HomeMy WebLinkAbout04.a. Receive update on Dublin San Ramon Services District -East Bay Municipal Utility District Recycled Water Authority (DERWA) requestPage 1 of 7
Item 4.a.
S
Central Contra Costa Sanitary District
December 18, 2017
TO: REAL ESTATE, ENVIRONMENTAL AND PLANNING COMMITTEE
FROM: MELODY LABELLA, RESOURCE RECOVERY PROGRAM MANAGER
REVIEWED BY: JEAN -MARC PETIT, DIRECTOR OF ENGINEERING AND TECHNICAL
SERVICES
ROGER S. BAILEY GENERAL MANAGER
SUBJECT: RECEIVE UPDATE ON DUBLIN SAN RAMON SERVICES DISTRICT -EAST
BAYMUNICIPAL UTILITYDISTRICT RECYCLED WATERAUTHORITY
(DERWA) REQUEST TO DEVELOP A MEMORANDUM OF
UNDERSTANDING FORA PILOT PROJECT TO DIVERT RAW
WASTEWATER FROM CENTRAL SAN'S SERVICE AREA FOR THE
PURPOSE OF PRODUCING RECYCLED WATER TO MEET DERWA'S
PEAK SUMMER IRRIGATION DEMAND
Background
In January2017, Central San received a letterfrom the Dublin San Ramon Services District (DSRSD) —
East Bay Municipal Utility District (EBMUD) Recycled Water Authority (DERWA) requesting development
of a memorandum of understanding (MOU) to explore a potential partnership and pilot project to divert a
portion of the raw wastewater from Central San's San Ramon Pump Station between May and September
every year. The wastewater would be diverted through DSRSD's existing collection system to DSRSD's
treatment plant, for the purpose of producing and distributing recycled water to meet DERWA's peak
summer irrigation demand. According to the letter, DERWA made this request due to the need for a
temporary supplemental supply to help meet recycled water demands in the EBMUD and DSRSD
service areas until wastewater flows increase with development and other long-term options are identified.
n March 2017, staff brought this issue to the REEP Committee for discussion. At that meeting, the
Committee indicated that additional information is needed to determine how to divert the water and what
the impacts would be to Central San. The Committee directed staff to continue strategizing with DERWA
and return with a proposed plan at a future Committee meeting.
Central San staff has been working with DSRSD staff to evaluate diversion options, in addition to having
internal discussions on how the potential diversions will impact Central San's operation and future recycled
water projects. Staff is returning to update the Committee on these efforts.
Diversion Alternatives
n October 2017, DSRSD staff, with support from their consultant West Yost, presented five diversion
December 18, 2017 REEP Committee Meeting Agenda Packet - Page 5 of 31
Page 2 of 7
alternatives to Central San staff, which ranged from a simple gravity diversion using the existing
emergency overflow interconnection between Central San's and DSRSD's collection system, to building a
DERWA pump station adjacent to Central San's. Central San and DSRSD staff worked together to
narrow these five alternatives down to two gravity diversion options and further refine the interconnection
and operational details for each. Central San's Engineering and Operations staff have been meeting
internally to review these two alternatives, evaluate their potential impacts, and determine how the potential
impacts could be mitigated.
Diversion Alternative 2 would divert all the incoming dry weather wastewater flow to the San Ramon Pump
Station by modifying the existing overflow interconnection between Central San's and DSRSD's collection
systems. This option would involve closing the influent gate into the pump station, which has been pinned
open (not exercised) since the 1990s, when a large sanitary sewer overflow to the adjacent creek occurred
due to that gate failing to open fully after being temporarily closed. Diversion Alternative 4 would modify
the existing emergency overflow interconnection between Central San's and DSRSD's collection system
to divert approximately 1.5 million gallons per day (MGD) of dry weather flow from the west side of the San
Ramon Pump Station. Schematics of the two diversion alternatives are presented in Attachments 1 and 2.
An overview of the two diversion alternatives, including DERWA pros and cons and Central San
operational and policy concerns, are presented in Attachment 3.
Discussion
While Central San is highly supportive of expanding the beneficial reuse of its wastewater, there are
significant consequences that could result from allowing DERWA to divert Central San's raw wastewater
supply. I n particular, staff's biggest concern is that once DERWA comes to rely on Central San's
wastewater flow, it will always be reliant upon it, making it unavailable for large-scale recycled water
projects at Central San's main treatment plant. For example, during dry weather drought conditions,
Central San has approximately 25 MGD of wastewater available for producing additional recycled water.
The Refinery Recycled Water Project demand is 20 MGD; however, 24 MGD would be needed to yield
20 MGD of recycled water due to the production efficiency of advanced treatment processes. Beyond
that, Central San would need additional treated wastewater to dilute the concentrated brine created from
the reverse osmosis process prior to discharge, requiring even more wastewater flow. I n other words,
Central San is going to need every drop of wastewater in the summer months in order to reliably serve the
full Refinery Project.
When asked about the length of time DERWA would need Central San's raw wastewater supply, DSRSD
staff has indicated that it would be until enough additional wastewater is generated from new development
in the areas that DSRSD serves. According to DSRSD's Master Plan, it will take approximately 10 years
to generate the amount of wastewater that would be diverted under Diversion Alternative 4 and even longer
to replace the amount of wastewater that would be diverted under Diversion Alternative 2.
Conclusion
Due to the significance of the potential operational and policy -related impacts that could result from
Diversion Alternatives 2 and 4, staff recommends not moving forward on any permanent infrastructure
modifications to allow for the diversion of Central San's raw wastewater to DERWA. However, if the
Committee wishes to pursue this request from DERWA further, a diversion pilot project could be
considered. A temporary sump pump could be installed in the bottom of Central San's manhole (manhole
11) immediately upstream of the interconnection with DSRSD's collection system to lift a portion of
the wastewater from Central San's collection system into DSRSD's collection system. Conducting this
pilot would allow DERWA to obtain additional wastewater flow, while allowing Central Santo evaluate
localized and system -wide impacts without significant investment by DERWA.
Staff looks forward to discussing this updated information and receiving your direction at the December
December 18, 2017 REEP Committee Meeting Agenda Packet - Page 6 of 31
Page 3 of 7
18, 2017, REEP Committee meeting.
GOAL ONE: Provide Exceptional Customer Service
Strategy 2 - Improve Interdepartmental Collaboration
GOAL SIX: Embrace Technology, Innovation and Environmental Sustainability
Strategy 1 - Augment the Region's Water Supply
ATTACHMENTS:
1. Attachment A - Schematic of Diversion Alternative 2
2. Attachment B - Schematic of Diversion Alternative 4
3. Attachment C - Overview of Diversion Alternatives 2 & 4
December 18, 2017 REEP Committee Meeting Agenda Packet - Page 7 of 31
ATTACHMENT A
MH
17 24" VCP
I
L4- Force iviain la rurue iviain
Surge N
Tank
101
MH
--———————————————— — — — —_ _ _ _ _
18" Sewer 11
10/17/2017
v
�
o
J
�
L
I
L4- Force iviain la rurue iviain
Surge N
Tank
101
MH
--———————————————— — — — —_ _ _ _ _
18" Sewer 11
10/17/2017
ATTACHMENT B
17 24" VCP '
MH _ _ _ _ MH
18" Force Main 16 15
Oil LARWIN '
14" Force Main PUMP STATION
12" Force Main
Surge
14 O 18" Force Main Tank N
24" Force Main 00
New
1 High Existing 18" Plug
Manhole 10 Level Valve
L Bypass
4 DSRSD
MH
MH
-----------------
18" Sewer 11 � 18" Sewer —�
'A,— � -4,,— - -
11/13/2017
Page 6 of 7
Attachment C — Overview of Diversion Alternatives 2 and 4
DERWA
Alternative
Description
Construction
Requirements
DERWA Pros
DERWA Cons
Central San Operational and Policy Concerns
2
Gravity Bypass of
New high-level overflow
. No new creek crossing
• Poor flow control
This option is not recommended by staff for further consideration due to the following
Existing PS by Closing
line from manhole (MH)
• Does not require a new
• No flow metering
concerns.
Inlet Gate and Raising
#10 back to the pump
MH
Hydraulic Grade
station
. CCCSD can schedule
Operational Concerns:
maintenance activities
inside pump station for
An overflow at this Pump Station many years ago led to commitments made by
months when gate is
Central San to San Ramon's City Council to prevent future overflows. As a result,
closed and risk of
the Pump Station's inlet gate was pinned open at the direction of Central San's
overflow is lowest
management at that time. Serious concerns about closing the inlet gate and
causing another overflow, should the gate not fully reopen. If a new inlet gate is
proposed, there is the same concern that the gate could fail in a closed or partially
closed position causing an overflow.
• Unknown upstream hydraulic impacts by doing gravity diversion. We have not
modeled this scenario to see the resulting hydraulic grade line (HGL). The
estimated impact on the new upstream HGL rising by 5 feet was developed by
DERWA's consultant and needs to be validated by Central San.
• Taking all the dry weather flow would result in keeping the Pump Station offline,
crippling its ability to respond quickly to a rapid increase in incoming flow should
the new diversion become blocked.
• Potential for deposition in the inverted siphon during low flows (night).
• Potential downstream gravity sewer impacts due to less flow and possible solids
deposition.
• Potential forcemain odors and corrosion issues due to not being operated and no
corrosion/odor control operating. Potential issues with valves on forcemain piping.
• Requires extra resources (staff and materials) to address flushing and odor
concerns with the forcemains and gravity sewers. Difficult to predict exactly how
much until in operation.
• Reduced flow creates further challenges with operating the existing wastewater
treatment plant during low flow conditions and challenges with implementing future
nutrient removal and recycled water facilities (less water available impacts both
operation and storage needs).
Policy Concerns:
• Diverting this flow will reduce the volume of treated wastewater available at
Central San's treatment plant, which would reduce the volume available to serve
the Refinery Project and to diluting the resulting brine, making the project more
expensive (due to added storage) and possibly infeasible to fully implement.
• Diverting the flow reduces volume for all recycled water projects and customers
and may trigger more expensive recycled water projects all around.
• Possible impact on pump zone fee currently in development.
• Possible long-term service area implications
Page 1 of 2
December 18, 2017 REEP Committee Meeting Agenda Packet - Page 10 of 31
Page 7 of 7
Attachment C — Overview of Diversion Alternatives 2 and 4
DERWA
Alternative
Description
Construction
Requirements
DERWA Pros
DERWA Cons
Central San Operational and Policy Concerns
4
Gravity Diversion at
• New MH between MH 11
• No new creek crossing
• Only flow from MH
This option is not recommended by staff for further consideration due to the following
MH 11
and MH 10
• Maintains ability for high-
11 is available for
concerns.
• New 18" sewer pipe from
level gravity bypass to
diversion
MH 10 to DSRSD MH
DSRSD in the event of a
• Poor flow control
Operational Concerns:
• New 18" sewer pipe from
failure at the Pump
• No flow metering
MH 10 to the new MH
Station
• This alternative may be technically feasible but there are many concerns that need
• Fill 18" sewer between
• No modifications to the
to be further explored and addressed. Overall there are risks and challenges we
MH 11 and new MH
existing Pump Station
will not be able to identify until a diversion is operational.
• New gate valves in
• All construction on the
• This option will divert half the flow coming into the Pump Station, which would
gravity sewer lines
trail side of the creek
require operating the existing pumps in a way that we do not currently operate.
Increased wear and potential pump issues with cycling pumps with variable
frequency drives that are oversized for the reduced flow. May require new pumps
and controls, which there may not be enough space for. Replacing existing
pump(s) with smaller ones is not acceptable because it would impact the reliable
pumping capacity for the pump station.
• Odors are a major concern for residents in this area. Increasing residence time in
the Pump Station (due to lower flows) could increase the potential for odors.
• New potential failure points (manholes and valves) being installed adjacent to a
creek would raise Central San's risk of overflows in an environmentally -sensitive
area.
• Installation of gate valves in gravity line not ideal, and hard to maintain or access in
the future. Valve access and maintenance is a concern. One risk is that we are
unable to open valve at end of summer and cannot convey wet weather flows to
the pump station.
• Reduced flow creates further challenges with operating the existing wastewater
treatment plant during low flow conditions and challenges with implementing future
nutrient removal and recycled water facilities (less water available impacts both
operation and storage needs).
Policy Concerns:
• Diverting this flow will reduce the volume of treated wastewater available at Central
San's treatment plant, which would reduce the volume available to serve the
Refinery Project and to diluting the resulting brine, making the project more
expensive (due to added storage) and possibly infeasible to fully implement.
• Diverting the flow reduces volume for all recycled water projects and customers
and may trigger more expensive recycled water projects all around.
• Possible impact on pump zone fee currently in development.
• Possible long-term service area implications
Page 2of2
December 18, 2017 REEP Committee Meeting Agenda Packet - Page 11 of 31