HomeMy WebLinkAbout16.a. Introduction to the Energy Recovery and Blower Replacement Project IV
INTRODUCTION TO THE
� ENERGY RECOVERY &
BLOWER REPLACEMENT PROJECT
DP 7349
Jean-Marc Petit
Director of Engineering & Technical Services
Board Meeting
� June 7, 2018
Condition
Assessments/ Replace Aging/ Address
Equipment
Remaining Unreliable Assets
Redundancy
Useful life
Improve Energy Optimization/ Prepare forWater Exchange/
Efficiency/ Performance/ Future Nutrient
Sustainability Water Quality Removal
S
THERE IS AN INTER-RELATIONSHIP
BETWEEN THREE PROJECTS
Energy Recovery
& Blower
Replacement
Water Future
Exchange Nutrient
Removal
'04�13
CENTRAL SAN SECONDARY TREATMENT
PROCESSES
I - - IN-- ..
q —14
Toa ;7
,woe
op-
16
i
ENERGY RECOVERY AND BLOWER REPLACEMENT PROJECT ELEMENTS
NPI
Steam Generation
New
Boiler Feed Water
- + Blower
_ ' r� -• �� '+ Building?
I Steam &
z Condensate
Piping
Px
K, 3.IULL
130 �� �� 1
-
Optimize Selector New Diffusers & Piping
& Aeration Tank Rehab �+ �� . , _ - Dedicated
x. I� Aerated Grit
/ � Re-Use Blower Building _ " ry _ Blowers
for New Blowers?
SUB 52 Electrical Upgrades
SECONDARY TREATMENT/ELECTRICAL CONSIDERATIONS
v
SUB 82
Electrical Upgrades
t r. A
l.
X1.
Mixed Liquor - t
Hydraulic
Splitter Box -
_ ,�' Rehab Clarifiers
SUB 33&34 Add
Electrical Upgrades v _ �` - Generator
0. K'mk-bN
0 hill
INS
PLANNING FOR WATER EXCHANGE PROJECT ELEMENTS
�.
SUB 82 ��
Electrical Upgrades y
20 MGD Water Exchange: ..
Biological Nitrogen Removal (BNR)
Membrane Bioreactors (MBR), or a.
AquaNereda° Granular Activated Sludge
+ Microfiltration + Split Stream Reverse Osmosis t
Ilk - F4
a,
- i` � Divert 20 MGD Conventional Activated Sludge
PLANNING FOR FUTURE NUTRIENT REMOVAL BACWA LEVEL 1
w� SUB 82
Electrical Upgrades y
JI Al.
JEW
New �I
�*
Blower a.
t Building
I A - J
CEPT
Seasonal Nutrient "-
- r y r.l�.•- . .
Optimize Selector Removal: New
�L ,
Diffusers & Piping & IV
- '
Aeration Tank Rehab
K
j Re-Use Blower Building "
for New Blowers? SUB 52 Electrical Upgrades �'
PLANNING FOR FUTURE NUTRIENT REMOVAL BACWA LEVEL 2
SUB 82 v �� " Contaminated Soil
Electrical Upgrad Future Nutrient Relocation
Future Clarifiers? Removal Tanks `.
r- F
New
Blower k
❑ Building
C)o
Mdk
CEPT
4PC __ D
r
-
Convert to Nutrient
Optimize Selector Removal: New
Diffusers & Piping &
i - rim Expansion?
Aeration Tank Rehab r Primary
j Re-Use Blower Building "-
for New Blowers? SUB 52 Electrical Upgrades
PLANNING PHASE PROJECT ELEMENTS TO BE CONSIDERED
EElectrical
r v Contaminated Soil
Upgrades Future Nutrient Relocation
Water Exchange Future Clarifiers? Removal Tanks Steam Generation
New Boiler Feed Water
Blower
❑ Building i Steam &
Condensate
Piping
Mixed Liquor Rehab Clarifiers
Hydraulic j _._ Add
Splitter BoxGenerator
CEPT
SUB 33&34 F n
Electrical Upgrades y ll,
40
New Diffusers & Piping
Ar Optimize Selector & Aeration Tank Rehab _
- Dedicated
ot{ 0*. - Aerated Grit
Re-Use Blower Building " Primary Expansion Blowers
for New Blowers? -
r %
SUB 52 Electrical Upgrades
ELEMENTS OF THE ENERGY RECOVERY •
BLOWER REPLACEMENT PRE =DESIGN
JEENEL
. . Confirm
Detailed Condition . . Identify
Capacities &
Assessments Alternatives
Design Criteria
Prepare 10% Technical Peer
Develop lifecycle
Predesign and Review and
Costs for
Confirm Project Selection of Best
Alternatives
Cost and Phasing Alternative(s)
. gC"i
BOILER FEEDWATER &
STEAM SYSTEM
1
12
r �:t
STEAM SYSTEM IS CRITICAL FOR THE
SECONDARY PROCESS
Furnace Exhaust pry Waste Wet Induced
Scrubber Heat
tScrubber Draft
JBoilers - Scrubber Water
to Primary
Steam Piping Effluent Steam
Turbine
Cake Multiple Blowers J
P Hearth
Landfill gas Furnaces Electricit Waste St
Standby Us r
to Plant Heat U m - A/N Tanks
Power Boiler
St
PotableFacility
Boiler Feeds:
Water MHF Boilers Mixed Liquor
Feed Auxiliary
Water Cogen Boiler Electricity Meter Cogen Boilers Channels
Aux. Boilers from Grid Turbine
Final Effluent
Ash Channel
Handling ��
System Natural Gas Meter
Future Needs
(Nutrient
Backup Removal &
Electric Water
Blower Exchange)
--
�4!l9k
COMPLEX BOILER FEEDWATER & RETURN CONDENSATE SYSTEM
Legend
Water
Hard Steam _ High Pressure
CCWD Return
Water Condensate
Chemical
Ion Feed Cogen
Exchange System Boiler
Softeners
Waste
Deaerator
Return Heat Steam
Condensate ♦ Deaerator m* Storage Users
Tank
Tank Boilers
Low Pressure Auxiliary
Return Boilers
Condensate
14
BOILER FEED WATER VALVE REPLACEMENT
TRIGGERS MAJOR PLANT COORDINATION IN 2018
➢ Shutdown Aeration Turbines
➢ Transition to Electric Blower h
➢ Shutdown Cogen & WHB
(i.e. import PG&E power)
s,.
➢ Shutdown Boilers & Boiler ° Z-114W
r `
Feed Water System Var+
➢ Perform Repairs ° }
r,
➢
Start-up All Systems ` {
Kau _
15
/ • �- 1
- - .nom • ■ ' .� - 41 -
;
NNW
Steam Driven Boiler �n Steam Piping above
Feed Water Pumps Furnace WHB
WIC
I
` �j
Steam Piping in Tunnels
Steam Driven Pumps & from SCB to Pump &
Other Steam Piping in SCB Blower Building ` '
AERATION SYSTEM
1
a
I
f r
i � a
SCHEMATIC FOR AERATION TURBINE-BLOWER SYSTEM
O ROOF
cSteam —
s{7
Relief
0BLOWER
^M Condensate
� Vacuum
Cooling Water TURBINE 51219
'p. 3WHP (TYPICAL OF 2)
r- .,y GOVERNOR VALVE
�
TEMP AND THROTTLE VALVE—
co
ALVE
M Control Valve BYPASS VALVE TURBINE AIS INLET
Relief Valve
Check Valve N } TRAPS BYPASS VALVE� I
Manual Valve CONTROL J r-� 1
VALVE GLAND SEAL
CONDENSER BYPASS —
P&B BUILDING GROUND LEVEL FLOOR
RELIEFS DISCHARGE SILENCER
STRAINER WEIGHTS D
COOLING
SEPARATOR-PURIFIER 75115 CONDENSER 51104
FROM WATER CONDENSER 2
STEAM
HEADERS 3WHP TO VACUUM
SUB-COOLER
HOT HOGGER PUMP 51113
WELL
CONDENSATE
VIA TRAPS CONDENSATE
TO DEAERATOR TO 2W VIA SUMP TO
VIA HIGH PRESSURE ATMOSPHERE RETURN TANK
RETURN CONDENSATE (7IN SCB
SYSTEM w COOLER 19
P&.B BUILDING LOWER LEVEL FLOOR VACUUM PUMP 51110 HOTWELL PUMP 51107
Steam Turbine Blowers Electric Blower
i�
Lik� S � •!y_�..� � --�—�.... ! �®� � fid .---
`tel
-4 Piping, Pumps, etc. for Air Piping associated w/
Steam Turbine Blowers - Electric Blower
NOW.. -Aft go-
low
kj
w
ISSUES WITH STEAM 8c ELECTRIC BLOWER
Issues:
1. Reliable Parallel Operation - Existing steam-driven
blowers (r%"65,000 scfm ea . ) don't operate reliably in
parallel, nor in parallel w/electric blower ("-A5,000 scfm)
2.Turndown - Each steam-driven blower sized for peak air
demands but do not have adequate turndown for low air
demand conditions ( i.e. triggers use of air waste valve)
3. Redundancy - Electric blower is a backup for
emergencies and undersized for full range of air
demands, no redundant second electric blower
1
x
Ak
-'
Central ;antra C A/N Tanks
' � Sanitar+ ,Cistrlctti I`- -
ti � _r
Final Effluent
. Aeration . i Channel
Pump and Piping
Blower _ ir
Building '
t
�4 PO
str G mitral Contra.Cpstaj .rs11
Itary Dtstribt office
PRE = DESIGN
1
a
23
f -
DRAFT LIST OF PRE -DESIGN
TEr- WNICAI . MEMORANDA
• Tech Memo I - Condition Assessment of Energy System &
Aeration/Secondary Systems
'ch Mems ' - Condition Assessment of Electrical &
Instrumentation Systems
ech Memo - Design Criteria Development & Improvements
to Meet Current & Future Nutrient Regulatory Requirements
Bch Mems. - Business Case Analysis for In-Kind
Replacement & Other Alternatives
• Tech Memo 5 - Business Case Analysis for Water Exchange
Alternatives
• Tech Memo 6 - 10% Pre-Design Report
' 24
DRAFT PROJECT SCHEDULE
2018 -
A, Gm4mmm
Internal Kick-Off Meeting March 29
Draft RFP Internal Distribution 0 May 23
Project Introduction to E&O Committee May 7
Project Introduction to Board *June 7
RFP Advertisement * June 8
RFP Submittal Deadline July 13
Interview & Consultant Selection August 7
Presentation to E&O Committee August 13
Presentation to Board September 6
Notice to Proceed for Consultant Late September
Planning and Pre-Design September 2018 - February 2020
45L125
STIONS .
1
a
26