HomeMy WebLinkAbout03.e. Quarterly update on Coco San Sustainable Farm Page 1 of 3
Item 3.e.
1
Central Contra Costa Sanitary District
February 14, 2018
TO: REAL ESTATE, ENVIRONMENTAL AND PLANNING COMMITTEE
FROM: DANEA GEMMELL, PLANNING AND DEVELOPMENT SERVICES DIVISION
MANAGER
REVIEWED BY: JEAN-MARC PETIT, DIRECTOR OF ENGINEERING AND TECHNICAL
SERVICES
ROGER S. BAILEY, GENERAL MANAGER
SUBJECT: QUARTERLY UPDATE ON COCO SAN SUSTAINABLE FARM
In October 2017, the Real Estate, Environmental and Planning (REEP) Committee requested that
AgLantis provide a quarterly update with schedule updates, explanation of variations/deviations and a
financial summary. The REEP Committee indicated that there is no need for presentations and that a
written report would suffice. This is the first quarterly update and is based on an email sent by Dr. Carolyn
Phinney.
IRRIGATION PLAN for Title 22 and POSSIBLE REVISED SITE PLAN:
"Here's our latest draft of the site plan with the irrigation system for Title 22. I sent five changes to Mike
Milani, but you get the general idea. I asked that he change the plantings to green and rows to brown, so
it's visually sensible and move the water tanks away from the entrance and straighten the T so it's parallel to
I mhoff. You may share this draft."
DONATIONS:
"We raised $11,000 to $12,000 since the last meeting. I won't have time to calculate until the annual report.
We also received many thousand in-kind donation from Mike Milani in civil engineering."
CROPS:
"Bethallyn planted an edible cactus along the new fence which is permanent and survived the drought
month. We planted a couple acres of seed along the fence and all of it died in the driest December ever.
We can't grow until we get Title 22."
PG&E:
"Had an electrician out to the farm to advise on PG&E. Have contacted PG&E to get options for both site
plans (greenhouse moved North or left in South location)."
February 14, 2018 Special REEP Committee Meeting Agenda Packet- Page 78 of 83
Page 2 of 3
ATTACHMENTS:
1. Revised Farm Site Plan
February 14, 2018 Special REEP Committee Meeting Agenda Packet- Page 79 of 83
0000 M P A OOZ 0001
0 VE EN r L N S FO el C oC c*t-o S a*v S ut,&Va Flarml
4( GRAYSON CREEK
CONTRA COSTA COUNTY FLOOD CONTROL AND WATER CONSERVATION
O DISTRICT
(4181 OR 30)
O �
15' PERIMETER DIRT MAINTENANCE ROAD (TYP.)
o
10' LANDSCAPE SECURITY BUFFER ZONE a cci 2" LOOPED RECYCLE WATER SUPPLY LINE (TYP.)
k T E k k E E k k E E E E E O E E E E E E k k E E E E k k k ONES" k k E k k E E E E E E k
k i. E c E � k 4 E E E E E E E k .. k
E I7'
� k E k
wt k k k k E k k k k E k k k
c I � ILII III \ k
\ k k � � �I' I III II \ •. E
\
�1 k ` II Ill I II II , k
i
1
t I
I I
�� E I,II III II'
RECYCLEER MAIN CCCSD
\
kk
k
p0�
owes
� k k X00
�2
�o \ k �
♦ \ / _ G _ C
� k k
\ / I
REQ F WA WITH F SI TED O
k E k r 7.52' k CYCLE SIG o
\ k 1. k \ will
In
II 'I,il kk 0rn
.�
ek
l
S s \
7k °�'� o k k BARN I
O�
S6, 0
C, 7/,
" k \ A k
Irrigated
_ ���0��7 \ k k k k III III III I O k< < k I I
\ k k E �IIllllll I ILII IlllilJ III 1
k k N
RECYCLEDQ k`
SS \ Gti k k\ VIII III I�il b I � 'lllu
i E III III' IIIl ILII
II III I I I' k
Page e3of3
WATER
E I IIIIII b �I k \
E a I Illi I III E k ,
` \ I I I E
,``� Gid k
/ ♦ ♦ SS. \ �y��° E k k k PERIMETER CHAIN LINK FENCE (TYP.) \
°aO k - k k \
W40rr
\ k k k k k \ \ � .0
E
Do ♦ ♦ \ k k 15' PERIMETER DIRT MAINTENANCE ROAD (TYP.) \ \
' / \ k k
k
Drinkk k \ ,
c1�1 \ \
/ `vU \ k k k k k
♦ ♦ \ k, E kE k k 2" LOOPED RECYCLE WATER SUPPLY LINE (TYP.) \ Q
00
No Beber
k k (D
k
10' LANDSCAPE SECURITY BUFFER ZONE G� N i
O
O�
PLANTING BED (4 ROWS TYP. ) \ �� Cj
-
1 2" LOOPED DRIP LINE TYP. 1-1/2" HEADER SUPPLY LINE ♦ ss \ \ X
(TYP.) 5P N
N � ` \ O� \ N
- - - - _ 2" LOOPED RECYCLE SUPPLY LINE (SEE PLAN) ♦ ♦ \ °���o RE I/lEW COPY
- - - � SUBJEC l TO REVISION
♦ Is, NO T FINAL
THIS N077CE
rREMOVEDO BE N
COMPLE77ONOF MAP AND PON E
AGENCY/CLIENT APPROVAL OF MAP 0
VARIES (SEE PLAN)
0
60 30 0 60 0
i
TM.164Z /N.741V1/V67 U/tYra
691t11P9S1rFS.1rf-PZ741V SCALE: 1"=60'
CoCO SUSTAINABLE FARM DESIGNED UNDER THE DIRECTION OF: NO. REVISIONS BY APP DATE SHEET
APN 159 -140-051 POZTION PCL C 91 �M 41 pfESS/�,�
Planning 2655 Stanwell Drive, SUITE 105 A PROJECT OF AgLantis ���oe�FalGfFyc a
Surveying & Mapping Concord, CA 94520 MICHAEL E. MILANI DATE Q�' F� E
Land Development Engineering R.C.E. No. 35121 REGISTRATION EXPIRES 9-30-19 co
U y m 1 0
Municipal Engineering
& Associates P.O.BSALADS FO� LS OX 5966 P.L.S. No. 5311 REGISTRATION EXPIRES 12-31-19 w z �
� No.35121 0
Concord, CA 94524 DESIGN: MEM EXP. 30 19 Construction Staking JOB NO: 1050
1-11
Construction Management MILANI Phone: (925) 674-9082 TITLE 22 EXHIBIT �1q �/vIL '��
DRAWN: MEM DATE: 01/25/2018 F pF CA%oi OF SHEETS
Fax: (925) 674-9279 CCCSD CONTRA COSTA COUNTY CALIFORNIA CHECKED: KRA SCALE: AS SHOWN
February 14, 2018 Special REEP Committee Meeting Agenda Packet- Page 80 of 83