HomeMy WebLinkAbout04.a. Asset Management Program Update Page 1 of 3 Item 4.a. CENTRAL CONTRACENTRAL COSTA SANITARY DISTRICT October 8, 2018 TO: ENGINEERING AND OPERATIONS COMMITTEE FROM: DANA LAWSON, SENIOR ENGINEER REVIEWED BY: DANEA GEMMELL, PLANNING AND DEVELOPMENT SERVICES DIVISION MANAGER J EAN-MARC PETIT, DI RECTOR OF ENGI NEERI NG AND TECHNI CAL SERVICES SUBJECT: ASSET MANAGEMENT PROGRAM UPDATE Senior Engineer, Dana Lawson, will provide the Engineering and Operations Committee with a verbal update of the Asset Management Program at the meeting. Strategic Plan Tie-In GOAL TWO: Strive to Meet Regulatory Requirements Strategy 2- Strive to minimize the number of sanitary sewer overflows GOAL THREE:Be a Fiscally Sound and Effective Water Sector Utility Strategy 1 - Conduct long-range financial planning, Strategy 2- Manage costs GOAL FIVE:Maintain a Reliable Infrastructure Strategy 1 - Manage assets optimally throughout their lifecycle, Strategy 2- Facilitate longterm capital renewal and replacement GOAL SIX:Embrace Technology, Innovation and Environmental Sustainability Strategy 2- Evaluate Business Processes and Optimize Business Operations ATTACHMENTS: 1.Asset Management Update October 8, 2018 EOPS Regular Committee Meeting Agenda Packet- Page 5 of 19 Page 2 of 3 Update on Asset Management Program Development ID Element Name Status (as of 9/26) 1 AM Organization, Policies and Key Strategies ✓ 2 Asset Register ✓ 2a Asset Hierarchy and Data Standards ✓ 2b Complete Asset Register- Pump Station &Treatment Plant Assets ✓ 2c Complete Utility Locating and Drafting to Consolidate Treatment Plant 50% Piping As-Builts 2d Complete Asset Register for Treatment Plant Piping 3 Plant Maintenance Strategy ✓ 3a Reliability Centered Maintenance Pilot Program ✓ 3b Expand Reliability Centered Maintenance Program (responsibility of Plant not included Maint Div, not included in this budget) 4 Business Process Mapping (in conjunction with related projects) as needed 5 Knowledge Management Strategy as needed • Treatment Plant Portal deployed • continuing to assist Capital Projects w/ Elec As-Is Dwg update 6 Condition Assessments -- 6a Failure Modes and Condition Assessment Protocol FY 18-19 6b Condition Assessment of Pump Station /Treatment Plant Assets ✓ CWMP 6c Condition Assessment of Critical Treatment Plant Piping -- • Budgeted as separate project starting FY 19-20 6d Consolidate CCTV Databases 80% • Data prior to Sept 2016 migrated into new format and merged into new, single master database • Need to migrate data from Sept 2016 to end of current blanket contract(June 2019) 7 Business Risk Exposure -- 7a Develop Consequence of Failure Criteria and Apply to Assets ✓ 7b Risk Assessment ✓ CWMP 8 Failure-Based Maintenance Strategies FY 18-19 9 Asset Valuations TBD 10 Program and Project Management Standards (see above) 50% • Implementing e-Builder. Currently in Phase 2 to update configuration based on beta-teams testing. Expect completion of Phase 2 in November; then training and roll-out for adoption phase to all of Capital Projects January—April 2019. Goal is full adoption by July 2019. Page - 1 October 8, 2018 EOPS Regular Committee Meeting Agenda Packet- Page 6 of 19 Page 3of3 September 26, 2018 Dana Lawson ID Element Name Status (as of 9/26) 11 Asset Commissioning and Handover substantially • CPD to update Div 1 re: format of O&M manuals complete • TP asset handover workflow map updated 12 Strategic Forecasting ✓ CS • TP &facilities: to develop in-house tool TP: FY 18-19 13 Capital Improvement Program Business Case Evaluations 25% • Draft templates and guidelines submitted to CP Div Manager for review 7/31 14 Update Asset Management Plan 10% • Lawson began draft of 1St comprehensive plan. Page - 2 October 8, 2018 EOPS Regular Committee Meeting Agenda Packet- Page 7 of 19