Loading...
HomeMy WebLinkAbout04.b. Follow-up to June 20, 2017 discussion on evaluating earthquake insurance-targeted risk analysis to include flood and earthquake scenariosS November 21, 2017 TO: FROM: REVIEWED BY: Central Contra Costa Sanitary District ADMINISTRATION COMMITTEE SHARI DEUTSCH, RISK MANAGEMENT ADMINISTRATOR PHIL LEIBER, DIRECTOR OF FINANCE AND ADMINISTRATION ANN SASAKI, DEPUTY GENERAL MANAGER ROGER S. BAILEY GENERAL MANAGER Page 1 of 6 Item 4.b. SUBJECT: FOLLOW-UP TO JUNE 20, 2017 DISCUSSION ON EVALUATING EARTHQUAKE INSURANCE -TARGETED RISKANALYSIS TO INCLUDE FLOOD AND EARTHQUAKE SCENARIOS At the June 12, 2017 Administration Committee meeting, staff presented updated and comprehensive models for two earthquake hazards for the most at -risk Central San facilities. Staff also analyzed the value of earthquake insurance coverage for each facility and reported on flood and earthquake coverage purchased by other wastewater agencies. After much discussion, staff was asked to return with estimates to insure at -risk locations and facilities for both earthquake and flood damage. Staff subsequently updated the facilities list for both hazards and requested new pricing information from Central San's insurance broker. Pricing indications have come in as follows. Earthquake Insurance Table 1 shows the locations and facilities included in the earthquake pricing under the Haywired Scenario. The total insured value is $411,009,116. Earthquake insurance deductibles for all options are a minimum of $50,000 for the structure, and another $50,000 for the contents or 5% of the total value of each structure. For locations with more than one structure, multiple sets of deductibles would be applicable before coverage takes effect. Only structures valued at or above $1 million were included in the estimate. Given the total insured value and the deductible structure detailed above, Central San's insurance broker received the following pricing indications: Limit Price Range $5 million $120,000 - $145,000 $10 million $185,000 - $220,000 $25 million $275,000 - $330,000 $50 million $325,000 - $390,000 November 21, 2017 Regular ADMIN Committee Meeting Agenda Packet - Page 41 of 59 Page 2 of 6 Note that none of these options would fully insure Central San's most at -risk assets in case of total collapse/failure. However, for the Martinez campus structures, the modeling results indicate only a.02% chance of complete destruction from an earthquake. Buying coverage for the full value of the Martinez campus given this very low likelihood at the high cost involved would not appear to be cost effective. As a result, earthquake insurance (at the coverage levels indicated) would only be one tool used in Central San's overall risk financing strategy. Flood Insurance Table 2 shows the locations and facilities included in the flood insurance pricing. Since fewer structures are at risk of flooding than those exposed to earthquake damage, the list is much smaller. Unlike earthquake modeling, flood modeling is based on whether a structure is in a FEMA -designated flood zone. Furthermore, damage estimates will depend more on the construction type of the building, the value of contents and how high the water rises. Buildings in the 100 -year flood zone are generally at greater risk of flooding than buildings in the 500 -year flood zone, but a 500 -year flood would cause a wider damage footprint. Gravity has proven time and again that buildings with street level access to basements or subterranean portions would receive more flood damage than buildings with no below -grade facilities, regardless of flood zone. The total insured value for the six Central San facilities at greatest risk of flooding is over $43,000,000. The deductible is $50,000 per occurrence per location. However, the maximum limit for flood coverage is only $500,000 per building. The following shows the pricing for flood insurance for the six locations most likely to suffer flood damage. Limit Price Range $5 million $75,000 $10 million $95,000 As noted above, the total insured value of these locations exceeds $43,000,000. However, given that coverage for the eight buildings in the six locations covered are capped at $4 million ($500K multiplied by eight) there is no reason to purchase coverage above the $5 million limit. I n all circumstances, flood insurance will not cover underground structures or facilities below sea level unless they are within the footprint of a flood -insured structure. To illustrate this difference, consider that the underground pump room inside the Martinez Pump Station would be covered, while the tunnels at the Treatment Plant would not. Conclusion As noted earlier, these are pricing indications from Central San's insurance broker, based on discussions with flood and earthquake insurance underwriters. Should the Board wish to pursue one or more of these options, staff will complete formal applications and get firm quotes for the specified hazards. ATTACHMENTS: November 21, 2017 Regular ADMIN Committee Meeting Agenda Packet - Page 42 of 59 Page 3 of 6 1. Table 1 -Earthquake Scenario with EQ Coverage 2. Table 2 -Structures in Flood Zones with Flood Coverage November 21, 2017 Regular ADMIN Committee Meeting Agenda Packet - Page 43 of 59 Table 1 - Earthquake Scenario with EQ Coverage Haywired M7.5 Risk Weighted Exposure Potential Value of EQ Coverage Pumping Stations L/S Slight Moderate Extensive Complete Deductible per Site Slight Moderate Extensive Complete Moraga Pump Station 2 $377,113 $2,409,846 $883,654 $901,393 $1,751,978 $657,868 Orinda Crossroads Pump Station 1 $55,367 $1,240,020 $1,677,279 $204,433 $516,245 $723,775 $1,161,034 San Ramon Pump Station 1 $488,405 $2,392,705 $644,994 $922,719 $909,083 $1,483,623 $13,636 Martinez Pump Station 2 $256,127 $179,214 $3,393 $1,256,256 $1,005,407 $250,849 Force Mains 10 $600,000 $3,000,000 $4,500,000 $2,400,000 $1,200,000 Lower Orinda Pump Station 1 $44,244 $434,133 $268,921 $104,401 $153,757 $58,203 $280,376 $115,164 Headworks / MCCs $0 $2,865,266 $1,161,034 $264,485 Haywired M7.5 Risk Weighted Exposure Potential Value of EQ Coverage Martinez Campus US Slight Moderate Extensive Complete Deductible per Site Slight Moderate Extensive Complete HOB 1 $1,164,395 $814,820 $12,852 $3,427 $1,713,606 Plant Ops/PBB 1 $4,963,269 $3,473,193 $54,782 $14,609 $7,304,296 Primary Sed Tanks 1 $3,611,837 $2,527,488 $39,866 $10,631 $5,315,433 Chem Feed Bldg/ MCC22 1 $5,630,828 $3,940,336 $62,150 $16,573 $8,286,722 MRC 1 $905,266 $633,486 $9,992 $2,665 $1,332,253 Sub 16 1 $158,203 $110,707 $1,746 $466 $100,000 $58,203 $10,707 Headworks / MCCs 1 $729,834 $510,723 $8,056 $2,148 $1,074,075 Sub 81 1 $117,069 $81,923 $1,292 $345 $100,000 $17,069 Warehouse 1 $1,215,440 $850,540 $13,415 $3,577 $1,788,727 November 21, 2017 Regular ADMIN Committee Meeting Agenda Packet - Page 44 of 59 Sub 73 1 $1,811,462 $1,267,623 $19,994 $5,332 $100,000 $1,711,462 $1,167,623 Standby Power Bldg 1 $470,198 $329,035 $5,190 $1,384 $100,000 $370,198 $229,035 B&G Building 1 $270,586 $189,351 $2,987 $796 $100,000 $170,586 SCB 1 $939,369 $657,351 $10,368 $2,765 $1,382,442 Aeration Tank/UV Channel 1 $350,788 $245,474 $3,872 $1,032 $516,245 Sub 33 1 $160,555 $112,353 $1,772 $473 $100,000 Sub 17 1 $158,203 $110,707 $1,746 $466 $100,000 $58,203 $10,707 UV Building and UV Banks 1 $905,266 $633,486 $9,992 $2,665 $1,332,253 Emg Switchgear Bldg 1 $65,714 $45,985 $725 $193 $100,000 Filter Plant Forebay 1 $1,023,073 $715,925 $11,292 $3,011 $1,505,627 Sub 82 1 $270,586 $189,351 $2,987 $796 $100,000 $170,586 $89,351 Filter Plant Ops, Filters, Pipe Gallery 1 $729,834 $510,723 $8,056 $2,148 $1,074,075 Sub 40 1 $646,609 $452,484 $7,137 $1,903 Clearwell 1 $1,811,462 $1,267,623 $19,994 $5,332 Lab 1 $75,326 $52,712 $831 $222 Martinez * $2,556,308 $1,507,424 $0 $0 Combined * $2,556,308 $4,372,689 $1,161,034 $264,485 Damage Factors: Slight=25% Moderate=50% Extensive=75% Complete=100% Risk -Weighted Exposure = Probability of Damage x Cost of Damage November 21, 2017 Regular ADMIN Committee Meeting Agenda Packet - Page 45 of 59 Table 2 - Structures in Flood Zones with Flood Coverage FLOOD Flood Zone TIV Limit Per Building # Buildings Max Coverage Deductible Martinez PS X $4,689,936 $500,000 2 $1,000,000 $50,000 Moraga PS A $8,759,892 $500,000 2 $1,000,000 $50,000 Orinda Crossroads PS A $5,162,447 $500,000 1 $500,000 $50,000 San Ramon PS A $9,090,826 $500,000 1 $500,000 $50,000 Lower Orinda PS A $1,537,572 $500,000 1 $500,000 $50,000 Headworks / MCCs X $13,824,419 $500,000 1 $500,000 $50,000 $43,065,092 $4,000,000 $300,000 November 21, 2017 Regular ADMIN Committee Meeting Agenda Packet - Page 46 of 59