Loading...
HomeMy WebLinkAbout03.e. Quarterly update on Coco San Sustainable Farm Page 1 of 3 Item 3.e. 1 Central Contra Costa Sanitary District February 14, 2018 TO: REAL ESTATE, ENVIRONMENTAL AND PLANNING COMMITTEE FROM: DANEA GEMMELL, PLANNING AND DEVELOPMENT SERVICES DIVISION MANAGER REVIEWED BY: JEAN-MARC PETIT, DIRECTOR OF ENGINEERING AND TECHNICAL SERVICES ROGER S. BAILEY, GENERAL MANAGER SUBJECT: QUARTERLY UPDATE ON COCO SAN SUSTAINABLE FARM In October 2017, the Real Estate, Environmental and Planning (REEP) Committee requested that AgLantis provide a quarterly update with schedule updates, explanation of variations/deviations and a financial summary. The REEP Committee indicated that there is no need for presentations and that a written report would suffice. This is the first quarterly update and is based on an email sent by Dr. Carolyn Phinney. IRRIGATION PLAN for Title 22 and POSSIBLE REVISED SITE PLAN: "Here's our latest draft of the site plan with the irrigation system for Title 22. I sent five changes to Mike Milani, but you get the general idea. I asked that he change the plantings to green and rows to brown, so it's visually sensible and move the water tanks away from the entrance and straighten the T so it's parallel to I mhoff. You may share this draft." DONATIONS: "We raised $11,000 to $12,000 since the last meeting. I won't have time to calculate until the annual report. We also received many thousand in-kind donation from Mike Milani in civil engineering." CROPS: "Bethallyn planted an edible cactus along the new fence which is permanent and survived the drought month. We planted a couple acres of seed along the fence and all of it died in the driest December ever. We can't grow until we get Title 22." PG&E: "Had an electrician out to the farm to advise on PG&E. Have contacted PG&E to get options for both site plans (greenhouse moved North or left in South location)." February 14, 2018 Special REEP Committee Meeting Agenda Packet- Page 78 of 83 Page 2 of 3 ATTACHMENTS: 1. Revised Farm Site Plan February 14, 2018 Special REEP Committee Meeting Agenda Packet- Page 79 of 83 0000 M P A OOZ 0001 0 VE EN r L N S FO el C oC c*t-o S a*v S ut,&Va Flarml 4( GRAYSON CREEK CONTRA COSTA COUNTY FLOOD CONTROL AND WATER CONSERVATION O DISTRICT (4181 OR 30) O � 15' PERIMETER DIRT MAINTENANCE ROAD (TYP.) o 10' LANDSCAPE SECURITY BUFFER ZONE a cci 2" LOOPED RECYCLE WATER SUPPLY LINE (TYP.) k T E k k E E k k E E E E E O E E E E E E k k E E E E k k k ONES" k k E k k E E E E E E k k i. E c E � k 4 E E E E E E E k .. k E I7' � k E k wt k k k k E k k k k E k k k c I � ILII III \ k \ k k � � �I' I III II \ •. E \ �1 k ` II Ill I II II , k i 1 t I I I �� E I,II III II' RECYCLEER MAIN CCCSD \ kk k p0� owes � k k X00 �2 �o \ k � ♦ \ / _ G _ C � k k \ / I REQ F WA WITH F SI TED O k E k r 7.52' k CYCLE SIG o \ k 1. k \ will In II 'I,il kk 0rn .� ek l S s \ 7k °�'� o k k BARN I O� S6, 0 C, 7/, " k \ A k Irrigated _ ���0��7 \ k k k k III III III I O k< < k I I \ k k E �IIllllll I ILII IlllilJ III 1 k k N RECYCLEDQ k` SS \ Gti k k\ VIII III I�il b I � 'lllu i E III III' IIIl ILII II III I I I' k Page e3of3 WATER E I IIIIII b �I k \ E a I Illi I III E k , ` \ I I I E ,``� Gid k / ♦ ♦ SS. \ �y��° E k k k PERIMETER CHAIN LINK FENCE (TYP.) \ °aO k - k k \ W40rr \ k k k k k \ \ � .0 E Do ♦ ♦ \ k k 15' PERIMETER DIRT MAINTENANCE ROAD (TYP.) \ \ ' / \ k k k Drinkk k \ , c1�1 \ \ / `vU \ k k k k k ♦ ♦ \ k, E kE k k 2" LOOPED RECYCLE WATER SUPPLY LINE (TYP.) \ Q 00 No Beber k k (D k 10' LANDSCAPE SECURITY BUFFER ZONE G� N i O O� PLANTING BED (4 ROWS TYP. ) \ �� Cj - 1 2" LOOPED DRIP LINE TYP. 1-1/2" HEADER SUPPLY LINE ♦ ss \ \ X (TYP.) 5P N N � ` \ O� \ N - - - - _ 2" LOOPED RECYCLE SUPPLY LINE (SEE PLAN) ♦ ♦ \ °���o RE I/lEW COPY - - - � SUBJEC l TO REVISION ♦ Is, NO T FINAL THIS N077CE rREMOVEDO BE N COMPLE77ONOF MAP AND PON E AGENCY/CLIENT APPROVAL OF MAP 0 VARIES (SEE PLAN) 0 60 30 0 60 0 i TM.164Z /N.741V1/V67 U/tYra 691t11P9S1rFS.1rf-PZ741V SCALE: 1"=60' CoCO SUSTAINABLE FARM DESIGNED UNDER THE DIRECTION OF: NO. REVISIONS BY APP DATE SHEET APN 159 -140-051 POZTION PCL C 91 �M 41 pfESS/�,� Planning 2655 Stanwell Drive, SUITE 105 A PROJECT OF AgLantis ���oe�FalGfFyc a Surveying & Mapping Concord, CA 94520 MICHAEL E. MILANI DATE Q�' F� E Land Development Engineering R.C.E. No. 35121 REGISTRATION EXPIRES 9-30-19 co U y m 1 0 Municipal Engineering & Associates P.O.BSALADS FO� LS OX 5966 P.L.S. No. 5311 REGISTRATION EXPIRES 12-31-19 w z � � No.35121 0 Concord, CA 94524 DESIGN: MEM EXP. 30 19 Construction Staking JOB NO: 1050 1-11 Construction Management MILANI Phone: (925) 674-9082 TITLE 22 EXHIBIT �1q �/vIL '�� DRAWN: MEM DATE: 01/25/2018 F pF CA%oi OF SHEETS Fax: (925) 674-9279 CCCSD CONTRA COSTA COUNTY CALIFORNIA CHECKED: KRA SCALE: AS SHOWN February 14, 2018 Special REEP Committee Meeting Agenda Packet- Page 80 of 83