October 20, 1971
ERS OF THE BOARD OF DIRECTORS
G. A. Horstkotte, Jr., General Manager -Chief Engineer
PROBLEM: Request by E. E. Meredith of 75 Scenic Drive, Orinda,
for sharing the expense of pl mbing bill.
2. CKGROUND: After calling "Sewer Service of America" to relieve a
toppage in their line, it was determined that the problem was in
the main. A district crew responded to Mt. Meredith's call and re-
moved a root stoppage from the main.
. REC*ArNDATION: Mr. Meredith has amended his request to us because
of a reduction in his bill. His cost would be $29.45. I recommend
payment.''
Respectfully submitted,
•
R. H. Hinkiono
Superintendent of Field Operations,
Recommendation approved:
1-4,4; tip IA Witsv,
GiA.'Horstkotte„ Jr, ,
ene1 illanager -Chief, En. neer
gka
October 19, 1971
NEMODUM ,OR: Honorable Board of Directors
VIA: G. A. Horstkotte, Jr., General Manager -Chief Engineer
SUBJECT: Agenda Item
PROBLEM: Overflow, Mrs, I. Cadenasso
3718 Canyon Way
Martinez, Californi
228-4362
2. BACKGROUND: On Sunday, October 10, 1971, the District on-call crew
was called to relieve an overflow at the address mentioned above.
Upon arrival, the crew found the 6" existing easement line plugged
6' upstream from MH at side of #3718 toward MH at rearof#3715
Serrano Avenue. The stoppage consisted of root and grease and
was cleared with no difficulty. The damage was limited to the hall
carpet with pad. The District crew cleaned and di infected
throughout and an overflow device will be installed.
3. ALTE
ATIVES: Pay claim, refuse claim.
4. RECOMMENDATION: The total amount of this claim comes to $147.70
Thls includes replacement of rug and pad. I feel the claimant is
entitled to a settlement. It seems to be reasonable for this type
of damage.
Robert H. Hinkson
Superintendent of Field Operations
Recommendation Approved:
G. A..Ho
Genera
RHH:jv
stkotte, jr.'
mager -Chief Engineer
ME
VIA:
SUBJECT;
ru
October 181971.
FOR: Honorable Members of the Board of Directors
G. A. 'Horstkotte, Jr. -- General Manager --Chief Engineer
Approval of Plans, Specifications & Contract Documents
for District Sewering Project No. 2071, approximately
845 ft. of 12 inch sewer line to be relocated into the
new South Broadway extension. Estimated cost $21,360.00,.
PROBLEM: .The District's rights to maintain a 12" sewer line over
Southern Pacific Company land near the Walnut„Creek station will be
subordinate to a lease that the Broadway Shopping Center is acquiring
from the Southern Pacific Company for expansion of their two level
parking facilities.
2. BACKGROUND: The Southern Pacific Company's Walnut Creek station
property y's South Broadway street extension,
is beingsevered bythe cit,
the portion lying to the west of the street extension in which we have
a'pp'roximately 760 feet of 12” sewer pipe is to be leased to the
Broadway Shopping Center. Since the new street offers us better
alignment and access and there will be a city imposed moratorium on
street cuts, the time to relocate is during the street construction.
This project replaces a 22 year low standard clay pipe with a new
pipe on better alignment.
ALTS, IVES Wait until the Lessee builds over or otherwise obstructs
or confl,a ;ts with this sewer line and then acquire an easement to
relocate to avoid the conflict.
CO D.' ON Approval of this sewer relocation and authority to
complete plans and specifications and to advertise for construction bids.,
Respectfully submitted,
ac ndation Approved
G. 'A. .orstkotte;'
Griner bl manager -Chief ga,neer
t.
Jack L. Best
Office Engineer
VIA:
SUBJECT:
October 18, 1971
FOR: Honorable Members of the Board of Directors
G. A. 'Horshkotte, Jr. - General Manager -Chief Engineer
Approval of Plans, Specifications and Contract Documents
for District Sewering Project No. .1883. Approximately
4800 feet of 15, 18 & 21 inch Watershed 29 No. Trunk
Sewer Line in Walnut Blvd., 'Walnut Creek. Estimated
cost $195,100.00.
PROBLEM: The existing sewer line serving this watershed was installed
in 1949. The 15 and 18 inch line designed for single family dwellings
is over capacity. It was necessary to install a bypass to the trunk
several years ago.
2. BACKGw'MTJND: A large portion of the drainage area now has been rezoned
and has high density apartment buildings connected. There are others
under construction and all indications are that the trend will continue
at an accelerated rate. This was in 1963
anticipated by watershed
planning and two sections of the trunk have been constructed to date.
It is now necessary to complete the entire trunk due to increased
development. Watershed trunk charges will eventually repay the
District advance of funds.
RECOMMENDATION: Approval of Plans, Specifications and advertisement
for bids for construction of this line including acquisition of rights
of way before other, development preempts us.
Recoiamendation Approved;
G.
orstkotte,
General ager -Chief Eigi:eer
Respectfully submi°
d,
Jack L. Best
Office Engineer
BOARD OF DIRECTORS
CHARLES J. Gmas, President
DON L. ALLAN
PARKE L. BONEYSTEELE
RICHARD J. MEICIIELL
GEORGE A. RUSTIGIAN
NTRAL CONTRA CO
SANITARY ICT
1250 SPRINGBROOK ROAD
MAILING ADDRESS; P.O. BOX 5266
WALNUT CREEK, CALIFORNIA 94596
TEL. 934-5727 AREA CODE 415
October 12, 1971
The District Board
Central Contra Costa Sanitary District
Walnut Creek, California
Re: Job No. 1883
Gentlemen:
G. A. HORSTK.OTFE, 111,
General Manager—Chiej Engineer
ERNEST K. DAVIS
Secretary
Submitted herewith is a detailed estimate of the cost of work in
accordance with Plans and Specifications for District Sewering Project
No. 1883,
Item Quantity Description
Un
Price
Total
1 1,728 1.f. 21" Pipe $ 32.00 $ 55,296.00
2 2,138 1.f. 18" Pipe 28.00 59,864.00
3 935 1.f. 15" Pipe 22.00 20,570.00
4 8 each 60" Trunk Manhole 1,000.00 8,000.00
5 3 each 48" Standard Manhole 650.00 1,950.00
6 200 1.f. 4" Side Sewer Relay 10.00 2,000.00
7 30 1.f. 6" Side Sewer Relay 14.00 420.00
Estimated Construction Cost
Contingencies, 5%
Seal Coat
Incidentals, 20%
Yours very truly,
CENTRAL CONTRA COSTA SANITARY DISTRICT
ors k t e,
Gen ral Manager -Chief Engineer
GAH:ms
JLB
$148,100.00
7,400.00
10,000.00
29,600.00
$195,100.00
October. 14, 1971.
Recorder
Contra Costa County.
Martinez, California 94553
Dear Sir:
Please record the enclosed Grant of Easement and return it
to this office.
job No. 2060
EK.J:jf
Enci
Parcel NO. 1 UC Psychiatric Hospital
'TOUTS very truly,
CENTRAL CONTRA COSTA. SANITARY DISTRICT
E. K. Davis
Secretary
M:0
VIA:
SUBJECT:
;
October 14, 1971
FOR: THE ONO LE
113 ;
ERS OF THE BO
OF DIRECTO
G. A. Horstkotte, Jr., General Manager -Chief Engineer
District Sewering Project No. X1564 A, Right of Way,
Moraga Way, Orinda
L PROBLEM: Portion of existing facilities collapsed and a new ali ut is
required, which requires abandonment of portion of existing eements (L.I.D.
No. 14) and securing new e ements. The new e emeuts have been secured and
are hereby offered for acceptance, at no cost to the Didtrict.
2.
a. The easements being Quit Claimed, under L.I.D. are as follows:
Leroy C. Smith, Parcel No. 92
Robert H. Mayard, Parcel No. 100-A
Robert O. Pearle, Parcel - Misc.
Thomas S. Capener, Parcel - Misc.
b. The easements under consideration for acceptance, under D.S.P.
X1564A, are as follows:
Leroy C. Smith, Parcel No. B
bert L. Miliham, Parcel No. F
omas S. Capener, Parcel No, G
Robert O. Pearle, Parcel No. H
Robert E4 Maynard, Parcel No. J
BACKGROUND: See excerpt of Mantes (Board meeting held May 20, 1971)
attached. The Board adopted Resolution No. 3046, declaring an emergency
and authorizing work without competitive bid an Moraga Way, Orinda.
.RECO TION:: Approve and execute Quit Claim Deeds. Accept easements.
Recommendation approved:
.))51444t
G. tkotte,
General Manager -Ch
JLB:ms
AEG
Attach.
Respectfully submitted,
/0(
October 8, 1971
D,' TO: Honorable Board of Directors
VIA: G. A. Horstkotte, jr. - General Manager -Chief Engineer
HJJECT: Manhole Riser Ring Authorization
. PROBLEM: The City of Pleasant Hill and Contra Costa County have,
underway, extensive street overlay jobs; 100 , nholes will need
adjusting. Total cot for adjustment rings will run $4,000.00
2. BACKGROUND: This type of project is generally not included in our
budget because we don't receive the information in time. We do
have $3,000,00 previously authorized. If we add $1,000.00 to
these funds, we will have enough for this work.
3. RECOMMENDATION: Authorize $1,000.00 from sewer construction for
the purd4 e of manhole riser rings.
Recommendation Approved:
Genera
jv
V tA
rstkotte, Jr.
Manager -Chief
Robert H. Hinkson
Superintendent of Field Operations