HomeMy WebLinkAbout13.a. Presentation on pre-selection process for key equipment re Solids Handling Facility Improvements Project, DP 7348 Page 1 of 7 Item 13.a. CENTRALSAN CENTRAL CONTRA COSTA SANITARY DISTRICT July 5, 2018 TO: HONORABLE BOARD OF DIRECTORS FROM: NATHAN HODGES, SENIOR ENGINEER REVIEWED BY: EDGAR J. LOPEZ, CAPITAL PROJECTS DIVISION MANAGER JEAN-MARC PETIT, DIRECTOR OF ENGINEERING & TECHNICAL SERVICES ROGER S. BAILEY, GENERAL MANAGER SUBJECT: RECEIVE PRESENTATION ON PRE-SELECTION PROCESS FOR KEY EQUIPMENT IN SUPPORT OF THE SOLIDS HANDLING FACILITY IMPROVEMENTS PROJECT, DISTRICT PROJECT 7348 The Solids Handling Facility Improvements Project (Solids Project)will make improvements to nearly all solids handling processes found in the Solids Conditioning Building (SCB). These processes include sludge blending, dewatering, furnaces, and air pollution control equipment. Central San's design consultant, Black& Veatch, recently completed the 10-percent Pre-design phase and one of the outcomes of that effort was the recommendation to select critical equipment early in the Design phase. The equipment to be pre-selected are the centrifuges, cake pumps, and wet scrubbers. These specific pieces of equipment were identified in both the Comprehensive Wastewater Master Plan and Black& Veatch's pre-design as nearing the end of their useful life and in need of replacement. Also, in the case of the wet scrubber, the existing equipment will not meet upcoming regulations. Black& Veatch's recommendation to pre-select equipment brings advantages to the project: • Construction drawings and specifications will be based on the actual equipment • Utilizing 3D model will detect conflicts, confirm access, and maintain operation during construction • Improve cost estimates during design • Reduce change orders Black& Veatch and staff are finalizing the Basis of Design Memoranda and technical specifications for this equipment. The memoranda summarize the design objectives and document the performance criteria that will be used to select the equipment. The specifications will be included in the procurement documents. Staff has met, and continues to meet, with Legal Counsel to review the pre-selection process and ensure that selection complies with public procurement code. The centrifuges, cake pumps, and wet scrubber will be selected using an open request for proposal (RFP)followed by low-bid selection. The RFP will be July 5, 2018 Regular Board Meeting Agenda Packet- Page 151 of 195 Page 2 of 7 posted on Central San's website, proposals will be evaluated against pre-established criteria, and those manufacturers that meet these criteria will move on to the final bid selection phase. Final selection of this equipment will be based on the lowest, responsive bid. A purchase order (PO)will be issued to the manufacturer only for the cost of up front engineering and shop drawings preparation. The equipment manufacturing, delivery, and payment will be assigned to the General Contractor. Coordination of the front end documents for equipment selection and construction is critical so that there are no conflicts. Staff is working with Black& Veatch and Legal Counsel to ensure that Central San is protected. Staff has hired a third party consultant with extensive experience in construction document preparation to assist in the preparation of the front end documents. Jean-Marc Petit, Director of Engineering and Technical Services, will present a summary of the Solids Project Key Equipment Pre-Selection. Strategic Plan re-In GOAL TWO: Strive to Meet Regulatory Requirements Strategy 1 - Strive to achieve 100%permit compliance in air, water, land, and other regulations GOAL FIVE: Maintain a Reliable Infrastructure Strategy 2- Facilitate long-term capital renewal and replacement ATTACHMENTS: 1. Presentation July 5, 2018 Regular Board Meeting Agenda Packet- Page 152 of 195 Page 3 of 7 SOLIDS HANDLING FACILITY IMPROVEMENTS PROJECT - DP 7348 KEY EQUIPMENT PRE-SELECTION A'- Jean-Marc Petit Director of Engineering & Technical Services Board Meeting July 5, 2018 4� RECOMMENDED IMPROVEMENTS FROM PRE- DESIGN EFFORT FOR SOLIDS HANDLING PROJECT 1 2 7 4 5 8 3 6 I �y I I � � I SLVOOEBLEXOIXL/SIOAALE LI NEAUOIiIOX CEIfIAIFULEOEWAiEAIN6 NVLLNLEHFARTH AIRAOLWIION SCB SEISNfL A­AND AND ENEN6ENCY SLUUGE SYSTEM FLMINACES [ONT0.0L ILLlA09T LOADOUT LOAOOUT Elements to be Pre-Selected z CENTRALSAN 1 July 5, 2018 Regular Board Meeting Agenda Packet- Page 153 of 195 Page 4 of 7 KEY EQUIPMENT TO BE PRE-SELECTED • Centrifuges • Cake Pumps • Air Pollution Control Equipment - Systems --- ------ - CENTRALSAN BACKGROUND • Centrifuge and cake pump pre-selection • Procurement of wet scrubber • Combined RFQ-RFP document • Equipment selection progress summary Questionnaires sent to vendors and responses received Completed Site visits and summary notes Draft Basis of Design Memos(BDM),Draft front end documents Completed,in CS review Draft technical Specifications(Division 1—16) Completed,in CS review Finalize BDMs Late lune 2018 Front end document workshop Completed Final equipment selection document Mid August 2018 Open SOQs and Bids October 2018 Award Contract to selected manufacturers December 2018 CENTRALSAN 2 July 5, 2018 Regular Board Meeting Agenda Packet- Page 154 of 195 Page 5 of 7 ANTICIPATED DESIGN AND CONSTRUCTION SCHEDULE Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Equipment Procurement I� RFP and Equipment Selection I� Equipment Procurement Shop Drawings Final Design (30%,60%,95%,100%) Bidding _ Bid and Award Construction Installation and Commissioning Procurement Phase: January 2018—August 2019 Design Phase: April 2018—October 2019 Bid &Construction Phase: October 2019— December 2022 5 CENTRALSAN PRE-SELECTION OF EQUIPMENT IMPROVES COLLABORATION AND DESIGN ACCURACY • Customizes final drawings and specifications based on actual equipment • Drives high quality design - • Interference detection and avoidance • "Walk through"for Central San review of = - operations access and maintenance space and hoisting provisions • High level coordination with Electrical, Instrumentations,and Controls • Leverage 3D model to develop construction phasing and help maintain plant operations • Facilitates cost estimating for final installation • Reduces Change Orders 6 CENTRALSAN 3 July 5, 2018 Regular Board Meeting Agenda Packet- Page 155 of 195 Page 6 of 7 EQUIPMENT PROCUREMENT FOR CENTRIFUGES, CAKE PUMPS, AND WET SCRUBBERS O 4 4 0 O EL > 1. Issue SOQ and Bids for equipment 2. Open Bid for qualified equipment only 3. Award to most qualified and lowest responsible manufacturer for centrifuges,cake pumps,and wet scrubber systems 4. Issue PO for shop drawings only and pay when completed 5. Actual equipment purchase will be assigned to General Contractor for later manufacturing and delivery when needed based on bid price(*) (*)adjusted for inflation 7 ESTIMATED CASH FLOW FOR EQUIPMENT PRE-SELECTION Procurement FY 2017- FY 2018-19 FY 2019-20 FY 2020-21 FY 2021-22 Subtotals Centrifuges Procurement $ 285,000 1,282,500 $ 1,282,500 $ 2,850,000 Cake Pumps Procurement $ 180,000 $ 810,000 $ 810,000 $ 1,800,000 Wet Scrubbers Procurement $ 215,000 $ 967,500 $ 967,500 $ 2,150,000 Total $- $ 680,000 $ 3,060,000 $ 3,060,000 $- $ 6,800,000 Estimated Commitment 8 ` CENTRALSAN 4 July 5, 2018 Regular Board Meeting Agenda Packet- Page 156 of 195 Page 7 of 7 NEXT STEPS • Advertise procurement documents Bring Position Paper back to E&O Committee and Board of Directors for approval to sign purchase orders • Finalize Design of Solids Handling Facility Improvements Project: April 2018—October 2019 9 CENTRALSAN QUESTIONS? 10 ` CENTRALSAN5 July 5, 2018 Regular Board Meeting Agenda Packet- Page 157 of 195