HomeMy WebLinkAbout05. Authorize agreement with V.W. Housen and Associates not to exceed $780,000 for preliminary design of Pump Station Upgrades Project, DP 8436 CENTRAL SAN BOARD OF DI RECTORS POSIT IO N PA PER M E E T I NG D AT E : J ULY 20, 2017 S UB J E C T: A UT HO R I Z E T HE G E NE R A L MA NA G E R TO E X E C UT E A P R O F E S S I O NA L E NG I NE E R I NG S E RV I C E S A G R E E ME NT I N A N A MO UNT NO T TO E X C E E D $780,000 W I T H V.W. HO US E N A ND A S S O C I AT E S F O R T HE P R E L I MI NA RY D E S I G N O F T HE P UMP S TAT I O N UP G R A D E S P R O J E C T, D I S T R I C T P R O J E C T 8436. A P P R O VA L R E C O MME ND E D B Y E NG I NE E R I NG & O P E R AT I O NS C O MMI T T E E . S UB M I T T E D B Y: A MA ND A S C HMI D T - A S S O C I AT E E NG I NE E R I NI T I AT I NG D E PART M E NT: E NG I NE E R I NG A ND T E C HNI C A L S E RV I C E S - C A P I TA L P R O J E C T S RE V I E WE D B Y:S A S HA ME S T E T S K Y - S E NI O R E NG I NE E R E D G A R J . L O P E Z - C A P I TA L P R O J E C T S D I V I S I O N MA NA G E R J E A N-MA R C P E T I T - D I R E C TO R O F E NG I NE E R I NG A ND T E C HNI C A L S E RV I C E S R oger S . B ailey G eneral Manager I S S UE B oard of D irec tors authorization is required f or the G eneral Manager to exec ute a prof essional engineering s ervices agreement in an amount greater than $100,000. B AC K G RO UND I n 2015, C apital P rojects initiated an evaluation of the Moraga and O rinda C rossroads P umping S tations at the reques t of O perations due to several def iciencies with the standby generator systems, electrical and instrumentation c oncerns, and other equipment identif ied f or near term replacement. T he most impactf ul July 20, 2017 Regular Board Meeting Agenda Packet - Page 25 of 151 ITEM 5 Page 1 of 4 item identif ied was replacement of the 1,000-horse power Waukesha dies el engines (circa 1959) at both stations. S taf f hired V. W. Housen and A ss oc iates (V W HA ) to assist in the project and prepared a bas is of design report with options to replace the engines and other station improvements. C oncurrently, the C omprehensive Wastewater Master P lan identif ied several structural, mechanical, electrical, and ins trumentation improvements needed at the Martinez, F airview, Maltby, and F lush K leen pumping stations . T hese stations have multiple concerns, including reliability of existing equipment and inf rastructure, c orrosion, are prone to f looding, and have some pumping c apacity limitations. C entral S an staf f decided to package these stations with Moraga and O rinda C rossroads to f orm one all- encompassing improvement project, which has been included in the current C apital I mprovements B udget titled P ump S tation Upgrades P roject, D is tric t P roject 8436. S taf f sought a s ingle engineering consultant to coordinate and prepare the predesign work and continue design servic es based on the recommendations provided, while f ocusing on the most critical elements identif ied in the project. T he improvements identif ied and included in this project are aimed at addressing the f ollowing drivers : P roviding long-term reliable wet weather pumping; P rovide f irm pumping capacity at all pumping stations; R eplac e and upgrade the emergency backup power systems; R eplac e or rehabilitation of the electric al, instrumentation, and controls at all pump stations; S af ety improvements and implementing recommendations f rom the A rc-F lash S tudy completed in 2015; E quipment replacements (f low meters , variable f requency drives, automatic transf er switches, and others); R eplac ing deteriorating piping, gates , valves, and structures and provide long-term corrosion protection; and P roviding resiliency f rom f looding. C entral S an s taf f prepared a R equest f or P roposals (R F P ) and it was advertised f rom May 22, 2017 to J une 19, 2017 on P lanetB ids to select a prof essional engineering consultant to provide design serves f or the project. T he design services included are preliminary services (up to 30% design) and detailed f inal design servic es (to 100%). T hree proposals were received; C arollo E ngineers, I nc., S tantec C onsulting S ervices (MW H), and V W HA . S taf f evaluated the proposals and interviewed the consultant teams. V W HA had the highest total score and is c ons idered the best overall f it f or the project. S taf f recommends V W HA in association with HD R , I nc. and A rc S ine E ngineering f or the design of the P ump S tation Upgrades project. T he scope of work f or the consultant agreement will include, but is not limited to, the f ollowing: A n “all elec tric” evaluation f or the Moraga and O rinda C rossroads P ump S tations that includes replacing the existing wet weather dies el driven engines at each station with electric variable speed pumping; A n asses s ment f or the six pump stations f or corrosion, structural, elec trical, instrumentation and controls ; A n asses s ment of the C oncord Main Metering S tation f or corrosion, s tructural, electrical, instrumentation and controls; A high-level evaluation to determine the s cope of improvements and planning level construction c os t to poss ibly eliminate the F airview P ump S tation; A n inves tigation of the six pump station s ites to identif y the f lood ris k potential based on existing conditions , proposed conditions, and s ea level rise; T hree-dimensional (3 D ) visualization of pump room and main elec tric al room at Moraga and O rinda July 20, 2017 Regular Board Meeting Agenda Packet - Page 26 of 151 ITEM 5 Page 2 of 4 C rossroads P ump S tations; A preliminary level (30 percent) design f or the upgrades required at Moraga and O rinda C rossroads P ump S tations; A preliminary level (30 percent) design f or the upgrades required at Maltby, F airview, Martinez, and F lush K leen P ump S tations; A preliminary level (30 percent) design f or the upgrades required at the C oncord Main Metering S tation; and A preliminary design report that will inc lude reliability and redundanc y design criteria, planning-level construc tion cost estimates by station, a planning-level construction s c hedule, an implementation strategy inc luding procurement considerations and project design pac kage recommendations, phasing plan(s), and preliminary (30%) design drawings. S taf f has evaluated this action and concluded it is exempt f rom the C alif ornia E nvironmental Q uality A c t (C E Q A ) under C entral S an C E Q A G uidelines S ection 15262 since the agreement would be used f or design studies f or possible f uture actions whic h C entral S an has not approved, adopted, or f unded, and the outcome of these tasks will not have a legally binding ef f ect on later ac tivities. A pproval of this action will establish the B oard of D irectors’ independent f inding that the action is exempt f rom C E Q A . T he B oard f urther f inds that C entral S an will produce appropriate C E Q A complianc e documentation prior to undertaking any "project" arising f rom these design studies. ALT E RNAT I V E S /C O NS I D E RAT I O NS A n alternative would be not to package all the pump stations to be designed by one consultant and perf orm the projects individually with separate contracts, which is not rec ommended. T he goal of the predesign work is to f inalize the scope of work, construction constraints, determine any special requirements , develop a realistic schedule, and cost estimates. I n addition, this ef f ort will determine how to package and s equence the construction phas e. F inal design is not included in the V W HA agreement at this stage. S taf f intends to negotiate a f inal des ign f ee with V W HA af ter the predesign work is c omplete and provide an update and seek f urther approval of the design at a f uture B oard Meeting. T he budget f or f inal design is planned f or the project in F iscal Year (F Y) 2018-19. F I NANC I AL I M PAC T S T he V W HA predesign services is expected to reach $780,000. T his projec t is included in the F Y 2017-18 C apital I mprovement B udget on page 131 with a total estimated F Y 2017-18 budget of $850,000, including staf f time. T he total estimated project cost is $33,435,000, which includes $450,000 f or planning (F Y 2016-17), $2,596,000 f or design (staf f and consultant work in F Y 2017-19), and $30,389,000 f or construction (F Y 2019-22). T he agreement f or V W HA may reach up to $2,300,000 if all the project elements are completed, whic h is 7.5 percent compared to the total estimated construc tion costs. C O M M I T T E E RE C O M M E ND AT I O N T he E ngineering and O perations C ommittee reviewed this project at the meeting on J uly 11, 2017, and recommended approval of the agreement. RE C O M M E ND E D B O ARD AC T I O N F ind that the project is exempt f rom C E Q A and authorize the G eneral Manager to execute a P rof essional July 20, 2017 Regular Board Meeting Agenda Packet - Page 27 of 151 ITEM 5 Page 3 of 4 E ngineering S ervices A greement with V.W . Housen and A ssociates with a c ost ceiling of $780,000 f or the preliminary des ign of the P ump S tation Upgrades, D istrict P roject 8436. Strategic Plan Tie-I n G O A L F I V E : M aintain a R eliable I nfr astr uctur e Strategy 1 - Manage Assets Optimally Throughout Their Lifecycle, Strategy 2 - Facilitate Long-term Capital Renewal and Replacement July 20, 2017 Regular Board Meeting Agenda Packet - Page 28 of 151 ITEM 5 Page 4 of 4