HomeMy WebLinkAbout04.a. Receive mid -year construction update for Fiscal Year (FY) 2017-18Page 1 of 6 Item 4.a. Central Contra Costa Sanitary District December 12, 2017 TO: ENGINEERING AND OPERATIONS COMMITTEE FROM: EDGAR J. LOPEZ, CAPITAL PROJECTS DIVISION MANAGER REVIEWED BY: JEAN -MARC PETIT, DIRECTOR OF ENGINEERING AND TECHNICAL SERVICES ROGER S. BAILEY, GENERAL MANAGER SUBJECT: RECEIVE MID -YEAR CONSTRUCTION UPDATE FOR FISCAL YEAR (FY) 2017-18 Staff presentation on highlights of several construction projects through Second Quarter of FY 2017-18. ATTACHMENTS: 1. Presentation December 12, 2017 EOPS Regular Committee Meeting Agenda Packet - Page 12 of 43 FISCAL YEAR 2017-2018 MID -YEAR CONSTRUCTION HIGHLIGHTS Engineering & Operations Committee December 12, 2017 Meeting Presented by Edgar J. Lopez, PE ,,,:_ — Capital Projects Division Manager COGEN OPTIMIZATION PROJECT • 100% Complete • Installed new catalyst to reduce carbon monoxide by minimum of 50%, assure regulatory compliance Cogen can operate at a higher output, 3,000 kW, or full load • Installed evaporative cooling to improve summer efficiency Page 2 of 6 1 December 12, 2017 EOPS Regular Committee Meeting Agenda Packet - Page 13 of 43 HEADWORKS SCREENING UPGRADE • 55% Complete and on schedule • Two new 1/4 -inch Bar Screens installed • All channels will have screens; four new and two refurbished • Washer/compactors and Screening Disposal System installed and operating iz SCRUBBER PILOT • 100% Complete • Sidestream treatment likely not required • Validated scrubber with bypass conditions • Gained valuable operations experience • Confirmed design criteria Page 3 of 6 2 December 12, 2017 EOPS Regular Committee Meeting Agenda Packet - Page 14 of 43 PUMP AND BLOWER SEISMIC UPGRADE • 85% complete, expected by end of February - on schedule • Majority of structural steel in place • Final shear walls being constructed • Roof connections done prior to rains • Major coordination needed for Mechanical, Electrical, and Controls relocation PLEASANT HILL - GRAYSON CREEK • 99% Complete • Stripping complete • Quitclaim easements • Minor punch -list ongoing • Preparing Notice of Completion Page 4 of 6 3 December 12, 2017 EOPS Regular Committee Meeting Agenda Packet - Page 15 of 43 Page 5 of 6 WALNUT CREEK SEWER, PHASE 11 • 100% Complete • Filed Notice of Completion • Renovated 9,100 feet of sewers in four months LAFAYETTE SEWER RENOVATIONS, PHASE 11 • 80% Complete • Via Robles Pump Station abandoned • Project includes 8,400 feet of sewers 4 December 12, 2017 EOPS Regular Committee Meeting Agenda Packet - Page 16 of 43 Page 6 of 6 MARTINEZ SEWER RENOVATIONS, PHASE 5 77 • 75% Complete r J ` • Project includes 8,700 feet of ` sewers QUESTIONS? 5 December 12, 2017 EOPS Regular Committee Meeting Agenda Packet - Page 17 of 43