HomeMy WebLinkAboutEngineering & Operations MINUTES 02-02-18 Page 2 of 12
CENTRALSAN
CONTRACENTRAL •STA SANITARY DISTRICT 5019 IMHOFFPLACE,
REGULAR MEETING OF THE BOARD OF DIRECTORS:
CENTRAL CONTRA COSTA JAMES A.NEJEDLY
SANITARY DISTRICT President
ENGINEERING & OPERATIONS DAPrDRAMS
PresideentntProrn Tem
COMMITTEE PAUL H.CAUSEY
MICHAEL R.MCGILL
TAD J.PILECKI
MINUTES PHONE: (925)228-9500
FAX: (925)372-0192
Friday, February 2, 2018 mm.centralsan.org
9:00 a.m.
2nd Floor Conference Room
5019 Imhoff Place
Martinez, California
Committee:
Chair Paul Causey
Member Mike McGill
Staff.•
Roger S. Bailey, General Manager (arrived during Item 3.a.)
Ann Sasaki, Deputy General Manager
Jean-Marc Petit, Director of Engineering and Technical Services
Edgar Lopez, Capital Projects Division Manager
Neil Meyer, Plant Maintenance Division Manager
Sasha Mestetsky, Senior Engineer
Don Parker, Provisional Plant Maintenance Superintendent (left after item 3.b.)
Damasio Zepeda-Aragon, Associate Engineer (left after Item 3.a.)
Cindy Granzella, Senior Administrative Technician
1. Call Meeting to Order
Chair Causey called the meeting to order at 9:00 a.m.
2. Public Comments
None.
3. Items for Committee Recommendation to Board
a.* Review draft Position Paper to award a construction contract and
authorize the General Manager to execute contract documents subject to
February 15, 2018 Regular Board Meeting Agenda Packet- Page 80 of 93
Page 3 of 12
Engineering &Operations Committee Minutes
February 2, 2018
Page 2
submittal requirements with [Company Name] for the construction of the
Walnut Creek Sewer Renovations, Phase 12, District Project 8435
Mr. Lopez stated that the bid opening took place on February 1, 2018, and
he distributed a revised draft Position Paper(attached). He explained that
there is a table in the Position Paper showing the financial impact, but he
will update it to better show from where the funds for this project are being
transferred. In response to a question from Chair Causey, Mr. Lopez
explained that this project was combined with another project for efficiency
and the scope has also changed, adding more linear feet of piping to be
replaced under this project. Chair Causey asked that that information be
included in the final Position Paper.
Chair Causey requested a summary showing the movement of money
from different projects, and combinations of projects. He also expressed
his concern about future Capital budgeting and possible increases.
COMMITTEE ACTION: Reviewed and recommended Board approval.
b.* Review draft Position Paper to authorize the General Manager to amend a
services agreement with J.T. Thorpe & Son, Inc. in an amount not to
exceed $11,500, bringing the cost ceiling to $103,800, for repairs to the
multiple hearth furnace refractory
Mr. Meyer reviewed the information included in the agenda materials,
showed pictures of the furnace needing repairs (attached), and responded
to questions.
COMMITTEE ACTION: Reviewed and recommended Board approval.
4. Other Items
a. Receive list of Scheduled/Parking Lot items
Mr. Petit stated that tours of the pump stations will be scheduled soon. He
also stated that staff will present the Committee with information on the
Fiscal Year 2018-19 Capital Improvement Budget(CIB) and Ten-Year
Capital Improvement Plan (CIP) on February 20, 2018, in advance of the
March 8 Board Financial Planning Workshop.
COMMITTEE ACTION: Received the information.
5. Announcements
a. Mr. Lopez announced that staff will bring a draft Position Paper to the
Committee for the Clearwell project, at which time the Committee will be
able to review the budget for repairs.
February 15, 2018 Regular Board Meeting Agenda Packet- Page 81 of 93
Page 4 of 12
Engineering &Operations Committee Minutes
February 2, 2018
Page 3
6. Future Scheduled Meetings
a. Tuesday, February 20, 2018 at 9:00 a.m.
Tuesday, March 13, 2018 at 9:00 a.m.
Wednesday, April 25, 2018 at 9:00 a.m.
7. Suggestions for future agenda items
None.
8. Adjournment— at 10:03 a.m.
* Attachment
February 15, 2018 Regular Board Meeting Agenda Packet- Page 82 of 93
Page 5 of 12
2/2/2018 Item Coversheet
Item 3.a.
(Committee Handout)
p[ 9&[F7CENTRAL' SAN BOARD OF DIRECTORS
POSITION PAPER
MEETING DATE: FEBRUARY 15,2018
SUBJECT: AWARD A CONSTRUCTION CONTRACT AND AUTHORIZE THE GENERAL MANAGER TO EXECUTE
CONTRACT DOCUMENTS SUBJECT TO SUBMITTAL REQUIREMENTS WITH CALIFORNIA
TRENCHLESS,INC.FOR THE CONSTRUCTION OF THE WALNUT CREEK SEWER RENOVATIONS,
PHASE 12,DISTRICT PROJECT 8435
SUBMITTED BY: INITIATING DEPARTMENT:
DAMASIO ZEPEDAARAGON,ASSOCIATE ENGINEER ENGINEERING AND TECHNICAL SERVICES-CAPITAL
PROJECTS
REVIEWED BY: SASHA MESTETSKY,SENIOR ENGINEER
EDGAR J. LOPEZ,CAPITAL PROJECTS DIVISION MANAGER
JEAN-MARC PETIT,DIRECTOR OF ENGINEERING AND TECHNICAL SERVICES
ISSUE
On February 1,2018,three bids were received for the construction of the Walnut Creek Sewer Renovations,Phase 12,District
Project 8435(Project).The Board of Directors(Board)must award the contract or reject bids within 50 days of the bid opening.
BACKGROUND
The Project is part of the ongoing sewer renovation within the Collection System Program of the Capital Improvement Budget(CIB)to
replace or rehabilitate deteriorated sewer infrastructure that is In poor condition.This work Is coordinated with local jurisdictions,
cities,utilities,and private property owners and tenants.
The scope of work for the Project consists of replacement or rehabllltation of approximately 9,000 feet of sewer mains,primarily 6-
Inch clay sewers,construction of manholes,and other related work within public rights-of-way and easements.The Project is located
within the Saranap area of unincorporated Walnut Creek,as identified in Attachment 1.
Central San staff prepared the plans and specifications for the Project.The Engineer's estimate for construction is$3,200,000.This
Project was advertised on January 19,and 24,2018.Three sealed bids ranging from$3,380,975 to$3,658,455 were received and
publicly opened on February 1,2018.The Engineering and Technical Services Department conducted a technical and commercial
review of the bids and determined that California Trenchless,Inc.is the lowest responsive and responsible bidder.References were
provided for California Trenchless, Inc.and staff received satisfactory feedback.A summary of bids received is shown in Attachment
2.Central San will administer the construction contract and provide construction management,resident engineering,Inspection,
survey,administration and submittal review.Consultant inspection will be used to supplement staff on an as-needed basis.
CEQA:
Staff has concluded that this Project is exempt from California Environmental Quality Act(CEQA)under Central San CEQA
Guidelines Section 15302,because it involves replacement of existing facilities at substantially the same locations and with the same
purpose and level of activity as the facilities being replaced.Any capacity Increases are for non-growth inducing,wet weather
purposes.The Project also is exempt under Central San CEQA Guidelines Section 15061(b)(3),since It can be seen with certainty
that there is no possibility that the activity in question may have a significant effect on the environment.This certainty is based on
Central San's experience with numerous sewer construction projects of this nature,the relatively short distance involved,and Central
San's mitigating construction specifications.These specifications are standardized general and special conditions that are made part
of the Project bid documents to address environmental considerations,such as protecting trees and riparian areas,as well as
compliance with applicable federal,state,county,district,municipal and local laws,ordinances,orders,and regulations.Approval of
this Project will establish the Board of Directors'Independent finding that this Project is exempt from CEQA.
https://centralsan.novusaganda.com/AgendaWeb/CoverShoet.aspx7itemiD=859 112
February 15, 2018 Regular Board Meeting Agenda Packet- Page 83 of 93
Page 6 of 12
2/2/2018 Item Coversheet
ALTERNATIVES/CONSIDERATIONS
Reject all bids,which is not recommended.Delaying or postponing the sewer replacement work is not recommended since several
sites have been coordinated with the public and Contra Costa County's upcoming 2018 paving plan.
FINANCIAL IMPACTS
The total estimated Project cost is$4,550,000,including planning,design,bid price,contingency,construction management,and
consultant costs as detailed In Attachment 3.This Project is included In Fiscal Year(FY)2017-2018 CIB on page 130 with a total
estimated project budget of$4,100,000.The additional budget required,$450,000,will be included In the proposed FY 2018-2019
CIB and funded by the Collection System Sewer Renovation Program-Phase 1,District Project 8451.
Amount
® Funds budgeted this FY 2017-18 for this project $4,100,000
❑ Funds taken from current FY 2017-18 CIB contingency $0
Funds transferred from current FY 2017-18 projects:
0 a.Updated forecast;estimated savings from project available $450,000
❑ b.Acceleration of funds for project that Is budgeted in future year $0
c.Potential future year budget impact
❑ (May be mitigated through(1)savings from close-outs of current year $0
projects;(2)repdodUzing future year projects;(3)cost savings on
future year projects)
Total Current Year Cost $4,550,000
COMMUNITY OUTREACH
Central San held a public meeting on January 11,2018,at the Collection System Operations Department building in Walnut Creek to
assist with any questions or concerns by the residents along the proposed construction alignments.In addition,staff has notified and
met with several easement homeowners directly to discuss the upcoming sewer work,construction impacts,project schedule,and to
receive input.
COMMITTEE RECOMMENDATION
The Engineering and Operations Committee reviewed this Project at the meeting on February 2,2018,and recommended approval of
the Project.
RECOMMENDED BOARD ACTION
Staff recommends the following:
1. Find that the Project is exempt from CEQA;
2. Award a construction contract in the amount of$3,380,975 for the construction of the Walnut Creek Sewer Renovations,Phase
12, District Project 8435,to California Trenchless,Inc.,the lowest responsive and responsible bidder;and
3. Authorize the General Manager to execute the Contract Documents subject to submittal requirements and Include up to a seven
and one-half percent contingency.
ATTACHMENTS:
C.e"CI Ir.tr.,
1. Project Location Mao
2.Summary of Bids
3.Post-Bid/Preconstruction Estimate
https://centralean.novusagenda.com/AgendaVVeb/CoverSheaLespx?ltemlo=859 2/2
February 15, 2018 Regular Board Meeting Agenda Packet- Page 84 of 93
Page 7 of 12
.0'
'�A ETI
ProjectAreas
24 t `�
V
S RU i R
0101
p FVA•L-L
0 3,600 � ` �
Feet � \
Walnut Creek Sewer Renovations Phase 12 Attachment
CENTRAL SAN District Project 8435 1
m-YADIME41AN Project Location
February 15, 2018 Regular Board Meeting Agenda Packet- Page 85 of 93
Page 8 of 12
ATTACHMENT 2
WALNUT CREEK SEWER RENOVATIONS, PHASE 12
DISTRICT PROJECT 8435
SUMMARY OF BIDS
PROJECT NO.: 8435 NO. OF ADDENDA: 1 DATE/TIME: FEBRUARY 1. 2018111AM
PROJECT NAME: WALNUT CREEK SEWER RENOVATIONS, PHASE 12
PROJECT MANAGER: DAMASIO ZEPEDA ARAGON
PROJECT LOCATION: 5019 IMHOFF PLACE MARTINEZ, CALIFORNIA
ENGINEER'S ESTIMATE: $3.200,000
NO. BIDDER BID PRICE
1 California Trenchless, Inc. $3,380,975
Hayward, California
2 K.J. Woods Construction, Inc. $3,438,000
San Francisco, California
3 Cratus, Inc. $3,658,455
San Francisco, California
BIDS OPENED BY: /s/ Donna M. Anderson DATE: February 1, 2018
February 15, 2018 Regular Board Meeting Agenda Packet- Page 86 of 93
Page 9 of 12
ATTACHMENT 3
WALNUT CREEK SEWER RENOVATIONS, PHASE 12
DISTRICT PROJECT 8435
POST-BID/PRECONSTRUCTION ESTIMATE
% Of
No. Item Description Amounts Construction
Cost
1. CONSTRUCTION
a. Construction Contract $3,380,975
b. 7.5% Contingency $253,525
c. Permits $35,000
SUBTOTAL—CONSTRUCTION COST $3,669,500 100%
2. CONSTRUCTION MANAGEMENT
a. District Forces
-Construction Management $145,000
(Engineering, Survey)
-Public Relations/Right of Way $25,500
b. Consultants
- Material Testing/Geotechnical/Others $40,000
- Inspection $120,000
SUBTOTAL-CONSTRUCTION MANAGEMENT $330,500 9%
3. PREBID EXPENDITURES
a. Engineering (Design, Survey, Drafting) $550,000
SUBTOTAL- PREBID EXPENDITURES $550,000 15%
4. TOTAL ESTIMATED PROJECT COST $4,550,000
February 15, 2018 Regular Board Meeting Agenda Packet- Page 87 of 93
Page 10 of 12
Item 3A
(Committee Handout)
Ty
FURNACE TURNAROUND 2017
E&O Committee
February 2, 2018
Neil Meyer, Plant Maintenance Division Manager
- -- 1 1
LOW BID: JT THORPE & SON, INC.
ORIGINAL: $92,300
AWARD CONTRACT TO JT THORPE ON
11 /16/2017
ADDITIONAL: $11 ,500 FOR VOIDS FOUND
LHE
UND REFRACTORY BLOCKS AND STEEL
LL
1
February 15, 2018 Regular Board Meeting Agenda Packet- Page 88 of 93
Page 11 of 12
2/6/2018
BURNER BLOCK REFRACTORY CRACKS AND VOIDS
4 r
04
r "
r
M _ 1
2
February 15, 2018 Regular Board Meeting Agenda Packet- Page 89 of 93
Page 12 of 12
2/6/2018
QUESTIONS?
3
February 15, 2018 Regular Board Meeting Agenda Packet- Page 90 of 93