Item 18.
CENTRAL SAN BOARD OF DIRECTORS
POSITION PAPER
MEETING DATE: AUGUST 3, 2017
SUBJECT: DECLARE AN EMERGENCYAND CONSIDER ADOPTING RESOLUTION
N0. 2017-027 MAKING FINDINGS AND AUTHORIZING THE GENERAL
MANAGER UNDER PUBLIC CONTRACT CODE 22050(6)TO EXECUTE A
CONSTRUCTION CHANGE ORDER WITH W.M. LYLES CO. TO PERFORM
EMERGENCY WORK ON THE TREATMENT PLANT PRIMARY
SEDIMENTATION TANKS. REVIEWED BY ENGINEERING & OPERATIONS
COMMITTEE.
SUBMITTED BY: INITIATING DEPARTMENT:
EDGAR J. LOPEZ, CAPITAL PROJECTS ENGINEERING AND TECHNICAL SERVICES-
DIVISION MANAGER CAPITAL PROJECTS
REVIEWED BY: JEAN-MARC PETIT, DIRECTOR OF ENGINEERING AND TECHNICAL
SERVICES
ANN SASAKI, DEPUTY GENERAL MANAGER
Roger S. Bailey Kenton L.Alm
General Manager District Counsel
ISSUE
Declaring an emergency under Public Contract Code Section 22050(b) is required to contract without a
formal public bid process. Board of Directors (Board)approval is also required to execute a construction
contract change order in an amount exceeding $100,000.
BACKGROUND
August 3, 2017 Regular Board Meeting Agenda Packet- Page 123 of 132
Page 2 of 10
1 n August of 2016, the sludge collector system in Primary Sedimentation Tank(PST) No. 4 experienced a
failure. This system includes the drive, chains, and collector flights, embedded floor and return rails,
shafts, sprockets, and other mechanical components. Staff replaced the flights and chains and then
conducted a condition assessment. It was noted that the floor rails should be replaced in a near-term
project. The rails are original construction, and have been in place since the 1960's and 1970's.
Operations has been maintaining these rails and performing minor repairs for many years.
The Comprehensive Wastewater Master Plan (CWMP)for the Treatment Plant had identified needs for
replacement or rehabilitation of the existing collector chains and flights, embedded rails, as well as other
structural, electrical, and equipment replacement and upgrades. That project, the Mechanical & Concrete
Renovations, District Project Number 7351, started this Fiscal Year(FY) 2017-18 with design and
construction to start early next year to address these issues. The Ten-year Capital Improvement Plan has
$6.9 million of improvements with construction continuing through FY 2020-21 for the project.
In January of this year, the system in PST No. 1 experienced a major failure, which included replacing
components of flights and chain repairs. Fortunately, Operations was able to repair the system prior to the
heavy rain events in early February. However, the system failed again in May and staff determined that the
root cause of the failure was due to the poor condition and failed sections of the embedded rails.
Operations responded by performing temporary repairs to sections of the rails, replacing components of
the damaged flights and chains. PST No. 1 was returned to service in June. This allowed staff time to
inspect the other three tanks, with the intent to leave time available for necessary repairs prior to the
upcoming wet weather season (starting October 31). The repairs on PST No. 1 required three to four
weeks, including weekends, overtime, and significant plant resources.
Given that the systems have experienced three failures in the past year, Operations and Engineering
concludes that replacement of the most corroded and deteriorated parts is required to insure that the
systems are fully operational and reliable the next rainy season. To date, three of the four tanks have been
inspected and staff concludes replacement of the embedded floor rails on PST Nos. 1 and 2, and
replacing the flights and chains on PST Nos. 2 and 3 is required this summer rather than in the next year or
two as contemplated by the CW MP. PST No. 4 is scheduled for inspection during the week of July 31 and
it is anticipated that some level of emergency work will also be required on that tank.
Primary sedimentation tanks play a major role in the treatment process and are critical to meet our NPDES
permit, especially during the higher flows experienced in the wet weather season. Failures to the collector
systems discussed above certainly will impact the process and present the risk violating this permit.
Based on experience, staff strongly recommends to perform this work immediately under an emergency
declaration. This requires use of an outside contractor due to the amount of construction work required to
be completed prior to the wet weather season. The construction factors include long lead times (6-8
weeks)for the proprietary flights and chains, time needed for shut downs and acceptance testing, and
staff's inability to conduct a formal design and bid process in time to complete the work before the wet
weather season.
Staff has requested formal proposals from three qualified General Contractors (W.M. Lyles Co., D.W.
Nicholson Corporation, and Manito Construction)that are currently working on Central San projects. Using
one of these contractors that is already under contract and mobilized will allow work to begin almost
immediately. We received two competitive proposals (W.M. Lyles Co. and D. W. Nicholson Corporation).
Staff is recommending W.M. Lyles Co., which is working on the Headworks Screening Upgrade project
and propose to complete the work under change order. Staff spent time working with these contractors to
obtain competitive and complete proposals. Several meetings were arranged with field tours and
inspections to allow for more accurate pricing and site-specific constraints. I n addition, the costs received
for the parts are in line with previous orders placed by Central San in the past.
August 3, 2017 Regular Board Meeting Agenda Packet- Page 124 of 132
Page 3 of 10
Staff has concluded that this project is exempt from the California Environmental Quality Act (CEQA)
under Central San CEQA Guidelines Section 15302, since it involves replacement of existing facilities at
the same location and with the same purpose.Approval of the Resolution will establish the Board's
independent finding that this project is exempt from CEQA.
ALT ERNATIVES/CONSIDERATIONS
1) Finish the design and bid the project, which is not recommended. 2)Approach other contractors to
obtain additional proposals, which is not recommended due to time constraints, potential delays in delivery
of parts, and contractors are in high demand and busy. 3) Perform the work in-house; however, staff does
not have sufficient resources to complete the work by the wet weather season and maintain other staff
functions.
FINANCIAL IM PACTS
The cost for the project this year is estimated at$800,000, which includes staff time, testing, contractor
costs, and contingency. Based on the unit pricing provided by W.M. Lyles Co., the change order is
estimated to cost between $600,000 to $750,000. Staff will have the change order costs after PST No. 4
has been evaluated. The Mechanical & Concrete Renovations, District Project Number 7351, is included
in the FY 2017-18 Capital I mprovement Budget(CI B) on page 163 with a current FY budget of$560,000.
Upon Board authorization of this position paper, the General Manager will transfer$240,000 from the C I B
Contingency account to the Mechanical & Concrete Renovations budget as authorized under the Capital
Improvements Program limits in Resolution 2016-046 (General Manager Authority). To date, there is $1.5
million in the FY 2017-18 C I B Contingency account. This action will leave a remaining contingency
balance of$1.26 million for other projects.
COMMITTEE RECOMMENDATION
The Engineering and Operations Committee reviewed this subject at the special meeting on July 31,
2017.An update will be provided at the Board Meeting.
RECOMMENDED BOARD ACTION
Declare an Emergency and allow the General Manager to execute a change order with W.M. Lyles Co.
based on the time necessary to complete the work prior to the wet weather season.
Strategic Plan re-In
GOAL TWO: Strive to Meet Regulatory Requirements
Strategy 1 - Strive to Achieve 100% Permit Compliance in Air, Water, Land and Other Regulations
GOAL FIVE: Maintain a Reliable Infrastructure
Strategy 2- Facilitate Long-term Capital Renewal and Replacement
ATTACHMENTS:
1. Proposed Resolution
2. PowerPoint Presentation
August 3, 2017 Regular Board Meeting Agenda Packet- Page 125 of 132
Page 4 of 10
The proposed Resolution will be distributed prior to the
Board Meeting on August 3, 2017.
August 3, 2017 Regular Board Meeting Agenda Packet- Page 126 of 132
PROPOSED RESOLUTION TO AUTHORIZE
A CHANGE ORDER FOR EMERGENCY
WORK AT THE TREATMENT PLANT
PRIMARY SEDIMENTATION TANKS
Board Meeting
August 3, 2017
Presented by
Edgar J. Lopez, PE
Capital Projects Division Manager
August 3. 2017 RPnt1Ia.RnaM Macfinn Ancnria Parkcf-Pana 177 of 1.19
�V
4 ■� 1
t
R y�
S r
1 ftrl•
I
_ f `
4t
I � _
• f I .' Ca,•F a ,. .mac f'• . — y �'A,e
may, pry
M - • 1 .( fib wk* -- 3 � �-—.� +�� � y�F.
t T}
,re 1 1
•
-
}
s•
rte• j �
-s
` "1 • fin
AOWW
t �
oaf
k V, oNrIp
9 do
AD jr
dw
ail
K
i.';rte^,_ � ./'S:Y !t'�y�r. ,'�� � _ � �k-� -• � _ _ � _
-
AVF
1 4p
41(
qqb
IV
�. _ � -�R .l � _ � - w ��-� f•��■ '�.Ir -."moi` �- �-�.. -,� y �L'�_ i
.1
h
dk
,"was"I
4-t
� ...'•. i ; ..J e +f- -. -`. {� �a � . -1 _6 Com`�•• `�� _^• : -.��L-1 f
it
1
40
dip
deft
_ y
90
.. s
• !� +-,• ate,'x^••.. _
4 {
t-
�'*, � tui .>i• A•� -.
TREATMENT PLANT PRIMARY SEDIMEN ION TANKS
..........
MEN&.-:
Ak *
- - _ �'�"��'•► �• _. _•• +_ �,,.y « � k \moi•,r 4�r y�F• r•+{ �s M1 ° t
,
.''•.4."-..7,7
■
1
46
AP
-
•.r a,.� `�. `, •s� r r _ - ,� - .�i'iy r''ti.i.`- w �'•'�' _,� ,� - - v - r _ is` `-• ►tib.-«
tet'' Y► +e__ - - A y p _ ,,, 1Y
,
r + r..mss '�' _j- . . •-- �4 �� � - � - '� - _, - v•� __ _., •- - - _ .�
- v
t
a,
►.- -� - a _+ 0
+ _roti
opt
'r 's
- - `� w -c _ - t•_ •fib.-a Y� T.• _M- 1 _ � -
+
F: • + -ICA —V 0 4_
dip
-Nor 4L
Aa
Ol-
♦ �� f
'0TL 4d dp P.CA
VL
* IL
'
TAT
AL
"r `
_ : ,,
dr 0
f u•
f
Wear strips, aia anchoring
ok
Ab'AW4
milli
4D 0
y,
t � �• �, � , �'C- •-� _ - -all
Y
Ir r ,
Ik
f t
l�4
L
1�
i w
7 ib
A0000iiiIIii�
�INA `- a
jr 1
At. Ilk,
4 s
K �
■'�� �' .. �!- �''+�.,♦+z�'[� #��;+ � 4€4,
1 ��- ' • -i 4 �/e ��,� { '� •�'i�j �� '�wT �� i�-s V� I 1 I I 1 •
r
ap
.. .,,Pc_..)�• �•�t- !• e sem.
t III
< •��
Ah
Ala:�lq . -,
lit
IZ
lir
Its
ft
t c MA-+-
'�,�y i,
vil
. �,�s � � +f ♦"A•- .zTj/-w'0.��• �1R .err�`� •,�
NI