Loading...
HomeMy WebLinkAbout03.a. Review draft Position Paper to authorize the General Manager to execute professional engineering services agreements with JDH Corrosion Consultants, Inc. and Alisto Engineering Group in an amount not to exceed $150,000 each to provide On-Call Corro Page 1 of 2 Item 3.a. CENTRAL SAN BOARD OF DIRECTORS POSITION PAPER DRAFT MEETING DATE: JULY 9, 2018 SUBJECT: REVIEW DRAFT POSITION PAPER TO AUTHORIZE THE GENERAL MANAGER TO EXECUTE PROFESSIONAL ENGINEERING SERVICES AGREEMENTS WITH JDH CORROSION CONSULTANTS, INC.ANDALISTO ENGINEERING GROUP IN AN AMOUNT NOT TO EXCEED $150,000 EACH TO PROVIDE ON-CALL CORROSION ENGINEERING SERVICES FOR DISTRICT PROJECTS SUBMITTED BY: INITIATING DEPARTMENT: DAMASIO ZEPEDAARAGON,ASSOCIATE ENGINEERING AND TECHNICAL SERVICES- ENGINEER CAPITAL PROJECTS REVIEWED BY: SASHAMESTETSKY, SENIOR ENGINEER EDGAR J. LOPEZ, CAPITAL PROJECTS DIVISION MANAGER JEAN-MARC PETIT, DIRECTOR OF ENGINEERING AND TECHNICAL SERVICES ISSUE The Board of Directors authorization is required for the General Manager to execute a professional engineering services agreement in an amount greater than $100,000. BACKGROUND Central San uses corrosion engineering services to assist in the design and construction of capital improvement projects. The purpose of the on-call corrosion agreements is to provide varied levels of corrosion engineering expertise to assist staff with projects managed by the Capital Projects Division. These services include concrete and materials field assessments related to wastewater exposure, recommendations for cathodic protection, testing, and other specialty corrosion services. In addition, these agreements provide similar assistance with evaluating assets for the Operations and Maintenance groups at Central San. Having an on-call corrosion specialist is a benefit when equipment or structures (i.e tanks) are out of service and items are identified for inspection. Staff prepared and posted a Request for Proposal on PlanetBids and the Central San website for on-call corrosion engineering services. On June 18, 2018, four proposals were received and evaluated. Staff July 9, 2018 EOPS Regular Committee Meeting Agenda Packet- Page 3 of 14 Page 2 of 2 selected J DH Corrosion Consultants, I nc. and Alisto Engineering Group as the best-fit firms based on their experience, past performance, and proposed fees. Contracting with two firms allows staff some flexibility to respond to urgent design, construction, and operations and maintenance needs. ALT ERNAT IVES/CONSIDERATIONS The practice of using as-needed or on-call agreements has been very successful. Executing this type of agreement allows for reduced administration costs and staff time needed to issue individual agreements for each project. The tasks under these agreements are typically low cost and consolidating the work is recommended. FINANCIAL IMPACTS The services under these two agreements are estimated to cost up to $100,000 per year($50,000 each). Central San may extend each contract for up to two additional years, totaling $300,000 ($150,000 each) over the three years. The services provided under these agreements are paid for and budgeted under projects identified in the yearly Capital I mprove ment Budget. I n some cases, when the services do not result in a capital improvement, these costs are charged to the Operating budgets. COMMITTEE RECOMMENDATION The Engineering and Operations Committee reviewed this agreement on July 9, 2018 and recommended approval. RECOMMENDED BOARD ACTION Authorize the General Manager to execute professional engineering services agreements with J D H Corrosion Consultants, Inc. and Alisto Engineering Group for an amount up to $150,000 each to provide on-call corrosion engineering services for capital improvement projects. GOAL TWO: Strive to Meet Regulatory Requirements Strategy 1 - Strive to achieve 100%permit compliance in air, water, land, and other regulations GOAL THREE:Be a Fiscally Sound and Effective Water Sector Utility Strategy 2- Manage costs GOAL FIVE:Maintain a Reliable Infrastructure Strategy 1 - Manage assets optimally throughout their lifestsyle, Strategy 2- Facilitate long-term capital renewal and replacement July 9, 2018 EOPS Regular Committee Meeting Agenda Packet- Page 4 of 14