Loading...
HomeMy WebLinkAbout05.a. Announce Request for Proposal (RFP) for design services for the Influent Pump Electrical Improvements, District Project 7328 Page 1 of 1 Item 5.a. CENTRAL 07,Mkom MW.1 Z I I NOW1 Central Contra Costa Sanitary District August 13, 2018 TO: ENGINEERING AND OPERATIONS COMMITTEE FROM: EDGAR J. LOPEZ, CAPITAL PROJECTS DIVISION MANAGER REVIEWED BY: JEAN-MARC PETIT, DIRECTOR OF ENGINEERING AND TECHNICAL SERVICES ROGER S. BAILEY GENERAL MANAGER SUBJECT: ANNOUNCE REQUEST FOR PROPOSAL (RFP) FOR DESIGN SERVICES FOR THE INFLUENT PUMP ELECTRICAL IMPROVEMENTS, DISTRICT P ROJ E CT 7328 The Influent Pump Electrical Improvements, District Project 7328, will renovate and improve the Influent Pump Facility at the treatment plant. This facility is critical to operations and without the pumps, wastewater cannot be treated or stored in the basins. The project will add a new pump for reliability and replace the existing variable frequency drives which have reached the end of their useful life.Additional electrical and control improvements will be addressed to correspond with the listed improvements needed in the facility to maintain its reliability and resiliency. The RFP for design services will be advertised on August 31, 2018, with proposals due September 21, 2018. The estimate for consultant services is approximately$500,000. More information will be presented to the Board when the authorization for professional engineering services is presented in November. August 13, 2018 EOPS Regular Committee Meeting Agenda Packet- Page 30 of 30