HomeMy WebLinkAbout04.c. Receive an update on Ygnacio Valley Road Project (Walnut Creek Sewer Renovations, Phase 12, District Project 8435) Page 1 of 6 Item 4.c. CENTRAL CENTRAL CONTRA COSTA SANITARY DISTRICT Central Contra Costa Sanitary District September 17, 2018 TO: ENGINEERING AND OPERATIONS COMMITTEE FROM: DAMASIO ZEPEDAARAGON, ASSOCIATE ENGINEER REVIEWED BY: SASHA MESTETSKY, SENIOR ENGINEER EDGAR J. LOPEZ, CAPITAL PROJECTS DIVISION MANAGER JEAN-MARC PETIT, DIRECTOR OF ENGINEERING AND TECHNICAL SERVICES SUBJECT: RECEIVE AN UPDATE ON YGNACIO VALLEY ROAD PROJECT (WALNUT CREEK SEWER RENOVATIONS, PHASE 12, DISTRICT PROJECT 8435) An update regarding the Ygnacio Valley Road Project will be discussed at the meeting. GOAL TWO: Strive to Meet Regulatory Requirements Strategy 2- Strive to minimize the number of sanitary sewer overflows GOAL FIVE:Maintain a Reliable Infrastructure Strategy 1 - Manage assets optimally throughout their lifecycle, Strategy 2- Facilitate long-term capital renewal and replacement ATTACHMENTS: 1. Presentation September 17, 2018 EOPS Regular Committee Meeting Agenda Packet- Page 34 of 42 Page 2 of 6 .. 4w-- t. Y i YGNACIO VALLEY ROAD UPDATE (WALNUT CREEK SEWER RENOVATIONS, PHASE 12, DP 8435) Engineering & Operations Committee September 17, 2018 Damasio Zepeda Aragon Capital Projects Associate Engineer BACKGROUND -aLkkv PfU -Ti MT;wl-wm � '-�' 1. :'9 j•�-�4 °��'+b"e"n '.L- P} + t _ r Vy RI 4�7 ]�G_1�• , Walth't Gc-eek St+,~t Rothowadhans P ha-me 1;2 IF rsl�*s?nl - Ckofrfc#FrippO 6436 S �. P,rvJfie9•L0cOklon Jorr IU,1,112 'fix. _ ■ 1 September 17, 2018 EOPS Regular Committee Meeting Agenda Packet- Page 35 of 42 Page 3 of 6 BACKGROUND . e :. 4, PROJECT �1 `=,y rJk�=, SITE s F e•.. 4 dr � ti.: i 4 +f. • f. ti•i d a d° 1 UFA-a- e t - pp y ems. -- i ti 1 CENTRALSAN PROJECT AND YGNACIO VALLEY SITE DETAILS • General Contractor: California Trenchless, Inc. • Notice to Proceed on March 12, 2018 • Project Status: 94% complete • Total of 8,367 feet completed, 543 feet remaining •Ygnacio Valley Work: • Replacement of 65 feet of deteriorated 10-inch sewer • Work completed over the course of seven nights from August 19 to August 29, 2018 •Agency Permits obtained: • CalTrans • City of Walnut Creek CENTRALSAN 2 September 17, 2018 EOPS Regular Committee Meeting Agenda Packet- Page 36 of 42 Page 4 of 6 COORDINATION AND CHALLENGES • Coordination with various stakeholders • Mandated night work + , • Due to high traffic on Yg n aci o Valley Road and QN7PAL CONsPA COSTA &&arm Highway-680 off ra m lane SANTO"DISTRICT p closure • Congested utility area •48-inch water line T Y •48-inch storm drainCREEK TRENCHRE88c g,enerdl engineering Contfacror, • High-voltage electric vaults j • Fiber optic ducts e ' CENTRALSAN 4aL5 CONSTRUCTION CONFLICTS EXISTING SEWER ALIGNMENT AT&T VAULT CONFLICT 6, FW3fftU Or I�y FDSPOW E Ei•R53.eyY� I L. L91 194P-Q1* 13■15911" �d T w- CENT 5 ■ ALSAN3 September 17, 2018 EOPS Regular Committee Meeting Agenda Packet- Page 37 of 42 Page 5 of 6 CONSTRUCTION PHOTOS • yy - i Ad C2,13 4 � - Sk- E" I • {P�5 _- NK I M ,�• - ML 7 w M a CONSTRUCTION PHOTOS t - r. .fig. 4 1. a a �i {r 18 CENTRALSAN 4 September 17, 2018 EOPS Regular Committee Meeting Agenda Packet- Page 38 of 42 Page 6 of 6 QUESTIONS '04 1 , _ � 9 5 September 17, 2018 EOPS Regular Committee Meeting Agenda Packet- Page 39 of 42