Establish executive oversight
• Ingrain optimizations into our culture as an everyday mindset
for all staff
8
November 15, 2018 Regular Board Meeting Agenda Packet- Page 173 of 254
4
11/06/18
FY 2018-19 PLANNED OPTIMIZATIONS
•Switch to CalPERS health
• Install video camera in Multipurpose Room
•Enhance performance evaluation system
•Link photos to assets in geographic information
system
•Replace Furnace No. 2 oxygen analyzer
• Evaluate vehicle fleet inventory
• Improve reliability of ultraviolet disinfection
basins
_ 1
CENTRALSAN
CONCLUSION
•Next steps
•Complete implementation of ongoing
FY 2017-18 optimizations
• Evaluate and/or fulfill planned FY 2018-19
optimizations
-Thank You
•Staff
•Division Managers
• Executive Team
•Board
10 '
CENTRALSAN
November 15, 2018 Regular Board Meeting Agenda Packet- Page 174 of 254
5
11/06/18
QUESTIONS?
CENTRALSAN
November 15, 2018 Regular Board Meeting Agenda Packet- Page 175 of 254
6