HomeMy WebLinkAbout09. Receive presentation on National Pollutant Discharge Elimination System (NPDES) Permit Renewal 9■
Ak
7 NPDES PERmIT RENEWAL
f
Real Estate, Environ ental & Planning
COI�[III
'•M�ti 4 Meetning
May 22, 2017
i
14-
Rita CAssociate Engineer
Arita Setty, Chemist 11
rte,
Gko
ACKNOWLEDGEMENTS
■ Executive Management
■ Legal Counsel
■ Operations
■ Environmental and Regulatory Compliance
■
Planning. & Development Services
Report of W";I Iaste Discharge
■ Resource Recoveryor�s �'
September 2016
■ Capital Projects
Larry Walker Associates
�l u.
IF
2016m2017 PDE ENEWAL TIMELINE
4/2212016 6/1/201 7
Sent Current Permit to New N P DES Perm it i n Effect
Application Preparation Review Group 4/12/2017
for Mark-ups Target Adoption Date
6/1/2016
Com piled M ark-ups from 3131112017
Application Preparation Current Permit Expires
Review Group 9.00`/2016 2/3112-017
ROWD Tentative Order
Submirs.al Deadline Availab-,,t- Public Comments
NEW
aw
-W
Apt 16 N1 a 0 1 U ri En Jul 16 Aug 16 6 _ �: �� } s� ��� �.� ��� �
Feb 1, NlBr I' Apr E
Mar 16 V Y 17
8/1712016 Today
NTP for LWA Contract .27/2017'
Prep-are and Submit
Convened Application Preparation
Comments
Review Group on Tentative Order-
4/12/2016 1/8/2017- 1/28 201.
Appointed Internal Review
Project Coordinators 1/5/2017
Administrative Draft
Established Application Review Group Ava i la ble for CCCSD's Review
MAJOR HIGHLIGHTS of 2017 NPDES PERMIT
*NEW* 2017 Permit 2012 Permit
Effluent Limits 0 Ammonia's limit reduced to: E Ammonia limits were: Neutral
(Changes) 64 mg/L AMEL, 82 mg/L MDEL 65 mg/L AMEL, 84 mg/L MDEL
■ Cyanide's limit reduced to: X Cyanide's limit was:
36 mg/L MDEL 39 mg/L MDEL
Effluent Limits a Removes Bis(2-ethylhexyl) 0 RPA of Bis(2-ethylhexyl) Positive
(Removals) phthalate phthalate resulted in WQBEL
■ Removes chronic toxicity 0 Narrative limit : "chronic
effluent limit toxicity at a level that would
cause or contribute to toxicity
in the receiving water."
Nutrients Includes summary of past Required studies evaluating Positive
nutrient work, i.e. 2014 Nutrient the effects of nutrients on
Work Plan and Zeolite-Anammox Suisun Bay
Pilot Required evaluation of
■ Defers to Nutrient Watershed ammonia removal treatment
Permit technologies
Outfall Bypass Adds Table E5: Deepwater Contained only standard Positive
Monitoring Outfall Bypass Monitoring language regarding bypass
Requirements monitoring
AMEL =Average Monthly Effluent Limitation RPA = Reasonable Potential Analysis
MDEL= Maximum Daily Effluent Limitation WQBEL= Water Quality Based Effluent Limitation
3
MAJOR HIGHLIGHTS of 2017 NPDES PERMIT
NEW* 2017 Permit 2012 Permit
-M
Discharge Points Adds monitoring stations No designated monitoring Neutral
RSW-001 and RSW-002 for location for outfall bypass
Outfall bypass No designated monitoring
■ Includes REC-001 for recycled location for recycled water
water off-site distribution off-site distribution
Chronic Toxicity Allows chronic toxicity sample Required 24-hr composite Positive
collection on alternating days samples on consecutive
days
Acute Toxicity Allows manual pH adjustment of Not stated. Permission Positive
acute toxicity sample to minimize granted by letter from
ammonia toxicity interference Regional Water Board in
December 2014
Pretreatment and Removes organophosphorus Required monitoring of Positive
Biosolids pesticide monitoring influent, effluent, and
Monitoring biosolids twice per year
ADDITIONAL HIGHLIGHTS of 2017 NPDES PERMIT
*NEW* 2017 Permit 2012 Permit
Facility Name Official facility name updated to Official facility name was Positive
"Central Contra Costa Sanitary "Central Contra Costa
District Wastewater Treatment Sanitary District Wastewater
Plant and its wastewater Treatment Plant and its
collection system" associated wastewater
collection system"
Cyanide Action Plan Requires implementation of No numerical threshold Minimal
emergency monitoring and based on influent
response plan if influent cyanide concentration
concentration exceeds 7.4 ug/L
Flow Monitoring Reduces flow reporting to daily Required reporting of daily Positive
average flow and total monthly and monthly averages, total
flow daily and monthly volume,
■ Adds reporting for recycled water and max and min daily
off-site distribution averages with times of
occurrence
Proper Supervision Removes annual reporting Required annual reporting Positive
and Operation of requirements
POT1Ns
rt�4�¢mow