HomeMy WebLinkAbout04.f. Review March 2018 Financial Statements and Investment Reports Page 1 of 36
Item 41
Central Contra Costa Sanitary District
April 24, 2018
TO: FINANCE COMMITTEE
FROM: CHRISTOPHER THOMAS - FINANCE ADMINISTRATOR
REVIEWED BY: THEA VASSALLO, FINANCE MANAGER
PHILIP R. LEIBER, DIRECTOR OF FINANCE AND ADMINISTRATION
ANN SASAKI, DEPUTY GENERAL MANAGER
ROGER S. BAILEY, GENERAL MANAGER
SUBJECT: REVIEW MARCH 2018 FINANCIAL STATEMENTS AND INVESTMENT
REPORTS
Attached for review are the Financial Statements and Investment Reports as of the date shown above.
Strategic Plan re-In
GOAL THREE: Be a Fiscally Sound and Effective Water Sector Utility
Strategy 1 - Conduct Long-Range Financial Planning, Strategy 2- Manage Costs
ATTACHMENTS:
March 2018 Financial Statements and Investment Reports
April 24, 2018 Regular FINANCE Committee Meeting Agenda Packet- Page 144 of 192
Page 1 of 35
CENTRAL CONTRA COSTA SANITARY DISTRICT
April 10,2018
TO THE BOARD OF DIRECTORS
VIA: THEA VASSALLO 1)6
FROM JAMIE KING (- q11 0 It
- q` 10It O
SUBJECT: O&M Variance Analysis
The following are brief year-to-date variance explanations through period ending March 31,2018:
YTD YTD Fav/(Unfav) Variance
O&M Revenues: Budgeted Actual Variance % Explanation
Total $ 53,191,493 $ 53,284,748 $ 93,255 0.2% No significant variance.
O&M Exaenses(venences>$100K):
Total Labor Charges 50,113,715 49,191,451 922,264 1.8% Some positions budgeted for in July are filled later in the fiscal year resulting in savings.
Chemicals 1,093,876 727,148 366,728 33.5% Actual chemical shipments occur sporadically versus a budget which is evenly spread
throughout the fiscal year resulting in variances. Lime, Other Chemicals, and Sodium
Hydroxide expenses are lower than budgeted thus far.
Utilities 3,302,705 2,902,238 400,467 12.1% Delay in invoices. March invoices are not reflected in the financials.
Repairs&Maintenance 3,705,616 3,132,860 572.756 15.5% Budgeted expense for repair of Miner Rd in Orinda will not be incurred saving the District
$300K. Major expenses for CSO are frequently incurred towards the end of the fiscal year
although budgeted for evenly throughout the year.
Hauling&Disposal 737,934 632,039 105,895 14.4% Due to delay in invoices for Household Hazardous Waste Disposal and lower expense for
Ash Removal thus far in the fiscal year.
Professional&Legal Services 605,622 338,244 267,378 44.1% Due to delay in legal and professional invoices.
Outside Services 2.574,471 1,636,976 937,495 36.4% Mainly due to Technical Services expense being lower than budgeted thus far in the fiscal
year.
Other Expenses 1,890,828 1,497,216 393,612 20.8% Lower than budgeted fiscal year expense thus far for Public Agency Fees, Public
Information, Tech Training and Professional Expense Reimbursement. Variance is
expected to decrease by the end of the fiscal year.
All Other 2,197,640 2,114,255 83,385 3.8% Minor variances for multiple account categories.
Total $ 66,222,407 $ 62,172,427 $ 4,049,980 6.1%6
April 24, 2018 Regular FINANCE Committee Meeting Agenda Packet- Page 145 of 192
Page 2 of 35
Central Contra Costa Sanitary District
Protectnkg public health and the elivirf.milenr
Revenue Report MTD
Fund:001 -RUNNING EXPENSE(O&M)
March 2018 Fiscal Period 912018
Report Generated on Apr 9 2018 148:37 PM
Category MTD Estimate MTD Actual MTD%Rev YTD Estimate YTD Actual YTD%Rev Annual Estimate Unrealized Balance Annual%Rev
Concord $0 $0 0.0% $0 $0 0.0% $15,200,000 $15,200,000 00%
HHW $7,000 $11,455 63.6% $63000 $78,255 24.2% $853.000 $774,745 9.2%
Sewer Service Charges $11,942 $75,131 529.1% $50753878 $50.400,904 -0.7% $75,220.700 $24,819,796 67.01
Other $240.511 $463,166 92.6% $2,374.615 $2,805.591 18A% $3,385.000 $579.409 82.9%
Total Revenue $259,453 $549,752 111.9% $53,191,493 $53,284,760 0.2% $94,658,700 $41,373,950 56.3%
April 24, 2018 Regular FINANCE Committee Meeting Agenda Packet- Page 146 of 192
Page 3 of 35
.,idVO'1 Central Contra Costa Sanitary District
Expense Report- District Summary MTD
Fund:001 -RUNNING EXPENSE(O&M)
March 2018 Fiscal Period 09/2018
Report Generated on Apr 9, 2018 1-50 13 PM
$70,000,000 00
�Budget
Actual
222,407
$60.000,000 00 ��2,416
176
-S'S ,397,620
$50.000,000 00
533,919
,�x;9T8
$40-000,000 00 _S41,825,658
sa3�'1;654
$30,000,000-00 $29,g X534.159,376
$22,9 _ $27,765,667
$20,000.000 00 $16,0 $21,147,677
-
14,868,321
$10,000,000-00 $8.75,553
$8.182.586
$0.00
Jul(1)2017 Aug(2)2017 Sep(3)2017 Oct(4)2017 Nov(5)2017 Dec(6)2017 Jan(7)2018 Feb(8)2018 Mar(9)2018
Fiscal Periods
April 24, 2018 Regular FINANCE Committee Meeting Agenda Packet- Page 147 of 192
Page 4 of 35
Adcl Central Contra Costa Sanitary District
Expense Report-District Summary MTD
Fund:001 -RUNNING EXPENSE(O&M)
March 2018 Fiscal Period 0912018
Report Generated on Apr 9,2018 1:50:13 PM
category Period Budget Period Actual Period Variance % YTD Budget YTD Actual YTD Variance % Annual %
Budget
SALARIES&WAGES $2.899,767 $2,839.072 $60,695 2.1% $26,097,903 $25,460,282 $637,621 2.4% $34,797,628 73.2%
EMPLOYEE BENEFITS $2.681,880 $2,692,291 ($10,411) -0.4% $26,994,920 $26,234,441 $760,479 2.8% $36,752,619 71.4%
CAPITALIZED ADM OVERHEAD ($331.012) ($253,485) ($77,527) 23.4% ($2,979,108) ($2,503,283) ($475,825) 16.0% ($3,972,203) 63.0%
DIRECTOR FEES&EXPENSES $14.052 $10984 $3,068 21.8% $126,468 $112,244 $14,224 11.2% $168,631 66.6%
CHEMICALS $105,964 $48.496 $57,468 54.2% $1,093,876 $727,148 $366,728 33.5% $1,482,000 49.1%
UTILITIES $382,060 $321.338 $60,722 15,9% $3,302,705 $2,902,238 $400,467 12.1% $4,639,790 62.6%
REPAIRS&MAINTENANCE $441,624 $447,295 ($5,671) -1.3% $3,705,616 $3,132,860 $572,756 15.5% $5,299,754 591%
HAULING&DISPOSAL $85,326 $79.126 $6,200 7.3% $737,934 $632,039 $105,895 14.4% $1,023,975 61.7%
PROFESSIONAL&LEGAL SERV $68,958 $59.116 $9,842 14.3% $605,622 $338,243 $267,379 44.1% $807,600 419%
OUTSIDE SERVICES $401.730 $224,904 $176,826 440% $2,574,471 $1,636,975 $937,496 36.4% $3,452,717 47.4%
SELF-INSURANCE EXPENSE $0 $0 $0 0.0% $585,000 $585,000 $0 0.0% $585,000 100.0%
MATERIALS&SUPPLIES $166,908 $194,082 ($27,174) -16.3% $1,486,172 $1,417,016 $69,156 4.7% $2,059,325 68.8%
OTHER EXPENSES $129,126 $111,576 $17,550 13.6% $1.890.828 $1,497,213 $393,615 20.8% $2,616,751 57.2%
UNFUNDED LIABILITIES $0 $0 $0 0.0% $0 $0 $0 00% $0 0.0%
Total Expenses $7,046,383 $6,774,795 $271,588 3.9% $66,222,407 $62,172,416 $4,049,991 6.1% $89,713,587 69.3%
Color Key 0 to 10%over budget > 10% over budget
April 24, 2018 Regular FINANCE Committee Meeting Agenda Packet- Page 148 of 192
Page 5 of 35
CICentral Contra Costa Sanitary District
Expense Report-By Department MTD
Fund: 001 -RUNNING EXPENSE(O&M)
March 2018 Fiscal Period 0912018
Report Generated on Apr 9. 2018 1-53 26 PM
$2,500.000 M Penod Budget $25,000,000 YTD Budget
®Penod Actual ®YTD Actual
$2.000,000 $20,000,000
$1.500.000 $15,000,000
i
$1.000,000 $10,000,000
$500,000 $5,000,000
L� $0
pP� g�PG(05P POS\N\g��p�G\� o���G(\0Q� 0P�Q J�Q g(P��040\� �.
Period Budget Period Actual Period Variance YTD Budget YTD Actual YTD Variance
ADMINISTRATION $1,962,547 $1,827,342 $135,205 $20,010,274 $17,898,027 $2,112,247
ENGINEERING $1,355,947 $1,349,831 $6,116 $12,572,334 $12,229,152 $343,182
COLLECTION SYSTEM OPS. $1,179,629 $1,171,224 $8,.405 $10,490,661 $9,901,521 $589,140
PLANT OPERATIONS $2,198,663 $2,113,525 $85,138 $20,009,791 $19,484,226 $525,565
PUMP STATIONS $243,308 $193,093 $50,215 $2,151,772 $1,958,668 $193,104
RECYCLED WATER $106,289 $119,782 ($13,493) $987,575 $700,822 $286,753
Totals $7,046,383 $6,774,795 $271,588 $66,222,407 $62,172,416 $4,049,991
April 24, 2018 Regular FINANCE Committee Meeting Agenda Packet- Page 149 of 192
Page 6 of 35
' Central Contra Costa Sanitary District
. ,
Expense Report- By Department MTD
Fund: 001 -RUNNING EXPENSE(O&M)
March 2018 Fiscal Period 09/2018
Report Generated on Apr 9, 2018 1 53 26 PM
Department: ADMINISTRATION
Caier.ry Period Budget Period Actual Period Variance % YTD Budget
Budget
SALARIES&WAGES $588,695 $546,315 $42,380 7.2% $5,298,255 $4,843,761 $454,494 8.6% $7,064,444 68.6%
EMPLOYEE BENEFITS $896,126 $868,100 $28,026 3.1% $10,923,134 $10,025.240 $897,894 82% $15,322,061 65.4%
CAPITALIZED ADM OVERHEAD ($3.980} ($2.502) ($1,478) 37.1% ($35,820) ($29.211) ($6609) 185% ($47,770) 611%
DIRECTOR FEES&EXPENSES $14.052 $10,984 $3,068 218% $126,468 $112,244 $14,224 11.2% $168,631 666%
UTILITIES $12.203 $9,780 $2,423 19.9% $109,827 $84,401 $25,426 23.2% $146,440 57.6%
REPAIRS&MAINTENANCE $82.291 $89,913 ($7,622) -9.3% $740,619 $627.797 $112,822 15.2% $987,550 63.6%
PROFESSIONAL&LEGAL SERV $52,378 $47,438 $4,940 9.4% $456,402 $268.387 $188,015 41.2% $608,600 441%
OUTSIDE SERVICES $255.487 $204,307 $51,180 200% $1,208,783 $978.873 $229,910 19.0% $1.587,100 61.7%
SELF-INSURANCE EXPENSE $0 $0 $0 0.0% $585,000 $585.000 $0 0.0% $585,000 100.0%
MATERIALS&SUPPLIES $11.230 $12,108 ($878) -78% $129,070 $83.291 $45,779 35.5% $190,825 436%
OTHER EXPENSES $54.065 $40.899 $13,166 244% $468,536 $318.243 $150,293 32.1% $648,985 49.0%
UNFUNDED LIABILITIES $0 $0 $0 00% $0 $0 $0 0,0% $0 0,0%
ADMINISTRATION Total Expenses $1,962,547 $1.827,342 $135,205 6.9% $20,010,274 $17,898,027 $2,112,247 10.6% $27,261,866 65.7%
Color Key- 0 to 10%over budget 10%over budget
April 24, 2018 Regular FINANCE Committee Meeting Agenda Packet- Page 150 of 192
Page 7 of 35
' Central Contra Costa Sanitary District
I IIII A ��
Expense Report- By Department MTD
Fund: 001 -RUNNING EXPENSE(O&M)
March 2018 Fiscal Period 0912018
Report Generated on Apr 9, 2018 1 53:26 PM
Department ENGINEERING
PeriodCategory Period Budget Actual Period YTD Budget .Actuat YTD Variance % Annual 1/.
Budget
SALARIES&WAGES $824,553 $838,427 ($13,874) -1.7%s $7,420,977 $7,322,360 $98,617 1.3% $9,894,696 74.0%
EMPLOYEE BENEFITS $604.832 $643,648 ($38,816) -6.41/6 $5,443,488 $5,498,553 ($55,065) -1.0% $7,258,451 75.8%
CAPITALIZED ADM OVERHEAD ($299.122) ($238073) ($61,049) 20.4% ($2,692,098) ($2,336,562) ($355,536) 13.2% ($3,589,475) 65.1%
UTILITIES $15.265 $15,236 $29 0.2% $137,385 $125,563 $11,822 8.6% $183,200 68.5%
REPAIRS&MAINTENANCE $14.405 $13,217 $1,188 8.2% $129,645 $71,913 $57,732 445% $172,900 41.6%
HAULING&DISPOSAL $39,576 $31.408 $8,168 20.6% $326,184 $288,581 $37,603 11.5% $474,925 60.8%
PROFESSIONAL&LEGAL SERV $14,248 $11 181 $3,067 21.5% $128,232 $81,568 $46,664 36.4% $171,000 47.7%
OUTSIDE SERVICES $89,516 ($691) $90,207 100.8% $876,020 $496,122 $379,898 43.4% $1,184,767 41.9%
MATERIALS&SUPPLIES $31,530 $24,569 $6,961 22.1% $278,770 $215,634 $63,136 22.6% $378,450 57.0%
OTHER EXPENSES $21,144 $10,909 $10,235 48.4% $523,731 $465,421 $58,310 11.1% $905,423 51.4%
UNFUNDED LIABILITIES $0 $0 $0 0.0% $0 $0 $0 00% $0 0.0%
ENGINEERING Total Expenses $1.355,947 $1,349,831 $6,116 0.5% $12,572,334 $12,229,152 $343,182 2.7%, $17,034,337 71.8%
Color Key. 0 to 10% over budget > 10%over budget
April 24, 2018 Regular FINANCE Committee Meeting Agenda Packet- Page 151 of 192
Page 8 of 35
Central Contra Costa Sanitary District
Protecting public health wid the onvironment
Expense Report- By Department MTD
Fund: 001 -RUNNING EXPENSE(O&M)
March 2018 Fiscal Period 0912018
Report Generated on Apr 9, 2018 1:53.26 PM
Department: COLLECTION SYSTEM OPS.
Category Period Budget Period Actual .. . : .. . .Variance % Annual
Budget
SALARIES&WAGES $513,691 $511,392 $2,299 04% $4,623,219 $4,608,144 $15,075 03% $6,164,374 74.8%
EMPLOYEE BENEFITS $428,305 $433,836 ($5,531) -1.3% $3,854,745 $3,810,020 $44,725 12% $5,140,009 74.1%
CAPITALIZED ADM OVERHEAD ($4,373) ($3,704) ($669) 153% ($39,357) ($22,718) ($16,639) 42.3% ($52,482) 43.3%
UTILITIES $11.865 $14,306 ($2,441) -206% $106,785 $104,134 $2,651 2.5% $142,400 73.1%
REPAIRS&MAINTENANCE $135,356 $135,395 ($39) 0.0% $1,111,204 $684,985 $426,219 38.4% $1,624,304 42.2%
HAULING&DISPOSAL $10,916 $7,195 $3,721 34.1% $98,244 $69,907 $28,337 28.8% $131,000 53.4%
PROFESSIONAL&LEGAL SERV $625 $248 $377 60.2% $5,625 ($569) $6,194 110.1% $7,500 -7.6%
OUTSIDE SERVICES $9,215 $2,713 $6,502 706% $82,935 $46,487 $36,448 43.9% $110,600 42.0%
MATERIALS&SUPPLIES $62,456 $59.954 $2,502 4.0% $543,104 $504,122 $38,982 7.2% $749,550 67.3%
OTHER EXPENSES $11,573 $9,888 $1,685 14.6% $104,157 $97.009 $7,148 6.9% $138,958 69.8%
UNFUNDED LIABILITIES $0 $0 $0 0.0% $0 $0 $0 00% $0 0.0%
COLLECTION SYSTEM OPS.Total $1,179,629 $1.171,224 $8,405 0.7% $10,490,661 $9,901,521 $589.140 5.6% $14,156,213 69.9%
Expenses
Color Key: 0 to 10%over budget > 10%over budget
April 24, 2018 Regular FINANCE Committee Meeting Agenda Packet- Page 152 of 192
Page 9 of 35
/' Central Contra Costa Sanitary District
Expense Report-By Department MTD
Fund:001 -RUNNING EXPENSE(O&M)
March 2018 Fiscal Period 09/2018
Report Generated on Apr 9, 2018 1:53:26 PM
Department: PLANT OPERATIONS
Category .. Budgocl . Budget YTD Actual YTD Variance % Annual %
Budget
SALARIES&WAGES $858,322 $830,878 $27,444 3.2% $7,724,898 $7,679,951 $44,947 06% $10,299,997 746%
EMPLOYEE BENEFITS $668,532 $651,853 $16,679 25% $6,016,788 $6,119,694 °
($102,906) -17°'.° $8,023,023 76. /°3
CAPITALIZED ADM OVERHEAD ($23.537) ($9,205) ($14,332) 60.9% ($211,833) ($114.792) ($97,041) 458% ($282,476) 40.6%
CHEMICALS $73,965 $46,217 $27,748 37.5% $805,885 $599,097 $206,788 257% $1,098,000 54.6%
UTILITIES $285,799 $246,271 $39,528 13.8% $2,436,356 $2,124,324 $312,032 12.8% $3.484.600 61.0%
REPAIRS&MAINTENANCE $180,799 $196,970 ($16,171) -8.9/°
° $1,498.191 $1.591,956 ($93,765) -63°0 $2.169,700 73.4%
HAULING&DISPOSAL $34,101 $39,096 ($4,995) -14.6% $306,909 $266,118 $40,791 13.3% $409,250 65.0%
PROFESSIONAL&LEGAL SERV $541 $248 $293 541% ° °
$4,869 $1,252 $3,617 74.3/° $6,500 19.3/°
OUTSIDE SERVICES $23,956 $7508 $16,448 68.7% $211,729 $80,530 $131,199 620% $287.550 280%
MATERIALS&SUPPLIES $57,738 $96,367 ($38,629) -66.9% $499,642 $591,053 ($91,411)®' $693,000 853%
OTHER EXPENSES $38.447 $7,321 $31,126 810% $716,357 $545,044 $171,313 239% $833,590 65.4%
UNFUNDED LIABILITIES $0 $0 $0 00% $0 $0 $0 0.0% $0 0.0%
PLANT OPERATIONS Total Expenses $2,198,663 $2,113,525 $85,138 3.9% $20,009,791 $19,484,226 $525,565 2.6% $27,022,734 72.1%
Color Key: 0 to 10%over budget > 10%over budget
April 24, 2018 Regular FINANCE Committee Meeting Agenda Packet- Page 153 of 192
Page 10 of 35
' Central Contra Costa Sanitary District
Prvtecth�g public he,dth and the environment
Expense Report- By Department MTD
Fund:001 -RUNNING EXPENSE(O&M)
March 2018 Fiscal Period 09/2018
Report Generated on Apr 9, 2018 1:53:26 PM
Department: PUMP STATIONS
Category .. YTD Budget .Actual YTD Variance % Annual $,I
Budget
SALARIES&WAGES $79,751 $79.603 $148 0.2% $717,759 $729,942 ($12,183) -17% $957,027 76.3%
EMPLOYEE BENEFITS $56.211 $68283 ($12,072) -21.5% $505,899 $568,325 ($62,426)= $674,547 84.3%
CAPITALIZED ADM OVERHEAD $0 $0 $0 0.0% $0 $0 $0 0.0% $0 0.0%
CHEMICALS $25,000 $0 $25,000 100.0% $225,000 $76.651 $148,349 65.9% $300,000 256%
UTILITIES $42,345 $24,938 $17,407 41.1% $381.105 $350.358 $30,747 8.1% $508,150 68.9%
REPAIRS&MAINTENANCE $26,358 $11.800 $14,558 55.2% $204,222 $156,210 $48,012 235% $316,300 494%
HAULING&DISPOSAL $733 $1,427 ($694) -94.7% $6,597 $7.432 °
($835) $8,800 84.5/0
OUTSIDE SERVICES $6.683 $1.398 $5,286 79.1% $55,147 $14,704 $40,443 733% $80,200 18.3%
MATERIALS&SUPPLIES $3,466 $1.084 $2,382 68.7% $31,194 $22,630 $8,564 27.5% $41,600 54.4%
OTHER EXPENSES $2,761 $4,560 ($1,799) -65.2% $24,849 $32,414 ($7,565)= $33,171 97.7%
UNFUNDED LIABILITIES $0 $0 $0 0.0% $0 $0 $0 00% $0 0.0%
PUMP STATIONS Total Expenses $243.308 $193,093 $50,215 20.6% $2,151,772 $1,958,668 $193.104 9.0% $2,919.795 67.1%
Color Key: 0 to 10% over budget > 10% over budget
April 24, 2018 Regular FINANCE Committee Meeting Agenda Packet- Page 154 of 192
Page 11 of 35
' Central Contra Costa Sanitary District
Expense Report- By Department MTD
Fund: 001 -RUNNING EXPENSE(O&M)
March 2018 Fiscal Period 0912018
Report Generated on Apr 9,2018 1.53:26 PM
Department RECYCLED WATER
Category Period Budget Period Actual Period Variance 11� YTD Budget YTD Actual YTD Variance % Annual %
..-
SALARIES&WAGES $34,755 $32,457 $2,298 6.6% $312,795 $276,124 $36,671 11.7% $417,090 66.2°1
EMPLOYEE BENEFITS $27,874 $26.570 $1,304 4.7% $250,866 $212,608 $38,258 15.3% $334,528 63.6%
CHEMICALS $6,999 $2,279 $4,721 67.4% $62,991 $51,400 $11,591 18.4% $84,000 61.2%
UTILITIES $14,583 $10,807 $3,776 25.9% $131,247 $113,458 $17,789 13.6% $175,000 64.8%
REPAIRS&MAINTENANCE $2,415 $0 $2,415 100.0% $21,735 $0 $21,735 100.0% $29,000 00%
PROFESSIONAL&LEGAL SERV $1,166 $0 $1,166 100.0% $10,494 ($12395) $22,889 218.1% $14,000 -885%
OUTSIDE SERVICES $16,873 $9,669 $7,204 42.7% $139,857 $20,259 $119,598 85.5% $202,500 100%
MATERIALS&SUPPLIES $488 $0 $488 100.0% $4,392 $286 $4,106 93.5% $5,900 48%
OTHER EXPENSES $1,136 $37,999 ($36,863) -3,245.0% $53,198 $39,081 $14,117 26.5% $56,624 69.0%
RECYCLED WATER Total Expenses $106,289 $119,782 ($13,493) -12.7% $987,575 $700,822 $286,753 29.0% $1,318,642 53.1%
Color Key: 0 to 10%over budget > 10%over budget
April 24, 2018 Regular FINANCE Committee Meeting Agenda Packet- Page 155 of 192
Page 12 of 35
CENTRAL CONTRA COSTA SANITARY DISTRICT
RUNNING EXPENSE FUND
TEMPORARY INVESTMENTS
MARCH,2018
INVESTMENTS
(cents omitted) INTEREST INCOME
DATE OF
Days to ANNUAL CASH B.O.M. PURCHASE E.O.M. E.O.M %of CURRENT B.O.M. E.O.M.
NO. ISSUER TYPE PURCHASE MATURITY Maturity YIELD OUTLAY FACE VALUE (MATURITY) FACE VALUE MKT VALUE Portfolio MONTH CUMULATIVE CUMULATIVE
519 State of Calif. LAIF 10199- 1 (1) 35,000,000 40,000,000 (5,000,000) 35,000,000 35,014,074 100.00% 50,347.40 10,854.79 61,202.19
(3) 35,000,000 40,000,000 (5,000,000) 35,000,000 35,014,074 100.00% 50,347.40 10,864.79 61,202.19
(2)
0.00
60,347.40 10,854.79 61,202.19
NOTE: (1) Annual yield of Local Agency Investment Fund(LAIF)varies with the composition of the Fund.
The estimated yield as of March,2018 was 1.520%.
(2) The face value indicates the value of the investment if held until maturity,which is the usual District Practice.
(3) The weighted average yield of the total Running Expense portfolio is 1.520%.
(4) The market value of the portfolio on March 31,2018 was$35,014,074.
COMPLIANCE STATEMENT:
All investments comply with the District's internal investment policy approved by the Board of Directors.
April 24, 2018 Regular FINANCE Committee Meeting Agenda Packet- Page 156 of 192
Page 14 of 36
Page 13 of 35
�L-Central Contra Costa Sanitary District
Balance Sheet
Fund:001-RUNNING EXPENSE(O&M)
March 2018 Fiscal Period 912018
Summarized by Account
Report Generated on Apr 9 2018 1 45 19 PM
TOTAL ASSETS
Current Assets
CASH ACCOUNTS I CASH S7,697.188
CASH ACCOUNTS I PAYROLL CLEARING $17.548
CASH ACCOUNTS 1 PETTY CASH $3.400
CASH ACCOUNTS I TEMPORARY INVESTMENTS $35,000.000
DUE FROM+DUE FROM DEBT FUND $107119
DUE FROM:DUE FROM SIC $69095.356
DUE FROM+DUE FROM SII $597.519
INVENTORY/SUPPLIES 8 MATERIAL INV $2.182.862
PREPAID ACCOUNTS I PREPAID CAFETERIA PLAN $46.104
PREPAID ACCOUNTS I PREPAID COMMUTER PLAN $572
PREPAID ACCOUNTS 1 PREPAID EXPENSES $948,930
PREPAID ACCOUNTS I PREPAID INSURANCE 1$15219)
PREPAID ACCOUNTS 1 PREPAID RETREMENT $7.006377
RECEIVABLE ACCOUNTS I A/R-SSC DIRECT BILL $19101
RECEIVABLE ACCOUNTS 7 ACCOUNTS RECEIVABLE $329721
RECEIVABLE ACCOUNTS I ACCOUNTS RECEIVABLE COBRA 51777
RECEIVABLE ACCOUNTS 1 ACCRUED INTEREST A/R $61 202
RECEIVABLE ACCOUNTS I COMPUTER PURCHASE PROGRAM $12436
RECE VABLE ACCOUNTS 1 DEPOSITS TO BANK ESCROW $100243
RECE+VABLE ACCOUNTS I OVERTIME INSPECTION A/R S4580
Current Assets $117,296.616
Net Property,Plant and Equipment
CONTRIBUTED FIXED ASSETS I ACC DEPR CONTRIB ASSETS ($59 361 D01
CONTRIBUTED FIXED ASSETS/CONTRIBUTED SEWER LINES $157 791 729
FIXED ASSETS-C I P CONSTRUCTION IN PROGRESS $33 388 571
FIXED ASSETS/ACC DEPR-BUILDINGS ($12 876 506)
FIXED ASSETS/ACC DEPR-FURN 8 EQUIP ($9260262)
FIXED ASSETS/ACC DEPR-OUTFALL ($3616981)
FIXED ASSETS I ACC DEPR-PUMPING STATIONS ($33 1 D4 637)
FIXED ASSETS I ACC DEPR-SEWAGE COL SYS ($68 942 764)
FIXED ASSETS I ACC DEPR-TREATMENT PLANT ($220.382 148)
FIXED ASSETS I ACC DEPR-VEHICLES ($4853858)
FIXED ASSETS I ACCUM DEPRC-RECY WATER ($8.866 352)
FIXED ASSETS I BUILDINGS $44.238508
FIXED ASSETS/FURNITURE 8 EQUIPMENT $14.012.834
FIXED ASSETS I INTANGIBLE ASSETS $4.941,707
FIXED ASSETS I LAND $17.320.570
FIXED ASSETS/OUTFALL SEWERS $11.371,574
FIXED ASSETS?PUMPING STATIONS $57278.141
FIXED ASSETS I RECY WATER INFRASTRUCTURE $20 292.366
FIXED ASSETS:SEWAGE COLLECTION FAC L $351.503.802
FIXED ASSETS•TREATMENT PLANT $333 962.356
FIXED ASSETS VEHICLES $7.614.982
Net Property,Plant and Equipment $632,452,631
TOTALASSETS $749,749,"7
TOTAL LIABILITIES AND FUND EQUITY
Total Liabilities
ACCOUNTS PAYABLE!SALES TAX PAYABLE SO
CURRENT LIABILITIES+ACCOUNTS PAYABLE 5$225 913)
CURRENT LIABILITIES I ACCRUED COMPENSATED ABS (54.345.797)
CURRENT LIABILITIES+ACCRUED WAGES PAYABLE 151.153 451)
CURRENT LIABILITIES I CAFETERIA PLAN PAYABLE ($260131
April 24, 2018 Regular FINANCE Committee Meeting Agenda Packet- Page 157 of 192
Page 15 of 36
Page 14 of 35
'`Central Contra Costa Sanitary District
Balance Sheet
Fund:001-RUNNING EXPENSE(O&M)
March 2018 Fiscal Period 912018
Summarized by Account
Report Generated on Apr 9 2018 1 45 19 PM
CURRENT LIABILITIES I COMMUTER PLAN PAYABLE (54451
CURRENT LIABILITIES i MISC DEPOSITS/LIABILITIES ($1149311
CURRENT LIABILITIES 1 OTHER PAYROLL WITHHOLDING (58 824:
CURRENT LIABILITIES/PERMIT CLEARING $O
CURRENT LIABILITIES I REFUNDABLE DEPOSITS ($32080)
CURRENT LIABILITIES I RETIREMENT CONTRIB W/H ($1758762)
CURRENT LIABILITIES I WORKERS'COMP INS PAYABLE $102709
DEF COMP CONTRIBW/H I ICMA $0
DUE TO I DUE TO DEBT FUND ($3.773 399)
DUE TO I DUE TO S/C ($103.853.299)
DUE TO I DUE TO S/I ($585.000)
LIABILITIES LONGTERM•PENSIONIINFLOW;OUTFLOW (588.679765)
LIABILITIES LONGTERM PAST EMP BENEFIT-PENSION $3359.000
MEDICAL LIABILITIES I DELTA DENTAL (S76)
MEDICAL LIABILITIES 1 DISABILITY INS (567)
MEDICAL LIABILITIES I HEALTH NET s0
MEDICAL LIABILITIES i KAISER PERMANENTE (5703)
MEDICAL LIABILITIES I LIFE INS $29
MEDICAL LIABILITIES I OCCUPATIONAL HEALTH $3199
MEDICAL LIABILITIES I POST EMP BENEFIT-OPER $1,756072
PAYROLL TAXES WITHHELD I CALIFORNIA WITHHOLDING $0
PAYROLL TAXES WITHHELD I FEDERAL WITHHOLDING $0
PAYROLL TAXES WITHHELD f MEDICARE WITHHOLDING $0
REIMBURSEMENT FEES 1$54.6691
Total Liabilities ($199,392,187)
Total Fund Equity
FUND EQUITY I AVAILABLE FUND BALANCE ($27.253.390)
FUND EQUITY I CAPITAL COST SHARING (5108 691.757)
FUND EQUITY I CONTRIBUTED SEWER LINES ($157.791.729)
FUND EQUITY I EXPENDITURE SUMMARY $62.172416
FUND EQUITY I GENERAL FIXED ASSET GROUP (5190.206.773)
FUND EQUITY/STATE 8 FED CAPITAL GRANT (575,301,279)
YEAR TO DATE REVENUES I REVENUE SUMMARY ($53,284.750)
Total Fund Equity ($550,357,260)
TOTAL LIABILITIES AND FUND EQUITY ($749,749,447)
April 24, 2018 Regular FINANCE Committee Meeting Agenda Packet- Page 158 of 192
Page 15 of 35
CENTRAL CONTRA COSTA SANITARY DISTRICT
April 9,2018
TO: THE BOARD OF DIRECTORS
VIA: THEA VASSALLO
FROM: JAMIE KING ?q glq'tb
SUBJECT: Sewer Construction Varia(((nce Analysis
The following are brief year-to-date variance explanations through period ending March 31,2018:
YTD YTD Fav/(Unfav) Variance
SIC Revenues: Budgeted Actual Variance % Explanation
Received$1,744,407 in August 2017 for capacity fee
from Sunset Development for Bishop Ranch City Center
Total $ 22,570,342 $ 23,836,782 $ 1,266,440 5.6% project in San Ramon.
FY YTD FY %
S/C Expenses: Budget" Actual Remaining Spent
Total $ 46,471,559 $ 25,582,349 $ 20,889,210 55.0%
Includes 16117 carry-over($4.497 559)
April 24, 2018 Regular FINANCE Committee Meeting Agenda Packet- Page 159 of 192
Page 16 of 35
'Central Contra Costa Sanitary District
�.� .
Revenue Report MTD
Fund:002-SEWER CONSTRUCTION (Capital)
March 2018 Fiscal Period 912018
Report Generated on Apr 9 2018 1 48 37 PM
Category MTD Estlmate MTD Actual MTD%Rev YTD Estlmate YTD Actual YTD%Rev Annual Estimate Unrealized Balance Annual%Rev
Concord $0 $0 0.0% $0 $C 00% $6.000,000 $6,000,000 00%
Sewer Service Charges $0 $13.950 00% $9.575.000 $9,358.295 -2.3% $13.967,300 $4,609,005 670%
Other $605,038 $923,862 52.7% $12995.342 $14,478.486 114% $19.360.500 $4,882,014 748%
Total Revenue $605,038 $937,812 55.0% $22,570,342 $23,836,781 5.6% $39,327,800 $15,491,019 60.6%
April 24, 2018 Regular FINANCE Committee Meeting Agenda Packet- Page 160 of 192
Page 17 of 35
Sewer Fund(Capital)Spending FY 17-18
$30,000,000
$28,290,090
$25,000,000 24 $25,582,349
$19,326,199 $21,731,70 278,644
$20,000,000 111111111111111
$16,084,953 $21,232,942
$13,243,658 $19,187,468
$15,000,000 $15,524,480
$9,495,373
$10,000,000 $9,405,088
$5,236,547
$5,000,000
$2,466,069 6,421,043
2,820,219
$ 3,093
July August September October November December January February March
-Projected* -Actual
Columnl July I August Iseptember lOctober ovember IlDecernber lianuary IFebruary Imarch
Projected* $ 2,466,069 $ 5,236,547 $ 9,495,373 $ 13,243,658 $ 16,084,953 $ 19,326,199 $ 21,731,705 $ 24,743,018 $ 28,290,090
Actual 1,023,093 2,820,219 6,421,043 9,405,088 15,524,480 19,187,468 21,232,942 23,278,644 25,582,349
*Projected-Current year budget allocated by month based on historical spending in previous 2 years
Onril 7d ')MA Pnruilnr (r%mmiffcc bAccfinn Arvcnrin Pnr`Ircf- Pork 1R1 of 1Q7
Page 18 of 35
PROGRAM/GM185L4-Modified in Excel CAPITAL IMPROVEMENT BUDGET REPORT ACCOUNTING.
CENTRAL CONTRA COSTA SANITARY DISTRICT PERIOD ENDING: 3/31/2018PERIOD 9/2018,
A B C(A-B) D E F(C+D+E) G H(F-G)
PROJECT TOTAL TOTAL FY 2017-18 BUDGET APPROVED TOTAL TOTAL
PROD BUDGETS EXPENDITURES PROJECT APPROVED ADJUSTMENTS EXPENDITURES SPENT IN REMAINING BUDGET
NO PROJECT TITLE PYS(THRU FYE 16-17) PYS(THRU FYE 16-17) CARRY-FORWARD BUDGET FY 2017-18 FY 2017-18 FY 2017-18 FY 2017-18
TYPE CS Collection System $ 24,288,836 24,390,980 (102,144) 17,692,000 1,255,794 18,845,650 13,769,727 5,075,928
TYPE TP Treatment Plant 15,997,774 12,659,512 3,338,262. 18,045,000 _ 740,000 22,123,262 10,695,267 11,427,996
TYPE GI General Improvements 6,692,737 5,494,908 1,197,829 4,277,000 (500,000) 4,974,829 994,514 3,980,317
TYPE RW Recycled Water 522,894 459,282 63,612 460,000 I 523,612 122,841 400,771
CIB Contingency - - - 1,500,000 (_1,495,794) 4,206 - 4,206
TOTAL DISTRICT $ 47,502,241 $ 43,004,682 $ 4,497,559 $ 41,974,000 $ $ 46,471,559 $ 25,582,349 $ 20,889,218
**8422 See Footnote under Collection System 800,000
FY 2017.18 CIB Budget 42,774,000
A Represents all Board approved open projects at FYE 2016-17 in Sungard
BIncludes all prior years and FY 2016-17 expenditures to date
C Represents remaining projects open and unspent at the beginning of FY 2017-18
D FY 2017-18 CIB budget approved by the Board June 1,2017
E Shows reclasses of budget authorized by GM
F Includes PY open projects carryforward,CY Board approved budget,and transfers _
G Actual spent in FY 2017-18 on all budgeted and Board approved active projects _
H Approved open projects less actual spend this FY
N:\Accounting\GMTEMP3\Financials and Closing\2018 Financials\Capital Project report- FY 17 18 Mar 18
April 24, 2018 Regular FINANCE Committee Meeting Agenda Packet- Page 162 of 192
Page 19 of 35
PROGRAM/GM185L4-Modified in Excel CAPITAL IMPROVEMENT BUDGET REPORT ACCOUNTING
CENTRAL CONTRA COSTA SANITARY DISTRICT PERIOD ENDING: 3/31/2018 PERIOD 9/2018
8 C(A-B) D E F(C+D+E) G H(F-G)
PROJECT TOTAL TOTAL FY 2017-18 BUDGET APPROVED _ TOTAL TOTAL
PROJ BUDGETS EXPENDITURES PROJECT APPROVED ADJUSTMENTS EXPENDITURES __SPENT IN REMAINING BUDGET
NO PROJECT TITLE PYS(THRU FYE 16-17) PYS(THRU FYE 16-17) CARRY-FORWARD BUDGET FY 2017-18 FY 2017-18 FY 2017-18 FY 2017.18
TYPE CS Collection System
•5941 PS Equipment Piping Replacement 925,000 856,171 68,829 - 68,829 48,879 19,950--
5991 PH Sewer Renovation Phase 2 300,000 263,899 36,101 160,000 196,101 13,863 182,238
6602 South Jackson CAD 333,867 _ 318,466 15,401 - 7_7,423 92,824 72_,824 20,000__
6603 North Jackson CAD - - - 400,000 _- - 400,000 = 400,000
"'8249 CSO Dump Pad Modifications _ - - 60,000 60,000 60,000 _
8412 PH Grayson Creek Trunk 12,721,629 12,869,569 (147,940) _ 800,000 1,578,371 2,230,43_1 2,289,341 (58,910).
'8417 Survey Monument Install 250,000 231,550 18,450 - _ 18,450 18,413 _ 37
8419 Collection System Planning LT _ 670,000 662,077 7,923 200,000_ 207,923 180,112 27,811
•8420 Development Sewerage 4,371,102 4,190,458 180,644 - 180,644 148,387 32,257
'"8422 WC Sewer Renovation Phase it 2,369,000 3,003,494 (634,494) 1,381,000 746,506 1 738,126 8,380
8430 Lafayette Sewer Renovation Phase 11 700,000_ 696,839 1 3,161 3,717,000 3,720,161 3,512,820 207,341
8433 _S.Orinda Sewer Renovation Phase 6 _ 102,238 51,996 50,242 1,500,000 1,550,242 476,187 1,074,055
8434 Urgent Projects 316,000 - 244,157. 71,843 100,000 _ 171,843 51,955 119,888
8435 WC Sewer Renovation Phase 12 - _ - 1,000,000 1,000,000 594,463 405,537
8436 Moraga/Crossroads PS Project 450,000. 220,855 229,145. 850,000 _ 1,079,145 770,520 308,625
8437 Martinez Sewer Renovation Phase 5 _ _ _ 685,000 681,884 3,116 3,470,000 3,473,116 3,374,899 98,217_
•8439 Miner Rd Sewer Repairs 2017 _ 95,000, 99,565 (4,565) (4,565) 1,605 (6,170)
8440 Pipe Bursting Contract 17.20 700,000 (460,000) _ 240,000 - 240,000 _
8441 CIPP Contract 17-20 - 300,000 300,000 46,327 253,673
--- --- - --- - --
8442 PS Equipment Piping Replacement PH2 - - 36,000 36,000 - 36,000
8443 LG Diameter Pipe line Inspection - 200,000 200,000 4,352 195,648
8444 Force Main Inspection Program 75,000 _ 75,000 - 75,000
8445 N.Orinda Sewer Renovation - 636,000 636,000 477,394 158,606
8446 Lafayette Sewer Renovation Phase 12 - - 636,000 636,000 499,705 136,295
8447 Pump Station Security Improvement - - 131,000 131,000 131,000
8448 Manhole Modifications - - 400,000 400,000 251,290 148,710
8449 Collection System Modeling Support - - - _ 100,000 100,000 26,187 73,813 _
8450 Development Sewerage Support - - 400,000 400,000 172,078 227,922 _
8451 C.S.Sewer Renovation _ - 500,000 _ 500,000 - 500,000
Rounding 5
Total FY 2017-18 CS Amount S 24,288,83 390,980 (102,144) 17,692,000 1,255,794MMF 18,845,650 13,769,727
•Italic Projects open but not in CIB for 17/18 1 _
**8422 17/18 Approved budget was decreased by$800K,as a result of position paper 6.f.July 6,2017. Approved use of sewer construction funds in 16/17. -
`""8249 Not in 17/18 Budget. New project opened in Januar 2018- Funds transferred from DP8440
N:\Accounting\GMTEMP3\Financials and Closing\2018 Financials\Capital Project report-FY 17 18 Mar 18
April 24, 2018 Regular FINANCE Committee Meeting Agenda Packet- Page 163 of 192
Page 20 of 35
PROGRAM/GM185L4-Modified in Excel CAPITAL IMPROVEMENT BUDGET REPORT ACCOUNTING
CENTRAL CONTRA COSTA SANITARY DISTRICT PERIOD ENDING 3/31/2018 PERIOD 9/2018
A B C(A-B) D E F(C+D+E) G H(F-G)
PROJECT TOTAL TOTAL _ FY 2017-18 BUDGET APPROVED TOTAL TOTAL _
PROJ BUDGETS - EXPENDITURES _ PROJECT _APPROVED ADJUSTMENTS EXPENDITURES SPENTIN REMAINING BUDGET
NO PROJECT TITLE PYS(THRU FYE 16-17) PYS(THRU FYE 16-17) CARRY-FORWARD BUDGET FY 2017-18 FY 2017-18 FY 2017.18 FY 2017.18
TYPE TPTreafrrient Plant -
7291 _Pump&Blower Bldg.Seismic Upgrade _ 4,424,000 3,277,948 1,146,052_ 2,358,000 - 3,504,052 3,129,587 374,465
7292 Switchgear Refurbishment-Ph.2 420,000 419,246 754 350,000 - 350,754 I 13,389 337,365
7304 Instr&Controls PLC Upgrade 435,000 331,490 103,510 140,000 - 243,510 1 14,867 228,643
'7311_TP Safety Enhancement Ph.4 490,000 339,073 150,927 - _ 150,927 - 15_0,927 _
7314 Urgent Repairs 115,000 6,487 108,513 250,000 358,513 722 357,791
7315 Applied Research and Innovations 257,274 250,870 6,404 300,000 - 306,404 - 306,404
7317 Plant Control System Network Upgrades __ 260,000 194,556 65,444 1 70,000 - 135,444 35,091 100,353
'7319 Laboratory Upgrades&Repair 1,241,500 1,235,462 6,038 6,038 - 6,038
7320 Plant Energy Optimization 718,000 _ 390,230 327,770 376,000 - 703,770 594,909 108,861
7322 Fire Protection System Ph.2 __ 840,000 338,017 501,983_ 360,000 206_,000_ 1,067,983 60,465 1,007,518
7326 Equipment Replacement FY 15-FY 24 866,000 474,323 391,677 300,000 691,677 177,771 513,906
7327 Headwork's Screening Upgrade 2,500,000 2,694,774 (194,774) 5,644,000. 5,449,226 3,294,255 2,154,971 _
7328 Influent Pump Electrical improvements - - - 100,000. - 100,000 757 99,243 _
7329 MHF Burner Upgrade 370,000 128,595 241,405 400,000 i - 641,405_ 23,256 _ 618,149 _
7330Piping Renovation Phase 9 241,000 237,847 3,153 1,075,000 - 1,078,153__ 224,500 853,653 _
7339 !T.Plant Control System 1/0 Replacement 320,000 105,340 214,660 c 150,000 _ - 364,660 3.5.8,602 6,058
7341 WC/Grayson Creek Levee Rehab 150,000 - 150,000 100,000 - 250,000 250,000
7348 Solids Handling Facility Improvement; 2,350,000 2,235,254 114,746 2,625,000 - 2,739,746 1,2.39,983 1,499,763
7349 Aeration&Energy Upgrade _- - - - 300,000 300,000 f 7,992 292,008
7351 Mechanical&Concrete Renovation - - 560,000 240,000 800,000 877,457 (77,457)
7352 UV Disinfection Upgrades - - 400,000 - 400,000 - 400,000
7353 Outfall Improvements Ph.7 I 100,000 100,000 - _ 100,000
7354 TP Security Improvements _ - - 87,000 87,000 963 _ 86,037 _
7355 Odor Control Upgrade Ph.1 _ - - _ - 150,000 -(106,000) 44,000 - 44,00_0 _
7357 Plant Wide Instrumentation Upgrade - - - 100,000 I - 100,000 25,771 _ 74,229 _
7358 B&oenergy P3 Project 200,000 500,000 700,000 170,354 529,646
7359 Solids Conditioning Bldg.roof replacement - 500,000 - 500,000 131,998 368,002
7360 !Existing Plant Facility Drawing - - 100,000 100,000 42,138 57,862
7362 POB Seismic Upgrades - - - _ 400,000 �- 400,000 30,172 369,828
7363 Treatment Plant Planning - - - 450,000 450,000 240,268 _ 209,732
7364 TP Safety Enhancement Ph.5 _ 100,000 (100,000)_ - -
Rounding I 1 1
Total FY 2017-18 TP Amount $ 15,997,774 12,659,512 3,338,262 18,045,000 740,000 22,123,262 10,695,267 11,427,996
'Italic Pro/ert5 open but not in CIB for 17/78
N:\Accounting\GMTEMP1\Financials and Closing\2018 Financials\Capital Project report
April 24, 2018 Regular FINANCE Committee Meeting Agenda Packet- Page 164 of 192
Page 21 of 35
PROGRAM/GM185L4-Modified in Excel CAPITAL IMPROVEMENT BUDGET REPORT ACCOUNTING
CENTRAL CONTRA COSTA SANITARY DISTRICT PERIOD ENDING: 3/31/2018 PERIOD 9/2018
_ A B C(A-B) D E.
PROJECT TOTAL TOTAL FY 2017-18 BUDGET APPROVED TOTAL TOTAL
PROJ BUDGETS EXPENDITURES PROJECT APPROVED ADJUSTMENTS EXPENDITURES SPENT IN REMAINING BUDGET
NO PROJECTTITLE PYS(THRU FYE 16-17) PYS(THRU FYE 16-17) CARRY-FORWARD BUDGET FY 2017-18 FY 2017-18 FY 2017-18 FY 2017-18
TYPE GI General Improvements
8207 General Security and Access $ 127,616 - 106,224 21,392 67,000 - 88,392_ 15,437 _ 72,955 _
8227 GDI Treatment Plant 265,000 252,235 12,765 160,000 _ 172,765 67,272 105,493
8230 Capital Legal Services 138,665 132,383 6,282 20,000 - 26,282
- -
- - --- (5,236) 31,518
8236 District Easements 158,047 _ 157,210. 837 50,000 - 50,837 6,944 43,893
8238 Asset Management 2,019,185 _ 2,029,216 (10,031) 950,000 939,969 369,130 570,839
8240 �ITDevelopment 2,418,794 1,612,282 806,512 730,000 1,536,512 215,654 1,320,858
8243 Server Room Relocation 455,430 198,574 256,856 1,000,000' (500,000) 756,856 157,734 599,122 _
- - ----- ---
8247 Property V&Building Improvements
- - - 400,000 _ - 400,000_ 108,231 291,769 _
8248 Cyber Security - - - - 75,000 i - 75,000 - 75,000
8516 District Equipment Acquisition 526,000 521,511 4,489 150,000 - 154,489 39,640 114,849
8517 Vehicle Replacement Program 524,000 482,088 41,912 675,000 - 716,912 19,708 697,204__
9999 'capital Project Clearing(Accounting Use Only)" 60,000 3,185 56,815 - - 56,815 - 56,815
Rounding t 2
Total FY 2017-18 GI Amount $ 6,692,737 5,494,908 1,197,829
N:\Accounting\GMTEMPI\Financials and Closing\2018 Financials\Capital Project report•FY 17 18 Mar 18
April 24, 2018 Regular FINANCE Committee Meeting Agenda Packet- Page 165 of 192
Page 22 of 35
PROGRAM/GM1851.4-Modified in Excel CAPITAL IMPROVEMENT BUDGET REPORT ACCOUNTING
CENTRAL CONTRA COSTA SANITARY DISTRICT PERIOD ENDING: 3/31/201f 8 _ _ _ _ PERIOD 9/2018
A B C(A-B) EF(C+D+E)
PROJECT TOTAL _TOTAL FY 2017-18 BUDGET APPROVED TOTAL TOTAL
PROJ BUDGETS EXPENDITURES PROJECT APPROVED__ADJUSTMENTS EXPENDITURES SPENT IN REMAINING BUDGET
NO PROJECTTITLE PYS(THRU FYE 16-17) PYS(THRU FYE 16-17) CARRY-FORWARD BUDGET FY 2017-18 FY 2017-18 FY 2017-18 FY 2017.18
1
TYPE RW Recycled Water
7306 (Zone 1 Recycled Water 467,894 459,282 8,612. 30,000 _ 38,612 22,488 16,124
7346 'Surge Analysis 16-17 55,000 55,000 100,000 155,000 3,125 151,875 _
7361 Filter Plant Improvments 330,0001 330,000 97,228 232,772
I
Rounding
Total FY 2016-17 RW Amount $ 522,894 459,282 63,612-qW 460,000 - - 22,841 400,77
CONTINGENCY-ALL PROGRAMS 1,500,000 1,495,794) 4,206 4,206
GRAND TOTAL $ 47,502,241 43,004,682 4,497,559 41,974,000 - 46,471,559 25,582,349 20,889,218
N:\Accounting\GMTEMP1\Financials and Closing\2018 Financials\Capital Protect report-FY 17 18 Mar 18
April 24, 2018 Regular FINANCE Committee Meeting Agenda Packet- Page 166 of 192
Page 23 of 35
FY 17-18 CAPITAL BUDGET TRANSFERS
PERIOD ENDING:3/31/2018
val
ro
Paper PPosition Paper Position Paper GM Memo
Position p
Bion P GM 10/20/17 11/16&GM 12/7/17&GM 1ApAp ro 7&
PROJ.# PROJECTS 11/30 12/18 1/23/18 TOTAL 17/18 Contingency
7351 Mechanical&Concrete Renovations 240,000 - - - 240,000 1,500,000
8412 Pleasant Hill Grayson Creek Trunk Se - 178,371 1,400,000 - - 1,578,371
8440 Pipe Bursting Contract 17-20 - - (400,000) - (60,000) (460,000)
6602 South Jackson Way CAD - - 77,423 - - 77,423
7358 Bioenergy P3 Project - - - 500,000 - 500,000
8243 Server Room Relocation - - - (500,000) - (500,000)
7322 Fire Protection System Ph.2 - - - - 206,000 206,000
7355 Odor Control Upgrades Ph. 1 - - - - (106,000) (106,000)
7364 TP Safety Enhancement Ph.5 - - - (100,000) (100,000)
8249 CSO Dump Pad Modification - - - - 60,000 60,000
Contingency (240,000) (178,371) (1,077,423) - - (1,495,794) (1,495,794)
April 24, 2018 Regular FINANCE Committee Meeting Agenda Packet- Page 167 of 192
Page 24 of 35
O&M PROJECTS- EXPENDITURE LIST ACCOUNTING
PERIOD ENDING: 03/31/18 PERIOD 09/2018
OM043 - Naval Weapons Station
Prior years Project expended
Expenditure type through l6-17 Jul.'17 Aug.'17 Sept.'17 Oct.'17 Nov.'17 Dec.'17 Jan.'18 Feb.'18 Mar.'18 2017-18 YTD to date
Salary&Benefits $ $ 2,258 $ 643 $ 2,852 $ 5,950 $ 1,665 $ 415 $ 193 $ 611 $ 1,165 $ 15,752 $ 15,752
Technical Services $ $ - $ 2,031 $ 1,179 $ 22,830 $ 15,178 $ 10,941 $ 3,284 $ - $ 11 $ 55,443 $ 55,443
Total $ $ 2,258 $ 2,674 $ 4,031 $ 28,180 $ 611 $ 1,165 $ 71,19S.,$ 71,195
OM080 - CoCo Farm(Kiewit Future Farm Proposal)
Prior years Project expended
Expenditure type I through l6-17 Jul.'17 Aug.'17 Sept.'17 Oct.'17 Nov.'17 Dec.'17 Jan.'18 Feb.'18 Mar.'18 2017-18 YTD to date
Salary&Benefits $ 170,416 $ 4,582 $ 3,123 $ 3,892 $ 2,954 $ 2,410 $ 1,599 $ 622 $ 2,305 $ 220 $ 21,707 $ 192,123
Other Charges $ 73,876 - - - - - - - 1,120 - $ 1,120 $ 74,996
Total $ 244,292 $ 4,582 $ 3,123 $ 3,892 $ 2,954 $ 2,410. $ -1,599 $ 622 $ 3,425 $ 220 $ 22,8271$ 267,119
OM083 Refinery Recycled Water Exchange
Prior years Project expended
Expenditure type through 16-17 Jul.'17 Aug.'17 Sept.'17 Oct.'17 Nov.'17 Dec.'17 Jan.'18 Feb.'16 Mar.'18 2017-18 YTD to date
Salary&Benefits $ 2,158 $ 1,830 $ 2,576 $ 1,153 $ 7,716 $ 7,716
other Charges $ $ - $ -
Total $ - $ - $ - $ - $ $ - $ 2,158 $ 1,830 $ 2,576 $ 1,153 $ 7,716 $ 7,716
N:\Accounting\GMTEMPI\Financials and Closing\2018 Financials\O&M Projects Activity YTD
April 24, 2018 Regular FINANCE Committee Meeting Agenda Packet- Page 168 of 192
Page 25 of 35
CENTRAL CONTRA COSTA SANITARY DISTRICT
SEWER CONSTRUCTION FUND
TEMPORARY INVESTMENTS
MARCH,2018
INVESTMENTS
(cents omitted) INTEREST INCOME
DATE OF Days to ANNUAL CASH B.O.M. PURCHASE E.O.M. E.O.M. %of CURRENT B.O.M. E.O.M.
NO ISSUER TYPE PURCHASE MATURITY Maturity YIELD OUTLAY FACE VALUE (MATURITY) FACE VALUE MKT VALUE Portfolio MONTH CUMULATIVE CUMULATIVE
519 State of Calif. LAIF 8186-2190 — 1 (1) 9,500,000 9,500,000 0 9,500,000 9,503,820 32.20% 12,264.11 194,828.55 207,092.66
0
925 Toyota Motor Comm Pa 12106117 03106118 0 1.43 3,000,000 (3,000,000) 0 0 0.00% 591.67 10,058.33 10,650.00
926 US Govt Agency Dscnt 12107/17 06108118 69 1.42 4,964,163 5,000,000 0 5,000,000 4,984,000 16.95% 6,037.84 16,555.36 22,593.20
927 US Govt Agency Dscnt 12107117 06108118 69 1.42 4,964,163 5,000,000 0 5,000,000 4,984,000 16.95% 6,037.84 16,555.36 22,593.20
928 US Govt Agency Dscnt 12107117 06108118 69 1.42 4,964,163 5,000,000 0 5,000,000 4,984,000 16.95% 6,037.84 16,555.36 22,593.20
929 US Govt Agency Dscnt 12/07117 06/08118 69 1.42 4,964,163 5,000,000 0 5,000,000 4,984,000 16.95% 6,037.84 16,555.36 22,593.20
(4) 29,356,650 32,500 000 (3,000,000) 29,500,000 29,439,820 100.00% 37,007.14 271,108.32 308,115.46
(3) (5)
96,531.95 96,531.95
37,007.14 367,640.27 404.647.41
NOTE: (1) Annual Yield of Local Agency Investment Fund(LAIF)varies with the composition of the Fund.
The estimated yield as of March,2018 was 1.520%.
(2) The face value indicates the value of the investment if held until maturity, which is the usual District practice.
(3) The weighted average yield of the total Sewer Construction portfolio is 1.452%.
(4) The market value of the portfolio on March 31,2018 was$29,439,820.
GASB 31 requires adjusting investments to market value. The District will adjust annually,but report market values monthly.
(5) The District has sufficient funds available combined with secured SSC and Property Tax received in December and April to cover
six months of cash flow needs.
COMPLIANCE STATEMENT: All investments comply with the District's internal investment policy approved by the Board of Directors.
April 24, 2018 Regular FINANCE Committee Meeting Agenda Packet- Page 169 of 192
Page 27 of 36
Page 26 of 35
�1 ntrat Contra Costa Sanitary District
Balance Sheet
Fund:002-SEWER CONSTRUCTION(Capital)
March 2018 Fiscal Period 912018
Summarized by Account
Report Generated on Apr 9 2018 1 45 19 PM
TOTALASSETS
Current Assets
CAD RECEIVABLE AVAD-ALHAMBRA VLY AR $958967
CASH ACCOUNTS CASH $2 687 549
CASH ACCOUNTS TEMPORARY INVESTMENTS $29.500.000
DUE FROM DUE FROM DEBT FUND $3.910168
DUE FROM DUE FROM RIE $103 853.299
RECEIVABLE ACCOUNTS I ACCOUNTS RECEIVABLE $82.256
RECEIVABLE ACCOUNTS I ACCRUED INTEREST AIR $96.836
RECEIVABLE ACCOUNTS I CAD RECEIVABLE $201 762
Current Assets $141,290,838
Net Property,Plant and Equipment
FIXED ASSETS-C I P I CONSTRUCTI•C•N IN PROGRESS $25 582 359
Net Property,Plant and Equipment $25,582,359
TOTAL ASSETS $166,873,197
TOTAL LIABILITIES AND FUND EQUITY
Total Liabilities
ACCOUNTS PAYABLE)SALES TAX PAYABLE 50
CURRENT LIABILITIES+ACCOUNTS PAYABLE ($224 526)
CURRENT LIABILITIES I PROJECT RETENTION PAYABLE (5760 130)
CURRENT LIABILITIES 1 REFUNDABLE CONST BONDS (5238 710)
DUE TO/DUE TO DEBT FUND (5259 315(
DUE TO/DUE TO RIE ($69.095 356)
LIABILITIES;UNEARNED INTEREST ($52.9771
Total Liabilities ($70,631,014)
Total Fund Equity
EXPENDITURE SUMMARY I TRANSFER TO CIP ($25.582.359)
FUND EQUITY I AVAILABLE FUND BALANCE (572.405.401)
FUND EQUITY I EXPENDITURE SUMMARY $25.582.359
YEAR TO DATE REVENUES I REVENUE SUMMARY ($23.636.781}
Total Fund Equity ($96,242,182)
TOTAL LIABILITIES AND FUND EQUITY ($166,873,197)
April 24, 2018 Regular FINANCE Committee Meeting Agenda Packet- Page 170 of 192
Page 27 of 35
Central Contra Costa Sanitary District
• Revenue Report MTD
Fund: 003-SELF-INSURANCE
March 2018 Fiscal Period 9/2018
Report Generated on Apr 9: 2018 1:48:37 PM
Category MTD Estimate MTD Actual MTD%Rev YTD Estimate YTD Actual YTD%Rev Annual Estimate Unrealized Balance Annual%Rev
Other $5582 $41.311 640 V': $635.238 $678.492 6 8 $727000 $48.508 93 3,:..
Total Revenue $5,582 $41,311 640.1% $635,238 $678,492 6.8% $727,000 $48,508 93.3%
April 24, 2018 Regular FINANCE Committee Meeting Agenda Packet- Page 171 of 192
Page 28 of 35
'1 Central Contra Costa Sanitary District
Expense Report- By Department MTD
Fund:003-SELF-INSURANCE
March 2018 Fiscal Period 09/2018
Report Generated on Apr 9, 2018 1.53:26 PM
$40000 Period Budget $1.000.000 YTD Budget
®Period Actual ®YTD Actual
I
$800,000
$30.000
I
$600,000
$20,000
$400.000
$10.000
$200.000
i
I
i
$11 - - so '--- - -- T
Period Budget Period Actual Period Variance YTD Budget :YTD Actual YTD Variance$30,124 $33,714 ($3,590) $846,116646,061 $200,055Totals $30,124 $33,714 ($3,590) $846,116646,061 $200,055
April 24, 2018 Regular FINANCE Committee Meeting Agenda Packet- Page 172 of 192
Page 29 of 35
.09M' Central Contra Costa Sanitary District
Protecting Public 110,11th and the Lw3virunmcnt
Expense Report- By Department MTD
Fund:003-SELF-INSURANCE
March 2018 Fiscal Period 09/2018
Report Generated on Apr 9, 2018 1.53:26 PM
Department:
PeriodCategory Period Budget Period Actual YTD Budget Actual YTD Variance % Annual %
Budget
INSURANCE&OTHER EXP $1,375 $3,855 ($2,480) -180.4% $587,375 $544,715 $42,660 7.3% $591,500 92.1%
GENERAL&AUTO LIABILITY $28,749 $29,859 ($1,110) -3.9% $258,741 $102,747 $155,994 60.3% $345,000 298%
EMP RELATED&POLLUTION $0 $0 $0 0.0% $0 ($1,401) $1.401 0.0% $0 0.0%
Total Expenses $30,124 $33,714 ($3,590) -11.9% $846,116 $646,061 $200,055 23.6% $936,500 69.0%
Color Key: 0 to 100% over budget > 10% over budget
April 24, 2018 Regular FINANCE Committee Meeting Agenda Packet- Page 173 of 192
Page 30 of 35
CENTRAL CONTRA COSTA SANITARY DISTRICT
SELF-INSURANCE FUND
TEMPORARY INVESTMENTS
MARCH,2018
INVESTMENTS
(cents omitted) INTEREST INCOME
DATE OF
Days to ANNUAL CASH B.O.M. PURCHASE E.O.M. E.O.M %of CURRENT B.O.M. E.O.M.
NO. ISSUER TYPE PURCHASE MATURITY Maturity YIELD OUTLAY FACE VALUE (MATURITY) FACE VALUE MKT VALUE Portfolio MONTH CUMULATIVE CUMULATIVE
519 State of Calif. LAIF 10199- 1 (1) 6,500,000 6,500,000 6,500,000 6,502,614 100.00% 8,391.23 50,814.46 59,205.69
(3) 6,500,000 6,500,000 0 6,500,000 6,502,614 100.00% 8,391.23 50,814.46 59,205.69
(2)
108.90 108.90
8,391.23 50,923.36 59,314.59
NOTE: (1) Annual yield of Local Agency Investment Fund(LAIF)varies with the composition of the Fund.
The estimated yield as of March,2018 was 1.520%.
(2) The face value Indicates the value of the investment if held until maturity,which is the usual District Practice.
(3) The weighted average yield of the total Self-Insurance portfolio is 1.520%.
(4) The market value of the portfolio on March 31,2018 was$6,502,614.
COMPLIANCE STATEMENT:
All investments comply with the District's internal investment policy approved by the Board of Directors.
April 24, 2018 Regular FINANCE Committee Meeting Agenda Packet- Page 174 of 192
Page 32 of 36
Page 31 of 35
'`Central Contra Costa Sanitary District
Balance Sheet
Fund:003-SELF-INSURANCE
March 2018 Fiscal Period 912018
Summarized by Account
Report Generated on Apr 9 2018 1 45 19 PM
TOTAL ASSETS
Current Assets
CASH ACCOUNTS+CASH $193668
CASH ACCOUNTS+TEMPORARY INVESTMENTS $6500000
DUE FROM a DUE FROM WE $585000
RECEIVABLE ACCOUNTS I ACCRUED INTEREST AIR $22900
Current Assets $7,301,568
TOTAL ASSETS $7,301,568
TOTAL LIABILITIES AND FUND EQUITY
Total Liabilities
CURRENT LIABILITIES a ACCOUNTS PAYABLE '$5855)
CURRENT LIABILITIES I GASB10 ACTUAR AL RESERVE 15807 079)
DUE TO 1 DUE TO RIE 15597 519)
Total Llabllnies ($1,410,454)
Total Fund Equity
FUND EQUITY 1 EMPLOYMENT.-POLLUTION RISK 155 000 000)
FUND EQUITY a EXPENDITURE SUMMARY $646061
FUND EQUITY+INS PREMS'CLAIMSILAWSUITS ($858683)
YEAR TO DATE REVENUES•REVENUE SUMMARY (S678492)
Total Fund Equity ($5,891,114)
TOTAL LIABILITIES AND FUND EQUITY ($7,301,568)
April 24, 2018 Regular FINANCE Committee Meeting Agenda Packet- Page 175 of 192
Page 32 of 35
' Central Contra Costa Sanitary District
Revenue Report MTD
Fund:004-DEBT SERVICE
March 2018 Fiscal Period 912018
Report Generated on Apr 9, 2018 1 48:37 PM
Category MTD Estimate MTD Actual MTD%Rev YTD Estimate YTD Actual YTD%Rev Annual Estimate Unrealized Balance Annual%Rev
Other $0 $0 0 011.5 $3,770.349 $3,770,349 0 W" $3.819,099 $48750 987..
Total Revenue $0 $0 0.0% $3,770,349 $3,770,349 0.0% $3,819,099 $48,750 98.7%
April 24, 2018 Regular FINANCE Committee Meeting Agenda Packet- Page 176 of 192
Page 33 of 35
' Central Contra Costa Sanitary District
Protoctin",public health and the environment
Expense Report- By Department MTD
Fund: 004-DEBT SERVICE
March 2018 Fiscal Period 09/2018
Report Generated on Apr 9, 2018 1 53.26 PM
$5.000 Period Budget $1,000,000 [1 YTD Budget_
❑Period Actual ❑YTD Actual
i
$4.000 $800,000
$3.000 $600,000
$2,000 $400.000
$1.000 $200.000
50 SO
Period Budget Period Actual Period Variance YTD Budget YTD Actual YTD Variance
$4,742 $4,742 $0 $826,736 $826,111 $625
Totals $4,742 $4,742 $0 $826,736 $826,111 $625
April 24, 2018 Regular FINANCE Committee Meeting Agenda Packet- Page 177 of 192
Page 34 of 35
' Central Contra Costa Sanitary District
Expense Report- By Department MTD
Fund: 004-DEBT SERVICE
March 2018 Fiscal Period 0912018
Report Generated on Apr 9, 2018 1:5126 PM
Department
BudgetCategory Period Budget Period Actual Period Variance % YTD Budget YTD Actual YTD Variance % Annual %
INTEREST EXPENSE $4,742 $4,742 50 0.0% $826,736 $826,111 $625 0.1% $1,231,722 67.1%
Total Expenses $4,742 $4,742 $0 0.0% $826,736 $826,111 $625 0.1% $1,231,722 67.1%
Total Expenses $7,081,249 $6,813,251 $267,998 3.8% $67,895,259 $63,644.588 $4,250,671 6.3% $91,881,809 69.3%
Color Key: 0 to 10% over budget , 10% over budget
April 24, 2018 Regular FINANCE Committee Meeting Agenda Packet- Page 178 of 192
Page 36 of 36
Page 35 of 35
' Central Contra Costa Sanitary District
Balance Sheet
Fund.004'DEBT SERVICE
March 2018 Fiscal Period 912018
Summarized by Account
Report Generated on Apr 9 2018 1 45 19 PM
TOTALASSETS
Current Assets
DUE FROM DUE FROM RIE $3 773 399
DUE FROM I DUE FROM SIC $259315
L T DEBT ACCOUNTING I DEPOSIT WITRUSTEE•RESERVE $4856450
L T DEBT ACCOUNTING I REVENUE BOND RESERVE CASH (9245)
RECE VABLE ACCOUNTS I ACCRUED INTEREST AIR $10548
Current Assets $6,699,468
TOTAL ASSETS $8,899,468
TOTAL LIABILITIES AND FUND EQUITY
Total Liabilities
CURRENT LIABILITIES r RECYCLED WATER LOAN $0
DUE TO DUE TO RIE (9187.119)
DUE TO:DUE TO SIC (93,910,168)
L T DEBT ACCOUNTING I BOND ACR INTEREST PAYABLE $0
L T DEBT ACCOUNTING I BONDS PAYABLE (929,095.000)
Total Liabilities (933,192,288)
Total Fund Equity
FUND EQUITY AVAILABLE FUND BALANCE $27.237057
FUND EQUITY 1 EXPENDITURE SUMMARY $826111
YEAR TO DATE REVENUES REVENUE SUMMARY ($3770349)
Total Fund Equity $24,292,820
TOTAL LIABILITIES AND FUND EQUITY ($8,899,468)
April 24, 2018 Regular FINANCE Committee Meeting Agenda Packet- Page 179 of 192