Loading...
HomeMy WebLinkAbout11.b. Summary of 2017 energy usage Page 1 of 5 Item ll.b. Central Contra Costa Sanitary District March 15, 2018 TO: HONORABLE BOARD OF DIRECTORS FROM: CLINT SHIMA, SENIOR ENGINEER REVIEWED BY: NEIL MEYER, PLANT MAINTENANCE DIVISION MANAGER ANN SASAKI, DEPUTY GENERAL MANAGER ROGER S. BAILEY, GENERAL MANAGER SUBJECT: RECEIVE SUMMARY OF 2017 ENERGY USAGE Senior Engineer Clint Shima will present a summary of Central San's 2017 energy usage. The presentation will include the following: • Treatment Plant Usage - 2016 versus 2017 • Monthly Usage Statistics • General Energy Information Strategic Plan re-In GOAL SIX: Embrace Technology, Innovation and Environmental Sustainability Strategy 3- Encourage the Review and Testing of Promising and Leading Technology, Strategy 4- Reduce Reliance on Non-Renewable Energy ATTACHMENTS: Summary of 2017 Energy Usage March 15, 2018 Regular Board Meeting Agenda Packet- Page 230 of 275 Page 2 of 5 3/5/2018 f SUMMARY OF THE DISTRICT'S 2017 ENERGY USAGE Board of Directors Meeting xMarch 15, 2018 Clint Shima, P.E. Senior Engineer Plant Maintenance Division OVERVIEW Central San Monthly Energy Usage Board Updated Quarterly Treatment Plant 2016 versus 2017 Monthly Usage Statistics General Energy Information , • Solar Panels s .« 1 March 15, 2018 Regular Board Meeting Agenda Packet- Page 231 of 275 Page 3 of 5 3/5/2018 TREATMENT PLANT 2016 VERSUS 2017 2016 2017 Natural Gas (NG): 400,000 MMBtu $1.8 M 398,000 MMBtu $1.8 M Landfill Gas 91,000 MMBtu $314k 89,000 MMBtu $308k (LFG): Total: 491,000 MMBtu $2.1 M 487,000 MMBtu $2.1 M Electricity 4,734,000 kWh $1.0 M 6,606,000 kWh $1.3 M (PG&E): (Cogen): 19,746,000 kWh 19,679,000 kWh Total: 24,481,000 kWh 26,285,000 kWh MONTHLY USAGE STATISTICS • Total Costs (Natural Gas, Landfill Gas and Electricity) o Range: $280,000 to $389,000 o Average: $338,000 Average Cost / MG: $269.03 Average kWh / MG: 1,898 Area Cost Breakdown o Treatment Plant: 81% — 88% o Pumping Stations: 10% — 18% Collection System Operations Facility: < 1% 2 March 15, 2018 Regular Board Meeting Agenda Packet- Page 232 of 275 Page 4 of 5 3/5/2018 GENERAL ENERGY INFORMATION Reduced cogeneration led to increased import from PG&E Carbon monoxide catalyst and evaporative cooler installed in November 2017 Back to normal operation PG&E o Gas transmission and storage rate case o If passes, rate increase starting January 1, 2019 Energy Optimization PG&E large integrated audit Battery storage -Ai, GENERAL ENERGY INFORMATION NG 2018 Average: $3.24/MMBtu NG 2019 Average: $3.04/MMBtu Landfill gas supply is decreasing 2017 Greenhouse Gas: Below 25,000 CO2e MT Renewable Energy: -25% 3 March 15, 2018 Regular Board Meeting Agenda Packet- Page 233 of 275 Page 5 of 5 3/5/2018 SOLAR PAN INSTALLED AT HOUSEHOLD HAZARDOUS WASTE FACILITY AND COLLECTION SYSTEMS OPERATIONS FACILITY Year 1 Estimate: 246 MWh 2017 Produced: 288 MWh 4 March 15, 2018 Regular Board Meeting Agenda Packet- Page 234 of 275