Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Farm Slide 16.pptx
F Buildings & Grounds*** Required Maintenance Efforts for the whole Kiewit property include erosion control and mowing by Central San feet behind driveway; full loop paved for automated fill station-** COA #15 required paving 100inch Recycled Water Line was extended with hydrant to serve fill station and farm-* 8$ 541,435$ 20,412 $ 334,995$ 186,028 TOTAL$ 147,620-$ $ 147,620-$ DP 7350 (Paving)**$ 149,522$ 149,522DP 7306 CO (REW Line)*$ 244,293 $ 20,412 $ 37,853 $ 186,028 OM080 Summary$ 11,647 $ 765 -$ $ 10,883 -FY 2016$ 61,571 $ 14,415 $ 2,346 $ 44,810 -FY 2015$ 31,528 $ 6,818 $ 24,710 -FY 2014$ 87,732 $ 5,232 $ 28,689 $ 53,811 -FY 2013$ 51,815 -$ -$ $ 51,815 -FY 2012Total Maintenance *** Expenses Staff XPENDITURES E ROPERTY P IEWIT/K