HomeMy WebLinkAbout05.a (Handout) ACEC Operations and Management Best Practices Presentation
Item 5.a.
(Handout)
ACEC C ALIFORNIA’S A NNUAL
S TRATEGIC S UMMIT, N APA, CA
O CTOBER 11, 2018
S ESSION#1 W ATER
C ENTRAL C ONTRA C OSTA S ANITARY
D ISTRICT
Jean-Marc Petit, P.E.
Director of Engineering and Technical
Services
A GENDA
Θ Who is Central San
Θ Good Management Practices: Strategic Plan
Θ Looking at the Future:
Θ Central San Comprehensive Wastewater Master Plan
Θ Updating Tools for Best Practices:
Θ Program Management Information System: PMIS -eBuilder
Θ Collection System Hydraulic Model: InfoWorks
Θ Collection System Risk Assessment and Management Tool: InfoMaster
Θ Computerized Maintenance Management System: CMMS City Works
Θ Geographic Information System: ESRI GIS
Θ Pipe Inspection Management Software: IT Pipes CCTV
Θ Active Applied Research Program
1
W HOIS C ENTRAL C ONTRA C OSTA S ANITARY D ISTRICT
(C ENTRAL S AN)
S AN F RANCISCO B AY A REA
2
S ERVICE A REA
C ENTRAL S AN T ODAY
Θ 145 sq. Mile Service Area
Θ 1,540 Mile Sewer System
Θ Our Headquarters, Board Room, and
Treatment Plant are in Martinez
Θ Collection System Operations are in
Walnut Creek
Θ Treat Flow from Concord and Clayton
by Contract
Plant:
•Treats an average of 32million
gallons a day (MGD)
•Plant rated for 53.4 MGD dry weather
and 270 MGD WW
•Produces 80%of Energy Needed
•20Years of Total Compliance with
NPDES Permit
•Produces 580Million Gallons of
Recycled Water Annually
3
O UR S ERVICES
Θ Wastewater
Collection
Θ Wastewater
Treatment
Θ Recycled Water
Services
Θ Household
Hazardous Waste
Collection
T REATMENT P LANT
4
H OUSE H OLD H AZARDOUS W ASTE
C OLLECTION-W HODOWESERVE?
5
W HATDOWETAKE?
C ENTRAL S AN’S
R ECYCLED W ATER P ROGRAM
(R ETAILAND W HOLESALE)
Θ The District also owns a
recycled water distribution
system called “Zone 1”.
Θ In 2017, the District sold
213.9 Million gallons of
recycled water.
Θ WWTP uses about 1.5
MGD of recycled water.
6
O UR A NNUAL B UDGET
G OOD M ANAGEMENT
P RACTICE
C ENTRAL S AN
S TRATEGIC P LAN
7
S TRATEGIC P LAN
8
L OOKINGATTHE F UTURE
C ENTRAL S AN
C OMPREHENSIVE
W ASTEWATER M ASTER P LAN
T HE C OMPREHENSIVE W ASTEWATER
M ASTER P LAN(CWMP)ISACRITICALLONG
RANGEPLANNINGDOCUMENTFOR
MAINTAININGAHIGHLEVELOFSERVICE,
ESTABLISHINGLONG-TERMFISCALLY
RESPONSIBLEPOLICIESFOROUR
CUSTOMERS,ANDPROVIDINGACLEAR
DIRECTIONFOR C ENTRAL S AN.
9
T HIS P ROJECT C OORDINATED S EVERAL
M AJOR M ASTER P LANNING E FFORTS
Dynamic
Collection
Treatment
Recycled
Collection
SystemMaster
PlantMaster
Water
System
Plan
Plan
Model
Comprehensive
Asset
WastewaterMaster
Management
Plan
T HE CWMP ISA C OMPREHENSIVE D OCUMENT
AssessedNearEvaluated
ReviewedPast
Term&FutureProcess/Energy
Reports
NeedsOptimizations
DeterminedEvaluated&
DevelopedNew
RegulatorySelected
Dynamic
ScenariosAlternatives
HydraulicModel
Developed
Evaluated
EvaluatedFlows
20Year
Process
&Loads
Comprehensive
Capacities
Plan
Prepared
PerformedEvaluated
Updated
ConditionHydraulic
AssessmentsCapacities
10YearCIP*
*CapitalImprovementPlan(CIP)
10
T HIS CWMP P ROVIDES C ENTRAL S ANWITH
A T OOLFORA C LEAR D IRECTION
ConfirmedfutureCIPProjects,EstimatedCosts,andSiteLayouts
ProvidesClaritytoCIPProjectInterDependencies&Priorities
CoordinatesProjectSchedules&Predesign/PilotingNeeds
ConfirmedO&M/EnergyManagementStrategiesΑ5ĻǝĻƌƚƦEnergy
Policy
AcceleratedConditionAssessments/ImplementAssetMgmt.Plan
AlignedwithStrategicGoals
CWMP M AJOR D RIVERS
DriversDescriptions
Maintainperformanceandreliabilityofexistingassetstoensure
1AgingInfrastructure
reliabletreatmentofwastewater
Increasecapacityandredundancyofexistingfacilitiesto
accommodatewastewaterflows(wetweather)andloads.
2Capacity
Projectsthatwouldberequiredtoaccommodateplanned
growtharenotincludedintheCIP.
Reliablycomplywithregulatoryrequirementsthataredesigned
toprotecthumanhealthandtheenvironment&Planfor
3Regulatory
anticipatedfutureregulatoryrequirements
Minimizelifecyclecosts,maximizebenefits,andachieve
economicstabilitythroughoptimization,resiliency,resource
4Sustainability
recovery,andenergyprojects
11
CWMP G OALSAND LOS
EnergyPolicyBP27
CWMP E XECUTIVE S UMMARIES
Public Outreach Summary
Technical Executive Summary
12
C OLLECTION S YSTEM
MASTER P LAN F INDINGS
AND R ECOMMENDATIONS
D ESCRIPTIONOF S EWER S YSTEM
Θ 145 square mile service area
Θ Large collection system
Θ Over 1,540 miles of gravity
sewers
Θ 37,000 pipe segments
Asset Value = >$2.9 Billion
Θ 31,000 manholes
Plastic
Θ Pipe Diameters: 4” –102”
$826M
Clay
Θ Oldest Pipe: 1913 (105 years old)
$888M
Θ Pipe Materials: Concrete, Clay,
Plastic, and Metal
Metallic
Concrete
$162M
$974M
Θ 19 Pumping Stations
Million (M)
13
S EWER R EPLACEMENTAND
R EHABILITATIONPROGRAM O VERVIEW
Optimized
System is Aging –
Rehabilitation &
Pipe Conditions
Replacement Forecast
range from Good to
Very Bad Condition
•Forecasted CIP:
–~$99Min 5 years
Θ 64% of pipes are
–~$720Min 20 years
< 50 years old
•Forecast will be
Θ CCTV’d 90% of pipes:
updated routinely for
Θ 2% -“Very Bad”
Developed Data-
CIP updates
Supported Risk Model
InfoMaster® to
Confirm Sewer Needs
Θ Uses ESRI backbone
Θ Uses LOF and COF to
calculate risk
Θ LOF based on District
CCTV and cleaning data
100-Y EAR S EWER R EHABILITATION&
R EPLACEMENT F ORECAST
PeriodCost($M)Mileage
05Years$99
38
510Years$180
42
1020Years$441
184
2030Years$724
281
3050Years$1,156
403
5075Years$575
206
75100Years$808
276
14
W ASTEWATER T REATMENT
P LANT M ASTER P LAN
F INDINGSAND
R ECOMMENDATIONS
O VERVIEWOF W ASTEWATER T REATMENT P LANT CWMP
I DENTIFIED N EEDS
15
M AJOR T REATMENT P LANT P ROJECTS O VERVIEW
BY P HASEAND D RIVERS
16
R ECOMMENDED C APITAL I MPROVEMENT P LAN
2017-2037
C APITAL I MPROVEMENT P LAN
17
P ROPOSED 10-Y EAR CIP
$873M OF I MPROVEMENTS I DENTIFIED
(InͷЉЉЉ)
Shownin2016DollarsFY17/18FY18/19FY19/20FY20/21FY21/22FY22/23FY23/24FY24/25FY25/26FY26/27
TreatmentPlant$18,045$18,707$50,502$48,611$46,182$56,523$51,636$23,375$34,950$37,392
SolidsImprovementsPhases2&3
$0$0$0$0$0$0$0$20,190$20,190$20,190
(Digesters+FBI)
CollectionSystem$18,492$17,180$35,752$38,000$39,440$36,759$38,293$41,739$41,985$45,703
RecycledWater$460$540$1,210$5,771$5,771$125$1,647$9,099$125$125
GeneralImprovements$4,277$2,912$3,456$1,943$3,298$4,173$1,798$2,798$1,798$2,570
CIPProgramContingency$1,500$1,500$2,000$2,000$2,000$2,000$2,000$2,000$2,000$2,000
TotalCIP$42,774$40,839$92,920$96,325$96,691$99,580$95,374$99,201$101,048$107,980
W ASTEWATER S UPPLYVS.
R ECYCLED W ATER D EMAND
18
R ECYCLED W ATER U SES
Treatment
SuisunBayDischarge
Plant
Brine
WaterExchangeProject
PlantFilterPlantAdvanced
Utility&Treatment
WaterClearwellFacilities
Martinez
Zone1
Refineries
Recycled
Water
Concord
ContraCostaWater
Reuse
District/SantaClara
Project
ValleyWaterDistrict
WaterExchange
W ATER D IVERSIONS
Treatment
SuisunBayDischarge
Plant
Brine
PlantFilterPlantAdvanced
Utility&Treatment
WaterClearwellFacilities
Martinez
Zone1
Refineries
Recycled
Water
DiabloOther
CountryDiversions?
Club
Diversion
Concord
ContraCostaWater
Reuse
District/SantaClara
Project
ValleyWaterDistrict
WaterExchange
19
C ENTRAL S AN, C ONTRA C OSTA W ATER
D ISTRICT& S ANTA C LARA V ALLEY W ATER
D ISTRICT E XCHANGE C ONCEPT
Martinez
Refineries
22TAFY
TransferBethany
Pipeline
(proposed)
22TAFY
CCWD
Expanded
LosVaqueros
*TAFY=thousandacrefeetperyear
C URRENT C OMMITMENTS
Θ Plant Utility Water
Θ Zone 1
Θ Concord Community Reuse Project (Naval
Weapon Station) –Will Serve Letter
Θ Diablo Country Club Satellite Water Recycling
Facility (SWRF Demonstration Project)
Memorandums of Understanding (MOUs):
Θ Moraga Country Club SWRF
Θ Water Exchange
Θ Board support letter in December 2017
Θ MOU with CCWD and SCVWD in development
20
W ATER A VAILABILITY C HALLENGES F OR
S UPPLYING W ATER T O F UTURE P ROJECTS
Title22
including
CHALLENGE
Concord
Flow
Community
Variability
ReuseProject
(CCRP)
CHALLENGE
Water
ReducedFlow
Exchange
from
(Refineries)
Diversions
U PDATING T OOLSFOR B EST P RACTICES:
1. P ROGRAM M ANAGEMENT I NFORMATION S YSTEM: PMIS -E B UILDER
2. C OLLECTION S YSTEM H YDRAULIC M ODEL: I NFO W ORKS
3. C OLLECTION S YSTEM R ISK A SSESSMENTAND M ANAGEMENT T OOL: I NFO M ASTER
4. C OMPUTERIZED M AINTENANCE M ANAGEMENT S YSTEM: CMMS C ITY W ORKS
5. G EOGRAPHIC I NFORMATION S YSTEM: ESRI GIS
6. P IPE I NSPECTION M ANAGEMENT S OFTWARE: IT P IPES CCTV
21
Asset Lifecycle
MaintainAcquire/
Dispose
Θ/ƚƒƦǒƷĻƩźǩĻķ
Maintenance
ΘtƩƚŭƩğƒ
Management
Management
System(CMMS)
Information
System(PMIS)
Operate
Θ{ǒƦĻƩǝźƭƚƩǤControland
DataAcquisition(SCADA)
system
Why Now?
Twoyearimplementationschedule
22
Existing Concerns
Θ Many projects in varied stages
Θ Too many spreadsheet duplications
Θ Reports are time consuming
Θ Communication between divisions and
departments
Θ Efficiency –Not everyone uses same tools
Θ Manual data entry and lots of paperwork
Θ Unable to get speedy project status snap
shots (% completion or financials)
Θ Difficult to determine encumbrances
Purpose
Θ The PMIS system will provide:
Θ Tools for program, project, and construction management
Θ Visibility into program and individual project performances
Θ Streamline project management functions and processes
Θ Interactively organize and report information about the projects
in the CIB, CIP, and 20-year planning horizon
Θ This will enable management to:
Θ Track program and project status
Θ View program performance on a continual basis
Θ Monitor work so that it is delivered on-time and on-budget
23
Users of Project Information
Capital
Projects
Division
OtherPlanning&
5źǝźƭźƚƓƭAsset
ProjectManagement
ManagersGroups
Program
Management
Information
System
Executive
Finance&
Management
Accounting
Team
Boardof
Directors
M OBILE
BringingeBuilderonthejobsite
®®
will savestimefortheconstruction
AppleiOS
and
managerandstaff
Android™
Θ View documents and workflows in the field
Θ Address or start action items
Θ Daily Inspection Reports with photos
Θ Take photos and attach to forms
Θ Redline PDF drawings and photos, as-builts
Θ Any e-Builder form can be mobile enabled
Θ View documents while offline
24
PMIS and ERP Schedules
FY201718FY201819
AugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDecJan
Phase1.ProgramTraining,Review,
ManagementAdoption
Phase2.ConfigPMTraining,Review,
&CMAdoption
Phase3.RollOutPMTraining&StartUp
&CM
PreliminaryERPSchedule
GFOANeeds
Assessment
ERPSelection&RFP
ERP Implementation 2-4 years
Integration with Financial System
(cloudbased)
(CCCSDFTPsite)
(CCCSDserver)
IntegrationconfiguredduringPhase1(ProgramManagement)
Onedirectionalintegrationonfivepoints:
1.Projects&contracts
2.Anychangesto(1)
3.Expenditures
4.Updatingtopaidstatus
5.Vendorslist
25
Rebuilding the GIS
Θ Replaced all desktop and web GIS systems with Esri
ArcGIS platform
Θ Migrated our GIS data into an industry-standard data
model
Θ Implemented data quality validation tools
rd
Θ Refreshed data from 3parties
Θ Standardized identification and naming for all assets
GIS-Centric Asset Management
Asset
RiskModel
HydraulicCapacity
Management
PrioritizedCapitalPlan
Model
ArcGIS
GeodatabasesandMapServices
CCTVInspection/
ConditionAssessment
EnterpriseResource
Document
PortalforArcGIS,Geocortex
Planning(ERP)
Management
•RecordDrawings
•Permitting
•CompletedPermits
•Accounting
•EasementDocuments
•LandUse
•AssetManagement
•Financial
Documents
•Landdevelopment
Information
26
Cityworks Replaces Accela& Mainsaver
Θ Relies on GIS for asset
registry
Θ Supports both horizontal
assets (sewer collection/water
distribution) and vertical
assets (treatment plants,
pumping stations, general
facilities)
Θ Web interface
Θ Mobile apps (iOS, Android)
Collection System Implementation Completion
Θ Collection System “go live” since late September 2016
Θ Data migration of historic sewer and fleet work orders
Θ PM schedules “seeded” and triggered
Θ Printed paper schedules/maps for October work orders
Θ 100% mobile since November
27
Cityworks in the Field -Collection Systems
Treatment Plant Implementation Ongoing
Θ Treatment Plant “Go Live” since late January 2017
Θ Maintenance shops use mixture of iPads and desktops to
access Cityworks
28
Cityworks for Treatment Plant
Cityworks/GIS Improves Information Access
29
ITpipes Replaces WinCan& Granite XP
Θ CSO using ITpipes since late February 2017
Θ All CSO inspections accessible on
Θ Will be migrating all historic Wincan& GraniteXPdata into
new ITpipes system
ITpipes in Action
30
Collection System Hydraulic Capacity Modeling
®®
Θ InnovyzeInfoWorks ICM
SE with ArcGIS
Θ Uses GIS collection system
piping network data and land
use data
Θ Supports the Comprehensive
Wastewater Master Plan
Θ Evaluate needs by new and
future developments
Risk Assessment and Capital Planning
®®
Θ InnovyzeInfoMaster
Θ Consumes data from various sources
Θ GIS asset data (including condition assessments)
Θ Cityworks maintenance history
Θ InfoWorkshydraulic model
Θ Other GIS reference data (soil types, nearby facilities)
Θ Calculates Business Risk Exposure (BRE) for assets
Θ When will assets need to be replaced?
Θ How much will replacement cost?
31
Calculating Risk for Collection System Assets
ProbabilityProbabilityConsequenceConsequenceBusinessBusinessRiskRisk
ofofFailureFailureofofFailureFailureExposureExposure
(POF)(POF)(COF)(COF)(BRE)(BRE)
ΘIźŭŷVelocitiesΘ/ğƦğĭźƷǤ
HydraulicHydraulicHydraulicHydraulic
RiskClassExampleCapitalAction
ModelModelModelModel
Θ.ƚƷƷƌĻƓĻĭƉƭΘ.ƌƚĭƉğŭĻƭΉhǝĻƩŅƌƚǞƭ
HighPriorityinCIP/YearlyOperational
GISGIS
Extreme
Θ!ŭĻΘIƚƭƦźƷğƌƭͲSchools,Etc.
Frequency
InfrastructureInfrastructureCriticalCriticalFacilitiesFacilities
ΘağƷĻƩźğƌΘLƓķǒƭƷƩǤ
DataData
StandardPriorityinCIP/Biannual
High
OperationalFrequency
Θ{ƚźƌTypeΘtƚƦǒƌğƷźƚƓDensity
GISGISReferenceReferenceGISGISReferenceReference
DataDataDataData LowPriorityinCIP/1in5Years
ΘwğźƌƩƚğķƭΉCğǒƌƷLinesΘ{ƷƩĻĻƷPaving
Medium
OperationalFrequency
ΘtźƦĻFailureHistoryΘƩğŅŅźĭDisruption
AMSAMS&&WorkWorkCommunityCommunity
Low1in10YearsOperationalFrequency
OrdersOrdersImpactsImpacts
ΘwĻƦğźƩƭΉ\[źƓźƓŭΘ/ƚƒƒǒƓźƷǤRelations
NegligibleWaitforaproblemtoarise
ΘtƩƚǣźƒźƷǤtocreeksand
DeteriorizationDeteriorizationEnvironmentalEnvironmental
ΘğƩźƚǒƭtechniques
ModelingModelingImpactsImpacts
waterbodies
Risk-Based, Long-Term Collection System
Capital Improvement Prioritization
PeriodCost($M)Mileage
05Years$9938
510Years$18042
1020Years$441
184
2030Years$724
281
3050Years$1,156
403
5075Years$575
206
75100Years$808
276
32
Active Applied
Research Program
at Central San
Recent Applied Research Efforts
ZeoliteAnammoxCentrifugeUltraviolet
PilotPilotTransmittance
Objectives:Evaluate Objectives:Testnew Objectives:Investigate
feasibilityformaintechnologyforhigherdecreasingUVTtrend&
streamnutrientremovaldewateredcakesolidsidentifyUVTofdifferent
Lead:Regulatory Lead:Operations/wastewaterstreams
ComplianceControlSystems Lead:Planning
33
Recent Applied Research Efforts
FilterCapacityCausticAdditionSludge
TestingPilotScreening
Objectives:Evaluate Objective:Determine Objectives:Remove
processcapacity&causticsystemdesignplasticsfromsludgeto
performanceofexistingcriteriaforscrubberpHreduceHClfurnace
filterplantcontrol&reduceHClemissions
Lead:Planningfurnaceemissions Lead:CapitalProjects
Lead:Regulatory
Compliance
Current Applied Research Efforts
WetScrubber/LimeSelector
AirPollutionReductionEvaluation/SRT
ControlPilotTestingControl
Objectives:Confirm Objectives:Reduce Objectives:Improve
performance&furnaceloading,secondarytreatment,
designcriteria,reduceoperations&moreconsistent
evaluateboilermaintenancecostssludgevolumeindex
bypassperformance(SVI),reducebulking,
&scrubberwaterincreasetreatment&
potentialimpactsfiltercapacity
34
A Look Ahead at Applied Research –
Possible Nutrient Removal Pilots
MembraneAeratedBioreactorsAerobicGranularSludge
•Enhancenutrientremovaltreatment•Innovativenutrientremovalprocessthat
capacityofexistingtanksreducesenergyneeds&doesnotrequire
•Possiblyreduceplantexpansionneedsexternalcarbonaddition
•Membranesinanaerobiczonedeliver•Sequencingbatchreactorsintegratedinto
oxygentoabiofilmattachedtotheexistingcontinuousflowreactors
membranesurface•Completingfeasibilityreportforpilot,
•Completingfeasibilityreportforpilotconsideringinteragencypilotoptions
A Look Ahead at Applied Research –
Solids Handling
WE&RFHYPOWERSProject
InnovativeBioEnergyProject
•Awarded$1.2MDOEgrantinDec.2016
•LedbyResourceRecoveryProgram
•Emerginghydrothermalresourcerecovery
Manager
process(convertswastewatersolidsto
•Reduceoperations&maintenancecosts,
biofuel,renewablegas,fertilizers,etc.)
strivefornetzeroenergyanddemonstrate
•Phase1:PilotPlanning/Design/Permitting
readinessofnewtechnology
•Phase2:3tonperdaypilot
•Solicitinterestedbioenergycompanies
•CollaborationwithWE&RF,PNNL,Genifuel,
interestedinpartnershipopportunitiesto
Merrick,Tesoro,MicroBioEngineering,
producerenewableenergyandprocessa
SoCalGas,UtilityAdvisoryPanel,&Others
portionofthewastewatersolids
35
A Look Ahead at Applied Research –
Collection System Inspections
ForceMainInspections
LargeDiameterPipeInspections
•Pressuretransientmonitoring,acoustic
•Cuttingedgeinspectiontechnologies
leakdetection,electromagnetic
(laserscanning,3DHDCameras,sonar,etc.)
•Over21milesofforcemainuptoЌЉͼ
•Over76milesoflargediametersewersfrom
diameter(concrete,ferrous,plasticpipe
ЋЍͼtoЊЉЋͼdiameter(mostlyreinforced
materials)
concretepipe,over50%are>50yearsold)
•Inspectionsprioritizedbycriticality
•Inspectionsprioritizedbyriskscore
•Updateconditionscores,investigate
•Updateconditionscores,investigate
corrosion,defects,etc.
corrosionandsediment,defects,etc.
A L OOK A HEADAT A PPLIED
R ESEARCH/P LANNING–S EWER M ODELS
ContinuetoPilot&Optimize
InfoMasterRiskModel
TestSmartManholeCovers
•Updatesewerdegradationmodel
•Monitorsurchargeinkeyareas
•Updatesewerreplacementplan
ofcollectionsystem
•Investigatesoftwareimprovements
•Investigate/validateInfoWorks
(e.g.newGISlayers)
modelpredictions
36
Thank you!
Jean-Marc Petit, P.E,
Director of Engineering and Technical
Services
Central Contra Costa Sanitary District
5019 Imhoff Pl.
Martinez, CA 94553
(925) 229-7112
jmpetit@centralsan.org
37