HomeMy WebLinkAbout4.b. Receive Fiscal Year 2017-18 Optimizations Annual Report and Optimizations Program Plan Page 1 of 39 Item 4.b. ,OrCCE TR L SAN CENTRAL CONTRA COSTA SANITARY DISTRICT November 6, 2018 TO: ADMINISTRATION COMMITTEE FROM: CHRISTINA GEE, MANAGEMENT ANALYST REVIEWED BY: ANN SASAKI, DEPUTY GENERAL MANAGER ROGER S. BAILEY GENERAL MANAGER SUBJECT: RECEIVE FISCAL YEAR 2017-18 OPTIMIZATIONS ANNUAL REPORTAND OPTIMIZATIONS PROGRAM PLAN Last November, the Board received a report of the optimizations completed or in progress since August 2013. This was an effort to capture all the achievements made by staff to strive beyond performing their regular duties, but to also improve upon them by applying human ingenuity, technology, and innovation. Since that report, Central San was recognized for its commitment to optimization through inauguration into the Leading Utilities of the World, a growing network of 37 of the world's most innovative water and wastewater agencies. Attached is the Fiscal Year 2017-18 Optimizations Annual Report(Attachment 1), which contains completed and in progress optimizations during the last fiscal year, as well as optimizations planned for FY 2018-19. The attached tri-fold brochure encapsulates the highlighted optimizations of FY 2017-18 (Attachment 2). As we continue in the spirit of efficiency, effectiveness, and continuous improvement, the Board has set forth as one of its FY 2018-19 goals for the General Manager to formalize an optimizations program at Central San.Attached is the Optimizations Program Plan (Attachment 3), which outlines the objectives and structure for the first year of Central San's new Optimizations Program. Strategic Plan Tie-In GOAL ONE:Provide Exceptional Customer Service Strategy 2- Foster employee engagement and interdepartmental collaboration, Strategy 3- Maintain a strong reputation in the community GOAL THREE:Be a Fiscally Sound and Effective Water Sector Utility Strategy 2- Manage costs GOAL FIVE:Maintain a Reliable Infrastructure Strategy 1 - Manage assets optimally throughout their lifecycle, Strategy 2- Facilitate longterm capital renewal and November 6, 2018 Regular ADMIN Committee Meeting Agenda Packet- Page 23 of 80 Page 2 of 39 replacement GOAL SIX:Embrace Technology, Innovation and Environmental Sustainability Strategy 2- Reduce reliance on non-renewable energy, Strategy 3- Encourage the review and testing of technology to optimize and modernize business operations ATTACHMENTS: 1. FY 2017-18 Optimizations Annual Report 2. FY 2017-18 Summary of Optimizations Tri-fold Brochure 3. Optimizations Program Plan 4. PowerPoint Presentation November 6, 2018 Regular ADMIN Committee Meeting Agenda Packet- Page 24 of 80 1 Page 3 of 39 L•1 1. a _ NMI MEW mom F AL a I, F i e d. i F a �k CENTRAL CONTRA COSTA SANITARY DISTRICT N FISCAL YEAR 2017-18 k � r m k OILi Ap 1 � 1 ° h , j , s TABLE OF CONTENT Page A SUMMARY O ACHIEVEMENTS AND PROGRESS 4 Through use of technology and ` g gy human ingenuity, each department has risen to the ABOUT ' challenge of continually finding n ew ways to i m p rove p rocesses, :r dq:?, Pr no matter how large or small. This report includes 40P optimizations completed between J u ly 1, 2017 and June 30, 2018. It also includes BUSINESS PROCESS - • . progress made on ongoing long-term optimization projects during that time. The optimizations have been categorized by their - e main objective or benefit to Central San. - a L F s+ - lir y � M. f I 7 ° v lip r _ .• EFFICIENCIE 1.W TV, A-Z e ON THE HORIZON 122 Y a { CONTINUOUS 1MPR0VEAA1 ,','of39 A MESSAGE FROM THE GENERAL MANAGER In November 2018, Central San was inducted into the Leading Utilities of the World, a global network of the most successful and innovative water and wastewater utilities. This honor recognized a commitment to optimization, which we have been doing for many years and which reflects our aspiration to be the best public agency. We know cost matters, and we are sensitive when it comes to the use of funds we collect from our customers and stakeholders. Through continuous improvement and increased productivity, we strive to do more with less as we tackle the challenges of aging infrastructure, tight public finances, regulatory requirements, and other challenges facing our organization. For the fifth consecutive year, we have maintained a relatively flat operations and maintenance (O&M) budget for the next fiscal year (FY). However, while we make the best use of our existing resources, some of our equipment is over 70 years old and no longer the best value for us and our customers. To maintain the highest level of service, in FY 2019-20, we will be investing more in our infrastructure, essentially doubling the budget of our Capital Improvement Program. To minimize financial impact to our ratepayers, we will review all aspects of our operations to streamline our processes, improve operational resilience, and improve effectiveness and efficiency. The optimizations in this report show the significant changes we have made toward self-improvement, cost cutting, and keeping our rates as low as possible, while maintaining a high level of service to our stakeholders. Best Regards, %AJ n ROGER S. BAILEY, GENERAL MANAGER DOGE 01 1 OgOUT CENTRAL SON OUR MISSION, VISION, Page 6 of 39 VALUES, AND GOALS MISSION ` To protect public health and the environment. VISION' To be ahigh-performance organization that provides exceptional service and regulatory compliance at responsible rates. • People 9 Principles • Community e Leadership and Commitment STRATEGIC GOALS 1. Provide Exceptional S. Maintain A Reliable Customer Service and Infrastructure Maintain An Excellent Reputation in The Community 6.Embrace Technology, Innovation, and 2. Strive to Meet Regulatory Environmental Sustainability Requirements 3. Be A Fiscally Responsible and Effective Wastewater Utility 4. Recruit, Develop, and Retain 100 % a Highly-Trained and Safe Workforce ACHIEVEMENT OF OUR STRATEGIC GOALS AND INITIATIVES IN FY 2017-18 PAGE 02 ABOUT CENTRAL SAN FY 2017-18 Page 7 of 39 STRATEGIC ACCOMPLISHMENTS CUSTOMER SERVICE • Hosted the third Central San Academy to educate 39 interested members of our public. • Celebrated the 20th Anniversary Household Hazardous Waste (HHW) Collection Facility and held a Collection Drive, serving 907 visitors - our highest participation week ever. ENVWONM • Achieved 20 consecutive years of total compliance with our wastewater discharge permit., - e Executed a memorandum of understanding with local water agencies to collaborate toward an innovative recycled water exchange to augment the region's water supply. • Increased collection of HHW by 7% (140,594 lbs.) and unwanted pharmaceuticals by 4% (729 lbs.). � 9 Reduced sanitary sewer overflows by 36%, from 39 to 25. n. • Continued to meet critical needs identified in our Comprehensive Wastewater Master Plan. • Installed approximately 10,000 feet of 18- to 24-inch trunk sewers as part of our Pleasant Hill-Grayson Trunk Sewer Project. PHYSICAL AND CYBER SECURITY • Received Municipal Information Systems Association of California Excellence in Information Technology (IT) Practices Award, as one of only four special districts to do so. � 9 Completed Security Assessment Master Plan. PAGE 03 ABOUT CENTRAL SAN ■ Page 8 of 39 CENTRAL SAN CENTRAL CONTRA COSTA Y, a SANITARY DISTRICT FEE; ABOUT US a Y: Central San is a special districtgoverned by a five-member Board of Directors, P who are elected by voters within the service area for four-year sta ered terms. staggered 182 - -square-mile service area Marti nez 290 ees budgeted full-time em toemployees Established in 1946Concord Plerasant Hill Clayton Headquartered in Martinez,CA _ Walnut Creek orinda Serving ftLafayee 488,900 customers Moraga and Oakland Danville ip 3,000 businesses Headquarters,Treatment Plant,H H Sart Ramon collection rec4lity 1,540 miles Of sewer pipelines ■ CoIlection Systemsste�s operation(Sewerer Maintenance) operated and maintained F—]Wastewater Co'Iecdon and Treatment- HHW Collection Wastewater Treatment and HH'► 44Mgallons of wastewater clletin HHW Collection my �NEENE=1 �Wes cleaned and disinfectedper day ` tea- r. $89.7M for O&M q'A5.3M for Capital Improvement P (CIP dow $5.6M for Debt Service0140, $0.9M for Self-Insurance •'4 O&M(54% • AIM A& CIP • 32% wy I 3 pounds 2M of hazardous waste 11per y ear collected and kept out of F landfills and year waterways each 12,500 pounds of unwanted drugs collected each year by our ' Pharmaceutical Collection Program 1: d rte• 11,140 visitors served at the Residential Recycled Water ` Fill Station yy'R S '� �F+x 9 e 3,AM students educated in Pollution prevention programs a BUSINESS PROCESS IMPROVEMENTS AlIr As we prepare for a major project to replace the enterprise resou��e 10 of 3s planning software at the foundation of our operations, we are identifying opportunities for efficiency within our business processes. The improvements made as a result of these efforts have made use of available technology, increased our predictability, and improved the sustainability of our operations. COMPLETED PROJECTS BUSINESS PROCESS DOCUMENTATION AND READINESS ASSESSMENT FOR ENTERPRISE RESOURCE PLANNING SOFTWARE With assistance from the Government Finance Officers Association (GFOA), staff analyzed and documented business processes from Accounting, Asset Management, Benefits, Budget, Community Development and Permitting, Customer Billing, Human Resources (HR), Payroll, Personnel Recruitment, Procure to Pay, Capital Projects Planning, Risk Management, Treasury, and Property and Land Management. We identified opportunities for improvement in workflow, which will be incorporated in our new enterprise resource planning (ERP) software. ELECTRONIC TIMEKEEPING IntelliTimeO is an automated time-reporting and leave-tracking tool that has eliminated paperwork in the timekeeping process. Employees have online access to their prior timesheets and accrual balances, and supervisors can see their workgroup's schedules at a glance. IntelliTimeO went live on duly 18, 2018 after testing on a pilot basis. This initiative required a significant investment from IT, end-users from different divisions who gave input in selecting the vendor, and all District staff who were trained on and support the use of the new program. ENHANCED CUSTOMER WEBSITE The new centralsan.org improves - �' AL SAN transparency and has the ease of use that customers have come to expect PROTECTINGIt from us. It minimizes the number of PUBLIC HEALTH clicks needed to find information and AND THEIL - incorporates social media posts to ENVIRONMENT refresh content. We used feedback from ARM M � staff, the Board, and the public with site _ statistics to determine what visitors J were most interested in seeing and how to best present that information. PAGE 06 1 BUSINESS PROCESS IMPROVEMENTS - COMPLETED ROOM SCHEDULING AND VISITOR CHECK-IN APP w P a g of 39 The TeemO app displays a conference room's schedule on a tablet mounted just outside the room. Using the tablet, employees can check the room availability and schedule a meeting directly on the device. More conference rooms will have � tablets equipped with this capability in p Y FY 2018-19. Using the same app, we now have aself-check-in tablet for visitors. Rather than signing a log book, -. visitors at the front desk now fill out their information on a tablet, which takes their picture and prints it directly onto a badge. Simultaneously, the app notifies our employees that their visitor �•` .���'�t has arrived via email and text. PURCHASING REQUISITION TICKET SYSTEM An electronic ticketing system was set up for Purchasing's internal customers to access their real-time requisitions statuses, as well as to fill out a customer satisfaction survey when their request is fulfilled. Purchasing will use the information to prioritize their workload and establish metrics to improve internal customer satisfaction levels. Because the Requisition Ticket System uses the same platform as IT's Helpdesk, there was no additional training needed. CONTROL SYSTEMS WORK ORDERS Our Control Systems group in the Plant now receives work orders through our computerized maintenance management system, Cityworks0. This allows them to manage their requests for improved ability to track their tasks, meet deadlines, and coordinate efforts with the maintenance shops. Their history of completed work orders will serve as a repository of problems and solutions, which will be useful for future troubleshooting and cost tracking related to Control Systems assets. There was no additional training needed since Cityworks0 is already used to track Plant and Collection System Operations (CSO) maintenance work. INTERNAL AUDIT PROGRAM ESTABLISHMENT Central San developed a program to conduct internal audits on a limited number of high-risk functions annually. In FY 2017-18, its first year, we completed internal audits in payroll, petty cash, and procurement cards with the help of a contracted internal auditor. Suggested improvements have been made to the audited processes to improve efficiency and controls. PAGE 07 BUSINESS PROCESS IMPROVEMENTS - COMPLETED DOCUSIGNO Docusign0 software for electronic signatures was piloted by one workgrourajkiis- of 39 year. During the pilot, staff realized savings in faster document processing and reduced paperwork; thus, Central San has made licenses and training available to other divisions such as Purchasing and Human Resources for potential future use. AUTOMATIC VEHICLE LOCATION Following a pilot in July 2017, Verizon's NetworkFleetO is now fully operational. This automatic vehicle location (AVL) program improves the ability for CSO to efficiently dispatch field crews to work sites based on locality, identifies locations for field site inspections, reduces - response time to emergencies, and reduces fuel - consumption. Staff is using the vehicle diagnostic reports to set benchmarks and create proactive maintenance plans, which will help control repair costs and reduce downtime. SIG SMART@ Central San also implemented Dig SmartO, which automatically creates a work order in our computerized maintenance management system, Cityworks0, for the approximately 20 Underground Service Alert (USA) locating requests received by CSO every day. In the past, we would have to manually create these work orders one by one from a Microsoft ExcelO spreadsheet. Dig SmartO reduces the time spent creating work orders and ensures accuracy of input into Cityworks0. ROD-STORAGE RACK To perform maintenance on a rodding truck, staff must remove a heavy coil of metal from the truck to access the equipment. Staff would do this 10 miles away from the Vehicle Shop, p at the treatment plant, where there is room to uncoil the many yards of rodding. This year, staff devised a way to repair the vehicle "in house" at the CSO yard. For each repair, staff now disassembles the rodding cage and uncoils the rod onto an empty reel which was manu- factured in the CSO yard. This saves staff travel time and makes the process of repairing the truck less cumbersome. MAINTENANCE HOTLINE A phone extension was set up for Plant Maintenance staff to efficiently communicate with each other by leaving voicemails regarding callouts, defect eliminations, and other ideas to improve preventative maintenance efforts. The voicemails are automatically emailed to the Plant Maintenance Division Manager and Superintendent. PAGE 08 1 BUSINESS PROCESS IMPROVEMENTS - COMPLETED MECHANICAL SHOP REORGANIZATION The Mechanical Shop's floor plan has been improved by relocating work-table-mounted Page 13 of 39 grinders and wire wheels to the welding l•> area and consolidating nuts and bolts shelving into proper storage cabinets with � � bins, thus opening space to create an area reserved for disassembled equipment awaiting parts that had once cluttered the shop work area and tables. Also, the grinder has been relocated to keep the "dirty work" in the already dirty welding area. = r OTHER COMPLETED OPTIMIZATIONS • Modified the Signature Authority Matrix to be less complicated, easier to read, and more in line with other agencies'. • Established a new investment account at the County for improved tracking and segregation of funds, as well as better analysis of the adequacy of the reserve fund. • Began live-streaming Board meetings to the lobby and on web-accessible devices, allowing employees to queue up the part of the meeting of interest in place of attending the meetings. • Installed smartboards and cameras into conference rooms for improved meeting capabilities, including facilitation of remote interviews and meetings. • Implemented Microsoft Office0 365 cloud tools including Office, Skype for Business, Microsoft OneDrive, SharePoint, and others. • Replaced old reports done through our enterprise resource planning software with more than 20 new and improved business and financial reports, which are clearer to read and easier to produce. • Outfitted Treatment Plant staff with tablets to provide them with mobile access to work orders, schematics, and other data. • Simplified the Purchasing requisition approval process by establishing authorization levels based on supervisory position criteria, reducing the number of approval levels from 18 to 3. • Began scoring Request for Proposals (RFPs) online using BidSyncO, replacing a manual, labor-intensive process with a streamlined and fully automated process which includes the ability to create reports to substantiate the evaluation committee's recommendation for award. • Created online access to safety data sheets through MSDSonline.com. • Started using iAuditor application to allow safety inspections to be conducted via cellphone or tablet. • Updated and serialized Safety Directive Manuals and instituted paperless online access. PAGE 09 BUSINESS PROCESS IMPROVEMENTS - COMPLETED ONGOING PROJECTS ERP SOFTWARE REPLACEMENT Page 14 of 39 SunGard HTEO has been Central San's ERP software since 1993. This foundational system manages the data for critical business processes, including Human Resources, Procurement, Accounting, Billing, and related subsystems. At first, staff had planned to perform targeted improvements to extend the life of the software, but when those improvements did not resolve the limitations staff was encountering, the decision was made to replace Su nGa rd0 completely. After extensive planning to ensure adequate staff resources, change management, and high-level support, we issued an RFP in May using a detailed list of 1,700 system requirements to ensure that responding vendors can meet all our business requirements. Following vendor selection, implementation is scheduled to begin in early 2019. Staff is now considering staffing augmentation needs to allow current employees to continue doing their daily work in addition to setting up the ERP and learning how to use it. INTRANET REPLACEMENT MM The current platform for the Online Total I nfor- ��� A ' pr..R, NSI 9ftl"'8 havii b417 eh.W4 H+�ti M i 1p w rwu ri nr•i,y I?AJq rla Ai!4.9 + F-r&. 7;li"w,I Ar,na.,anct-tnu V6i w t.alrra+p m a t i o n System (OTIS) and Plant Information I.�1,4. in WT[W lu br4hvrvr7 O NiTiLl PrW%nffz"C d.r 11 0110hJ rl ha.ilr10snrnlmd a ra J.F c 4AN t&1%A%V_ ++.trr System Fpr'arnr inw%rl Lrq+mknl wit Mal tarC wA A uUl rhr � � ��' `' $3�- �� #Mana Management (PIMS) intranets are out- Tikri Twn� rp Sull kku dated, have slow , response times do not function " ' p on mobile devices, and are difficult to �fl, properly �, keep updated. The new intranets will allow staff � pl.o7#rb r&'m.34 i.*d VPMIakr.Trugpn A Itir p?nr r1 14`lydiK" r,F[ to easily access the policies, procedures, training3 manuals and videos, and other data on the sites. +BPS A selection committee of employees received ; demonstrations from multiple vendors, and Digital De to ment®, which was also used to update ourmpmme ' �r'`'�'1d pJ p mrKh i 5w &I�i WIC,t F.*ertie i #�Wfh!rgR-1Ri.ht-wy_q r.1t a Fuf4 externa I customer website, is currently working with staff "v,%and j. v ftod to complete the project. I uv&m � �� ? S�+4iT�� errrwrl .Ir rmft r' 1e►1 IST VW RISK INVENTORY In summer 2017, managers identified business areas presenting inherent risks which may require management and further attention. Those 70 risks, now in an inventory, are being evaluated for existing and planned risk mitigation measures, quantifying inherent and residual risk levels, and in consideration of the development of an enterprise risk management program, where risks are centrally monitored, mitigation measures are tracked, and reports can be made periodically to the Board. DIGITAL PROJECT PLAN REVIEW Permit Counter staff and Development Services inspectors are in the process of piloting new paperless technology with City of Walnut Creek staff that would allow engineering project plans to be reviewed and inspected digitally. PAGE 10 1 BUSINESS PROCESS IMPROVEMENTS - ONGOING AUTOMATED SLUDGE RETENTION TIME CONTROL Consistent sludge retention time (SRT) has the potential to improve settliPaje 15 of 39 which improves effluent quality, plant capacity, filter plant operation, and dissolved air flotation operation. To help maintain consistent SRT, an automated controls system was installed to continuously monitor and adjust the activated-sludge process. Before this change, Operators received the sludge age data once a day and manually made adjustments. The control software was tested in late 2017 and will go live in late 2018. PROJECT MANAGEMENT INFORMATION SYSTEM (PMIS) Asset Management staff began implementation of e-Builder0 to track scheduling and cash flow of engineering projects. It will alleviate repetitive, manual data entry that is inefficient and time consuming and will be able to create reports quickly. Beta teams are currently testing e-Builder0. Training and rollout to all Capital Projects staff is scheduled for January to April 2019, with the goal of full adoption by July 2019. PIPELINE CLEANING SCHEDULES CSO continues to optimize cleaning schedules by com- bining workorders geographically to minimize visits to the same vicinity, which decreases drive time -between job sites and increases productivity. Part of this effort is to convert approximately 23,000 lines of "routine" work orders into "scheduled" work orders, so each pipe will have a scheduled date for cleaning, and staff will be able to better manage the crews' work schedules and reduce overdue cleaning work orders. REFINING USE OF CITYWORKSO We continue to refine our use of =� y. CityWorksO at CSO by adding custom _ templates to better automate the . � internal reporting process. _ Staff also collaborated to troubleshoot weak data signals to our crews' field WINNER tablets. We recently installed an upgrade CityWorksO Excellence in to the CityWorksO mobile app for the Departmental Practice Award, added ability to cache maps. Crews can recognizing exemplary users who now access and enter information in the use CityWorksO creatively and field by using the pre-loaded maps on contribute to the continued their tablets, which syncs to the cloud. improvement of the platform. PAGE 11 1 BUSINESS PROCESS IMPROVEMENTS - ONGOING INFRASTRUCTURE UPGRADES Through responsible and robust maintenance practicSggV 6 of 39 have extended much of our infrastructure - orig inally built in t the 1970's - well beyond its typical useful life. Therefore, we completed several optimizations this year to upgrade our equipment for reliability, safety, and compliance with current and future regulations. COMPLETED PROJECTS � , HEADWORKS SCREENING UPGRADES r� Our Headworks Facility is the first stage of our complex treatment process and removes inorganics from the wastewater stream to protect and reduce - wear on the downstream process equipment. To improve performance at this important step, as part of the planned CIP, we installed new bar screens, rehabi- litated two standby screens, and added new odor control ducts and gas detection equipment. The enclosed design connects to the odor control system, which will assist with Health Risk Assessment compliance. Overall, the project was a success with a very good rate of removal at an average of 23 tons of materials being collected monthly. We have 1� also seen less plugging downstream and reduced � the need to clean the ultraviolet lamps at the end stage of treatment. ENHANCEMENwr TO LUBRICATION PROGRAM All Plant Maintenance staff uses oil and grease in their work, so it is important to have an efficient system . in place for staff to have easy access to lubrication. Staff inventoried the grease guns and zerk fittings �- in the Mechanical Shop, assigned color codes, and distributed a chart to all Maintenance staff to help them easily identify the lubrication equipment by �c ��;,� u+ sight. This was a small investment to guard against ,N possible cross-contamination of grease and save staff � _�w-- time in being able to quickly identify the greases by �.�.._ color. PAGE 12 INFRASTRUCTURE UPGRADES - COMPLETED VULNERABILITY/SECURITY STUDY This was amulti-departmental effort to evaluate District-wide vulnerabilitiefge 17 of 39 and physical security improvements, including taking natural hazards like earthquakes and flooding into consideration. In FY 2017-18, staff evaluated 20 facilities and completed the study. A Security Coordination Committee has been formed to implement the recommended improvements in phases and develop recommended policies and programs. PROXIMITY SWITCH PILOT AT PRIMARY SEDIMENTATION TANK A proximity switch was installed at the Long Flight Collector #3 gearbox as a pilot to replace the mechanical limit switch. The mechanical limit switch was used to stop the motor if the chain binds up but was vulnerable to the corrosive environment. If the pilot succeeds, the proximity switch will be installed in all 4 long flight collectors when the tanks are down for maintenance in 2019. LONG FLIGHT COLLECTOR MONITORING SYSTEM. A programmable logic controller (PLC) was installed to monitor normal operation in the sedimentation tank flights. The system includes a pivot arm stationed on each of the drive shafts, which protects flights from damage caused by a broken chain, �w skipped chain, or damaged flights. The PLC can sense when a flight is broken, so it can 1) shut off the drive motor to . = ,, � rT R R R prevent further damage to the flights � or chain and 2) alert Operators with w q M local and remote alarms. HYDRAULIC IRON WORKER The Mechanical Shop now has a Hydraulic Iron Worker to fabricate small brackets, guards, pipe stands, -- racks, and custom tooling for around the plant, since manual fabrication methods are labor intensive. With this equipment, we now have the i _55 ability to shear instead of saw, punch instead of drill, cope and notch parts instead of torching, � and to grind and drill by hand. This also eliminates a substantial amount of environmental hazards,, such as fumes from a cutting torch and atmospheric particulates from grinding. -� PAGE 13 INFRASTRUCTURE UPGRADES - COMPLETED DON'T JUST FIX IT; �4 IMPROVE IT Page 18 of 39 Our Plant Maintenance staff is constantly rehabilitating our assets to extend their useful life and optimize their performance, going beyond simply performing the preventive maintenance (PM) or repair, but also asking what i4 more can be done. Work is categorized as a "Don't Just Fix It; Improve It" (DJFI) in the following situations: Proposal of an optimization idea • Failure before an asset's useful life Repeat failures showing on the Bad Actors list � AV * Multiple reactive or corrective *pool, work orders on ahigh-criticality asset More than 1 reactive work order with a priority of 1 or 2 on specific asset between PM tasks. In total, 14 DJFls were completed in FY 2017-18, including those on the following.0 - -10� milk ih WINNER 2018 Uptime Award for Best Reliability Engineering for Maintenance Program recognizing excellence and leadership in reliability and asset PAGE 14 INFRASTRUCTURE management. t1Dc:Qnn1=c - cnnnDi I=rFn nIF:11-q FURNACE NO. ? CENTER SHAFT DRIVE The old center shaft drive in our Multiple Hearth Page 19 of 39 Furnace No. 2 had multiple issues. Its replacement sparts were no longer available for purchase, and the hoses and hydraulic fluid were maintenance and failure points that could be removed with an updated design. Thus, a new design, involving an electric motor directly driving the gearbox, was - constructed, and a variable frequency drive now controls the speed of the motor,which was not possible before. The new design not only reduces the possibility of failure, but also allows for easier maintenance and more system control. REPLACED CONDUIT AT PRIMARY SEDIMENTATION SANK Staff replaced a fiberglass conduit which was installed as a pilot with stainless steel rigid.The old conduit allowed water to drain into motors and other devices, causing water intrusion damage or shock hazard. The new conduit resolved the safety hazard and improves the reliability of the equipment. SPLIT COLLAR WREN" Disassembly of the boiler feed pump nut sleeves was a constant challenge, as the wrench that was prefabricated for use was not properly designed. Staff machined a wrench from a split collar for the ability to apply greater torque. This made the disassembly task easier; reducing downtime, man hours, and components; and eliminating the risk of damage to the nut sleeve. This worked so well that staff is now designing a split collar wrench for the shaft as well. ACCESS HATS A hatch was created for easier and safer access to a three-way valve at the pre-aeration basin. Prior to its installation, to reach the valve, Operators had to remove a panel and railing and perform a confined space entry, which took 2-3 hours. PAGE 15 INFRASTRUCTURE UPGRADES - COMPLETED DJFIS m� ETHER COMPLETED DJFIS • Modified the shear hub for South Clarifier No. 3's gearbox by adding a grebNg2oof3s port to lube the hub, reducing the risk of a back injury for staff. • Modified and rebuilt the long flight shear hubs at the primary sedimentation tank, simplifying operations by taking the guesswork out of installing the pin by adding a stop in the correct position. • Added a manual blowdown feature for the cogeneration (cogen) differential pressure by installing piping testing/maintenance configuration to better maintain and increase uptime of equipment. This creates the ability to remove any possibility of condensation or plugging in impulse lines without powering down the cogen or the possibility of cogen falling offline due to a false reading. OTHER COMPLETED OPTIMIZATIONS • Replaced core networking switch to provide automatic redundancy through built-in failover mechanisms and a higher level of reliability of data delivery for every device with access to the network. • Expanded network monitoring tools to proactively notify IT staff of outages. • Installed shaft grounding rings on certain motors to minimize premature motor bearing failure. • Designed and fabricated a weir basin for the pH probes for the wet scrubbers. • Designed and fabricated ajib-style lifting device to facilitate removal of clarifier shear hubs to increase task efficiency and effectiveness. • Modified auto-lubrication systems: a lid in the furnace for ease of refilling, ports and pumps for additional lubrication areas, and installed an auto- lubrication system on the induced draft fans to protect the split bearings. • Designed, fabricated and installed new grit chutes with a smooth transition from a square port to a round flange, eliminating clogging up the grit washer conveyor. • Improved resiliency against the ultraviolet (UV) disinfection bypass events by installing shutdown-delay timers and enhancing the outlet gate logic. • Piloted sludge blanket detectors in the primary sedimentation basins and secondary clarifiers. • Transitioned control of the induced draft fan from an obsolete local controller into the modern furnace PLC. r • Enhanced furnace oxygen control by improving automatic rate control of the air ports for Hearth No. 10. ` • Implemented cogeneration British thermal unit control to save energy and simplify operation. • Streamlined and cleaned DynacO historian server to relieve storage space. PAGE 16 INFRASTRUCTURE UPGRADES - COMPLETED ONGOING PROJECTS SECURITY DRONE Page 21 of 39 Central San has contracted with an aerial security vendor, Aptonomy0, to fly a drone around the property to supplement security personnel. The drone will be able to access and patrol areas quickly and easily. This project is currently pending Federal Aviation Administration approval. STEAM AND BLOWER REPLACEMENT PROJECT The current steam system is complex and aging. It requires significant maintenance and has the potential to perform more energy recovery. One of the issues is that the blowers do not operate reliably in parallel with the electric blower. 'r.am:. Secondly, while they are sized for peak air demands, the blowers do not have adequate turndown for low-air- ZZZXJ6' demand conditions, which triggers use of the air waste � valve. Thirdly, the electric blower is a backup for emergen- cies but is undersized for the full range of air demands, so there is no redundant second electric blower. The Steam and Blower Replacement Project, in the works as part of the planned CIP, aims to assess the condition and remaining useful life of the existing boiler feedwater, steam, and aeration systems as well as associated structural, electrical, and instrumentation and control systems. It will also confirm the best energy recovery and aeration system replacement alternative that addresses both current and future needs. The new equipment will be flexible and optimal for addressing potential future permit requirements for nutrient removal and supporting collaborative efforts to expand the use of recycled water such as the Refinery Recycled Water Exchange. PORTABLE LOAD BANK Pumping Stations recently purchased a portable pocket load bank for testing fixed and portable generators to verify " operation under load. This unit will be used at the Concord Industrial, Clyde, Acacia, Flush-Kleen, and Crossroads Pum- �wH�NN ping Stations. The load banks will improve our existing Lin maintenance program with standby power by being able to use a portable device for routine maintenance and troubleshooting. The load banks will also be used on the two generators that have particulate filters. Getting the particulate filters � hot enough will theoretically yield a good burn off, which will reduce the number of times they will need to be sent out for cleaning. PAGE 17 INFRASTRUCTURE UPGRADES - ONGOING EFFICIENCIES Pa As we look to double our capital program budget nexfge 22 of 39 year and continue in our fifth year of keeping our O&M budget flat, we have implemented efficiencies to manage and reduce costs without sacrificing the high level of service our customers expect from us. COMPLETED PROJECTS WET SCRUBBER PILON One of our most significant endeavors was a wet scrubber ��4- pilot, which confirmed a new ` E technology's performance and ' � ' . ' ��{• design criteria for reliable compliance with current and y„ potential emission requirements. Staff from across multiple departments collaborated on this successful WINNER project, whose findings resulted in an estimated San Francisco Bay Area and statewide savings of$14M for our ongoing California Water Environment Association Solids Handling Facilities (CWEA) Engineering and Research Improvement Project. Research Achievement of the Year Award OTHER COMPLETED OPTIMIZATIONS • Refinanced debt to save approximately $8.2M through 2029 on gross interest costs, compared to the interest payments on the old bonds, while maintaining the same overall term of the debt. • Negotiated rate decreases to save $297,130 in benefits costs through medical and dental providers. • Saved $50,000 by purchasing plant control systems hardware for the Input/Output Replacement Project at a discounted rate. • Repaired two rodder assemblies in-house at C50, which reduced the downtime for the vehicle from 4 weeks to 2 weeks per truck and saved about $8,000 per truck in mechanics' fees. In total, for two rodders, we saved $16,000 and one month of downtime for the truck. • Enrolled in the Bureau of Automotive Repairs Smog Program to have our smog requirement waived by sending in the data from our AVL program. This saves us $9,300 per year on smog costs for our 83 vehicles and staff time spent taking the vehicles to get smogged. PAGE 18 1 EFFICIENCIES - COMPLETED • Added a decanting and filtration system to the hot oil re-circulation machine to save and reuse re-circulated oil, saving about $2,600 this year on the tN§e6pf 39 new oil for the clarifiers. • Continued to recirculate oil from furnace center shaft gearboxes and dissolved air flotation gearboxes. ONGOING PROJECTS LIME REDUCTION TESTING , Lime is added to the sludge in the Sludge Blending Tank before incineration to help condition the sludge for optimal dewatering in the furnace. Reducing the amount of lime added would have the potential to save hundreds of thousands of •` �-, ' � �;' dollars per year in chemical costs and relieve capacity in the furnace. :• Therefore, an ongoing collaborative effort across multiple departments has been ongoing to test the effects of reducing lime, including whether it will � cause ash melting in the furnaces. The first phase, bench-scale testing, was completed in FY 2016-17. The second phase, full-scale testing, was postponed until after the furnace burner and burner control are upgraded. � SODIUM HYPOCHLORITE USAGE FOR #3 WATER Before the UV systems were constructed and placed into service around 1998, the tertiary-treated (#3) water was secondary-treated water without any disinfection. It was not until after the UV system was implemented that Central San started adding sodium hypochlorite (bleach) to the high and low #3 water. Identifying the ability to reduce or eliminate the use of bleach in this instance as a potential efficiency, staff sought input from multiple divisions, tested samples, and gathered data. Staff confirmed that there is not a chlorine residual requirement for in-plant water use within our National Pollutant Discharge Elimination System Permit, and the #3 water for on-site use is a Title 22 exemption we provide for ourselves. Thus, Central San could either eliminate sodium hypochlorite feed to the high and low pressure #3 water or significantly reduce the current amount used by as much as 50%. While there is not a capital cost associated with elimination, there is a capital cost with reduction that has a payback of approximately eight months. Plant Operations staff is working with Capital Projects to potentially carry out this optimization the future. PAGE 19 1 EFFICIENCIES - COMPLETED SOLIDS HANDLING FACILITY IMPROVEMENTS 24 The Solids Conditioning Building was built Wt in the mid-1970's and has four levels. As part of the planned CIP, the project to improve � „t 14 � the facilities addresses regulatory drivers with new air emission control equipment, improves employee safety with seismic improvements, increases resiliency, and - replaces aging equipment. MOP "I Some of the components will optimize operations and result in lower O&M costs by reducing chemical, electrical, maintenance repair, and/or fuel expenses, including the following: Av- • New sludge blending tanks sized for better mixing of primary sludge and thickened waste activated sludge, improving sludge dewaterability. • New polymer system, high-efficiency centrifuges, and cake pumps for increased reliability and more cake solids using less polymer, requiring less fuel for the furnace. • New burners, controls, and combustion air blower system for the furnace, improving air emission (lower nitric oxides) with less fuel. • New wet scrubbers, multiple hearth furnace emergency bypass, and ash slurry drain system with potential future treatment to reduce metals to ensure compliance with both existing and expected regulatory requirements. • New wet ash loadout system, wet ash collection system, and ash slurry pump system to create less dust for increased employee safety. MIEV PAGE 20 EFFICIENCIES - COMPLETED IMPROVE SLUDGE PROCESSING BY OPTIMIZING SELECTOR �'4'_;-• age 25 of 39 A good selector improves the performance of the secondary treatment process, hopefully resulting in a more consistent sludge volume - - index, reduction in bulking, and an increase in treatment and filter capacity, with the ultimate goal of achieving the wet weather capacity J1 needed using existing infrastructure through improved performance. If successful, the ongoing selector optimization, related to the Automated Sludge Retention Control optimization on page 11, could help avoid over $10M of future capital improvements needs for another secondary clarifier for reliable peak wet weather capacity. Testing, currently in progress, will need to be conducted on a long-term basis to acquire reliable results for determining next step optimization actions. ADOPTION OF UNIFORM PUBLIC CONSTRUCTION COST ACCOUNTING ACT (UPCCAA) In May 2018, the Board adopted the UPCCAA to be effective September 1, 2018. With the UPCCAA, Central San can use informal bidding procedures for construction contracts of$45,001 to $175,000. For simpler, lower-cost projects, this has the potential to significantly reduce the administrative costs of bidding and allow for faster project completion, while retaining a competitive process and containing project costs. REPLACE EXISTING LIGHTING WITH LED LIGHTS A significant, District-wide effort was been initiated to upgrade high-intensity and other energy-inefficient lights to LED fixtures to save energy and maintenance costs. This has been going on for a few years, and, this year, the lights in the HHW Collection Facility sorting area, the high bay lighting in the Standby Power Building, and the Headworks Pump Room were all been replaced. PAGE 21 1 EFFICIENCIES - COMPLETED ON THE HORIZON Page 26 of 39 FORMALIZATION OF OPTIMIZATIONS PROGRAM This fiscal year, we created a structure for our optimizations program which tracks progress, establishes executive oversight, and ingrains optimizations into the company culture as an everyday mindset. Each division has identified at least one critical process to consider optimizing in FY 2018-19, listed below. OPTIMIZATIONS CONSIDERED TO BEGIN 1=v 2018-19 As we move into the 2018-19 fiscal year, staff will continue to work on the ongoing optimizations projects from FY 2017-18, including significant District- wide efforts such as the replacement of our ERP software, adoption of the UPCCAA, and use of the PMIS, in addition to the following: • Install permanent cameras in the Multipurpose Room to record training sessions, special presentations, Board workshops, Central San Academy, and other events. This will reduce staff time to record videos, eliminate the potential safety hazards of cords running along the ground, and broaden the possibilities for video recording in the room. • Enhance our performance evaluation system to make the process less cumbersome and emphasize the delivery of meaningful feedback. • Switch to CaIPERS health for more cost-effective employee and retiree healthcare plans, which will provide the same coverage at a reduced cost to Central San through membership in a larger risk pool. • Adopt unified communication tools across mobile and desktop phone systems to possibly reduce the number of telephone licenses and hardware. This will also streamline Emergency Operations Center activities by simplifying the establishment of a live phone line. • Increase staffing versatility and improve efficiency at the HHW Collection Facility by adjusting the contracted staffing levels. A� PAGE 22 ON THE HORIZON • Develop a system for Board Policies and Administrative Procedures Page 27 of 39 management, including a standardized file folder structure, comprehensive tracking log, and biennial administrative procedure review process to coincide with related the related Board Policies. • Link photos to assets in our geographic information system, so staff can better identify what and where specific pieces of equipment are within the treatment plant. • Analyze the results of the AVL program to identify any vehicles that could potentially be decommissioned with minimal impact to staff. • Implement various testing programs to avoid equipment downtime, increase reliability, and increase effectiveness, including breaker/overload testing to protect circuits from damage, active electric motor testing / troubleshooting, and ultrasound testing programs for bearing testing / re-greasing and energy savings. • Replace the Furnace No. 2 oxygen analyzer, which often becomes clogged with fine furnace ash, with a new analyzer that is more robust and will not need the same amount of maintenance. Staff will perform side-by-side oxygen testing on the new analyzer, then complete a Relative Accuracy Test per regulatory requirements to certify the new oxygen analyzer as a compliance monitoring instrument. • Establish valve exercising program to ensure that valves do not stop functioning due to lack of use, to avoid unforeseen delays in capital projects. • Install grit washer auger exercise timer to operate auger briefly but on a fixed schedule. This prevents grit drying out inside the equipment and causing current overloads on the auger motor. OR 1W/ • Improve reliability of the UV disinfection basins by replacing obsolete control hardware, pilot testing on low transmittance, and coordinating with the Capital Improvement Program to eventually replace the UV system with a new one with variable power controls. PAGE 23 ON THE HORIZON ACKNOWLEDGEMENTS, - Page 28 of 39 , e s r c _ r , - Central San is made of a diversegroup oemf to ees with va in skiIIs and employees varying duties,yet we have found o ortunities too timize Processes across our PP P organization and will continue to do so as we move into FY 2018-19. Committingg tooptimize often means changing our past practices or routines, and, at times, it also g requires a significant amount of work to launch and maintain. We areratefu I to have staff who recognize ize the importance orta nce of layingthis g g P for long-termgroundwork success. None of the accomplishments in this report would be possible without the hard work, ingenuity, and collaboration of our staff; the oversight of our managers g and executives; and the support of our Board of Directors. AL Y F i. r j6; r/ K - 1. � IN f :_ Ir '-_ v kk ACRONYMSPage 29 of 39 FOUND IN THIS DOCUMENT Ew*~. -win • AVL - Automatic Vehicle Location • CIP - Capital Improvement Program • CSO - Collection System Operations • DJFI - Don't Just Fix It; Improve It • ERP - Enterprise Resource Planning • FY - Fiscal Year • HHW - Household Hazardous Waste • IT - Information Technology • O&M - Operations and Maintenance • PLC - Programmable Logic Controller • PM - Preventative Maintenance • PMIS - Project Management Information System • RFP - Request for Proposal • SRT - Sludge Retention Time • UPCCAA - Uniform Public Cost Construction Accounting Act • UV - Ultraviolet Aw -0 PAGE 25 ACRONYMS Page 30 of 39 CENTRALSAKORG ACCOMPLISHMENTS INNUMBERS saved on the upgrades of our _ $14M solids handling facilities by _ piloting new wet scrubber " m technology • • • potential savings on interest $8*2Mcosts 2 2 through 0 9 by refinancing debt saved through negotiated $297K r r m i ate decreases from o ed ca and dental providers saved on plant control $50K systems m hardware early-bird pricing • " • • - - saved by performing repair ••• • " • • _ "• _ r �� s $16K of collections stem trucks •• _ - rodder assemblies in house saved on smog-related costs •- - $9K by submitting data from our _ _ _ - vehicle diagnostic software requirements compiled for 1,700 selection of enterprise _ _ _ resourcela n n i n software • • • • p g risks inventoried for inclusion 70 in monitoringand tracking g CENTRAL$AKORG program20 • • facilities evaluated in SUMMARY OF Security/Vu I nera bi l ity Study . November 2018 Regular ADMIN Committee Meeting A encu ace a"e o g g g gOPTIMIZATIONS BUSINESSINFRASTRUCTURE� EFFICIENCIEST PROCESi UPGRADES Ai -# � _ Reliabilityweb.com0 Best Reliability • -• - • •- .4 VEMENEngineering for Maintenance T74 • •• •" • - Program Uptime Award Winner• Documented business process to - • • " • - • for excellence and leadership inidentify opportunities for efficiency. - - -• - • • • • - • reliability and asset management.• Introduced electronic timekeeping - • •for employee •. • • -- • • • - 02 •- r Launched• new - • enhanced Installed new bar screen customer website. to improve inorganic ' • Established - - •it Program. material removal at the • Completed . on payroll, petty first stage of treatment. 6 ,_. m �' CA Water Environment � - cash, • procurement c- • Completed Vulnerability/Security Association Engineering • Implemented • - • • - • Stud and established Security and Research - Y Y improve - • to dispatch Coordination Committee. Research Achievement field crews. I - of the Year Award Winner ONGOING ONGOINLO,OReplace steam system for more for our Wet Scrubber Pilot Replace enterprise r effective energy recovery to prepa resource • - • for future regulatory requirements ONGOINGFF"_ software - thefoundation and expanded use of recycled water Upgrad7Solids Handling equipment of our operations. to increase resiliency and decrease DON'T JUSTF r'r,a i,. information• Use project management -;4 O&M costs for operating the _ IMPROVE ITAnalyze . . _ ultimately capital projects. Our Plant Maintenance staff achieve - necessary wetweather• Group pipeline -- is constantly rehabilitating our capacity using our existing selector schedules by • - • for assets to extend their useful life andinfrastructure increased • •• optimize their performance, going - - • - • • processing beyond the preventive maintenance for potential r-. •n in chemical (PM) - - (PM) or repair to execute "DJ FIs," suchcosts. as the following done this year: L FF I o Adoptionof • Public ,.. CityWorks® Excellence in • Replaced Furnace No. 2 center shaft • • • • • P Departmental Practice drive for increased system control. reduce administrative Award Winner • Replaced fiberglass conduit with costs of bidding - • for creative use of our stainless steel for greater reIiab•I•ty. _ • • ` maintenance management • Added hatch for operators to more project 4 software and our suggestions to easily access a three-way valve at the7 completion. November 6 ifffirReV$iLrWbWW,UWMittee Me ig r IO � e 54 of 80 Page 33 of 39 Optimizations Program Plan Under General Manager Roger S. Bailey's leadership, Central San has emphasized optimizations as a means of becoming a highly efficient and effective utility with a focus on continuous improvement. We protect public health and the environment in service to our customers, to whom we aim to deliver the best value for their investment, while maintaining our reputation of being safe and reliable. As our agency is in its 72nd year of operation, much of our infrastructure is in need of replacement, and we consider each task, no matter how small, an opportunity to identify ways to do our work better. This fiscal year, we formalize this mindset with the launch of Central San's Optimizations Program. Objective for FY 2018-19 To inaugurate the Optimizations Program, which will identify and execute optimizations to critical processes District wide, develop a mechanism to track progress, establish executive oversight, and ingrain optimizations into the company culture as an everyday mindset for all staff. Stru ctu re An Optimizations Tracking Log has been created for internal use. This log will track optimizations that occur throughout the year and will serve as a centralized, running list of all ongoing and planned optimizations District wide. After the close of each fiscal year, each division manager will be asked to submit at least one optimization planned to begin in the following fiscal year and meet the following criteria: • The initiative must be critical or important to the operation of the District. • A team must be named to manage the project. • Each Manager and Department Director is expected to be involved in the development and implementation. To ensure timely and successful outcome of all projects, the Management Analyst will facilitate a quarterly progress review at Managers Forum. The Optimizations Steering Committee, consisting of the Executive Team, will also meet as needed to support the program. At the end of each fiscal year, staff will provide an annual report to the Administration Committee and full Board on the achievements and progress of the fiscal year, as well as the optimizations planned for the next fiscal year. Presentations will also be made periodically at departmental staff meetings. November 6, 2018 Regular ADMIN Committee Meeting Agenda Packet- Page 55 of 80 10/31/18 - Law FISCAL YEAR (FY) 2017=18 OPTIMIZATIONS ANNUAL REPORT AND OG PR RAM PLAN . 6 � . Administration Committee Meeting =w November 6, 2018 i Christina Gee Management Analyst FY 2017-18 ANNUAL REPORT •Achievements and m � r progress in F - optimizations by category r • Business Process OPTINZATIONS Improvements ANNUAL REPORT . ;t �. r-- == • Infrastructure Upgrades l� # : ' ' • Efficiencies August 2013— July 1, 2017— . On the Horizon June 30, 2017 June 30, 2018 � .�- - '��` • Program formalization • FY 2018-19 SU oRY —"IMIIATIOq pF optimizations a November 6, 2018 Regular ADMIN Committee Meeting Agenda Packet- Page 56 of 80 1 10/31/18 BUSINESS PROCESS IMPROVEMENTS • Enhanced customer website • App for visitor check-in and room scheduling • Business process documentation and readiness assessment • Electronic timekeeping • Work order ticketing systems =�- • Internal audit program • Automatic vehicle location (AVL) • Rod-storage rack • Program forautomatic creation of underground service alert (USA) locating request work orders CENTRALSAN INFRASTRUCTURE UPGRADES • Headworks screening upgrades • Vulnerability/Security Study • Core networking switch replacement • Don't Just Fix It; Improve It • Optimization idea ` t • Failure before asset useful life r • Repeat failures showing up on Bad Actors list • Multiple reactive or corrective work orders on High Criticality Asset - , More than 1 reactive work orders with priority of 1 or 2 on specific asset between preventative maintenance tasks 4 CENTRALSAN November 6, 2018 Regular ADMIN Committee Meeting Agenda Packet- Page 57 of 80 2 10/31/18 14 DJFls COMPLETED • Furnace No. 2 Center Shaft Drive • Conduit at Primary Sedimentation Tank • Split Collar Wrench •Access Hatch w. 1 �m r 5 w *y, CENTRALSAN EFFICIENCIES ,; E' _LI •Piloting wet scrubber technology Refinancing debt(total anticipated gross interest savings through 2029) •Negotiating rate decreases in benefits costs $50,000 — Purchasing control systems hardware at an early-bird rate k II ' • 111 *� •Repairing two rodder assemblies in house •Submitting AVL data in lieu of smogging vehicles •Reusing recirculated oil for the clarifiers x 6 CENTRALSAN November 6, 2018 Regular ADMIN Committee Meeting Agenda Packet- Page 58 of 80 3 10/31/18 FY 2017-18 ONGOING OPTIMIZATIONS • New enterprise resource planning software • Intranet replacement �, p � • E-Builder® project management information system • CityWorks® refinement* Uniform Public Construction .f . Cost Accounting Act = . • Solids Handling Facility Improvements • Steam and Blower Replacement CENTRALSAN OPTIMIZATIONS PROGRAM PLAN • Structure • Optimizations Tracking Log • Quarterly progress review at Managers Forum • Optimizations Steering Committee meetings as needed • Annual reporting to Administration Committee and full Board • Commitment to plan additional projects for next fiscal year • Periodic departmental presentations • Objectives • Identify and execute optimizations to critical processes District wide • Develop a mechanism to track progress • Establish executive oversight • Ingrain optimizations into our culture as an everyday mindset for all staff CENTRALSAN November 6, 2018 Regular ADMIN Committee Meeting Agenda Packet- Page 59 of 80 4 10/31/18 FY 2018-19 PLANNED OPTIMIZATIONS •Switch to CalPERS health • Install video camera in Multipurpose Room •Enhance performance evaluation system •Link photos to assets in geographic information system •Replace Furnace No. 2 oxygen analyzer •Evaluate vehicle fleet inventory • Improve reliability of ultraviolet disinfection basins 9 = 1 CENTRALSAN CONCLUSION •Next steps •Complete implementation of ongoing FY 2017-18 optimizations •Evaluate and/or fulfill planned FY 2018-19 optimizations •Thank You •Staff •Division Managers •Executive Team " •Board 1. r ,dug to CENTRAL SAN November 6, 2018 Regular ADMIN Committee Meeting Agenda Packet- Page 60 of 80 5 10/31/18 QUESTIONS? CENTRALSAN November 6, 2018 Regular ADMIN Committee Meeting Agenda Packet- Page 61 of 80 6