Loading...
HomeMy WebLinkAbout08.Review draft Position Paper to award a construction contract for Lafayette Sewer Renovations, Phase 11, District Project 8430 8■ Central San BOARD OF DIRECTORS POSITION P Board Meeting Date: June 1 2017 Subject: AWARD A CONSTRUCTION CONTRACT AND AUTHORIZE THE GENERAL MANAGER TO EXECUTE CONTRACT DOCUMENTS SUBJECT TO SUBMITTAL REQUIREMENTS WITH XXXXX FOR THE CONSTRUCTION OF THE LAFAYETTE SEWER RENOVATIONS, PHASE 11 , DISTRICT PROJECT 8430 Submitted By: Initiating Dept./Div.: Amanda Schmidt Engineering and Technical Associate Engineer Services/Capital Projects REVIEWED AND RECOMMENDED FOR BOARD ACTION: S. Mestetsky—Senior Engineer E. Lopez—Capital Projects Division Manager JM. Petit— Director of Engineering and Technical Services Roger S. Bailey Genera!Manager ISSUE; On May 10, 2017, XXXX ( ) bids were received for the construction of the Lafayette Sewer Renovations, Phase 11, District Project 8430 (Project). The Board of Directors (Board) must award the contract or reject bids within 50 days of the bid opening. g Authorize the General Manager to execute the Contract Documents subject to submittal requirements. BACKGROUND: The Project is part of the ongoing sewer renovation within the Collection System Program of the Capital Improvements Budget to replace or rehabilitate aging g p g g sewer infrastructure that is in poor condition. This Project aligns with Central San's Strategic Plan, specifically the following: • Goal No. 1 — Provide exceptional customer service • Goal No. 2 — Strive to meet regulatory requirements • Goal No. 6 — Maintain a reliable wastewater infrastructure The Project is located in the Brook Street, Walnut Street, and via Roble neighborhoods and other locations in Lafayette. The scope of work consists of replacement or rehabilitation of approximately 8,400 lineal feet of 6-inch to 8-inch diameter sewer mains, construction of manholes, and other related work within public rights-of-way, easements, and near creeks. The project location map is identified in Attachment 1 . Central San staff prepared the plans and specifications for the Project. The Engineer's estimate for construction is $3,000,000. This project was advertised on April 10 and 24 p , 2017. XXXX ( ) sealed bids ranging from $xxx to $xxxx were received and publicly opened on May 10, 2017. The Engineering Department conducted a technical and commercial Page 1 of 6 POSITION PAPER Board Meeting Date: June 1, 2017 subject: AWARD A CONSTRUCTION CONTRACT AND AUTHORIZE THE GENERAL MANAGER TO EXECUTE CONTRACT DOCUMENTS SUBJECT TO SUBMITTAL REQUIREMENTS WITH XXXXX FOR THE CONSTRUCTION OF THE LAFAYETTE SEWER RENOVATIONS, PHASE 11 , DISTRICT PROJECT 8430 review of the bids and determined that XXXXX is the lowest responsive and responsible bidder. References were provided for XXXXX and staff received satisfactory feedback. A summary of bids received is shown in Attachment 2. Central San will administer the construction contract and provide contract administration, inspection, survey, office engineering, and submittal review. Consultant inspection will be used to supplement staff on an as-needed basis. CEQA: Staff has concluded that this project is exempt from CEQA under District CEQA Guidelines Section 15302, because it involves replacement of existing sewer facilities at substantially the same locations and with the same purpose and level of activity as the facilities being replaced. Any capacity increases are for non-growth inducing, wet weather purposes. This project also is exempt under District CEQA Guidelines Section 15061(b)(3), since it can be seen with certainty that there is no possibility that the activity in question may have a significant effect on the environment. This certainty is based on Central San's experience with numerous sewer construction projects of this nature, the relatively short distances involved, and Central San's mitigating construction specifications. These specifications are standardized general and special conditions that are made part of the project bid documents to address environmental considerations, such as protecting trees and riparian areas, as well as compliance with applicable federal, state, county, district, municipal and local laws, ordinances, orders, and regulations. Approval of this project will establish the Board of Directors' independent finding that this project is exempt from CEQA. ALTER NATIVESJCONSiDERATIONS: Reject all bids, which is not recommended. FINANCIAL IMPACTS: The total estimated project cost is $4,000,000, including design, bid price, contingency, construction management, and consultant costs as detailed in Attachment 3. This project is included in the Fiscal Year 2016-17 Capital Improvement Budget on page 111 with a total estimated project budget of $4,000,000. COMMUNITY OUTREACH: Central San held a public meeting on April 5, 2017, at the Collection System Operations Department building in Walnut Creek to assist with any questions or concerns by the residents along the proposed construction alignments. in addition, staff has notified and met with several easement homeowners directly to discuss the upcoming sewer work, construction impacts, project schedule, and receive input. COMMITTEE RECOMMENDATION: The Engineering and Operations Committee reviewed this project at its meeting on May 9, 2017, and recommended approval of the Project contingent on receiving bids at or below the project estimate. Page 2of6 POSITION Board Meeting Date: June 1 , 2017 subject: AWARD A CONSTRUCTION CONTRACT AND AUTHORIZE THE GENERAL MANAGER TO EXECUTE CONTRACT DOCUMENTS SUBJECT TO SUBMITTAL REQUIREMENTS WITH XXXXX FOR THE CONSTRUCTION OF THE LAFAYETTE SEWER RENOVATIONS, PHASE 11, DISTRICT PROJECT 8430 RECOMMENDED BOARD ACTION: Staff recommends the following: 1 . Find that the project is exempt from CEQA; 2. Award a construction contract in the amount of $XXXXXX for the construction of the Lafayette Sewer Renovations, Phase 11 , District Project 8430, to XXXXXX, the lowest responsive and responsible bidder; and 3. Authorize the General Manager to execute the Contract Documents subject to submittal requirements and include up to 10-percent contingency. Y Attached Supportinci Documents: 1. Project Location Map 2. Summary of Bids 3. Post-Bid/Preconstruction Estimate Page 3 of 6 ATTACHMENT 1 LAFAYETTE SEINER RENOVATIONS, PHASE 11 DISTRICT PROJECT 8430 PROJECT LOCATION MAP se, V0 i4-mm 1 � -� 24 %f iI my 1 A ra 24 Martinez,CA g 0 1000 FEET L r � Q s 4 ' � Q N V 0 1200 2400 FEET Project Areas H Central Contra Costa Attachment Sanitary District Lafayette Sewer Renovation Phase 11 Ll I I r� District Project 8430 1 0 Location Map Page 4of+6 ATTACHMENT 2 LAFAYETTE SEWER RENOVATIONS, PHASE 11 DISTRICT PROJECT 8430 SUMMARY OF BIDS PROJECT NO.: 8430 NO. OF ADDENDA: 1 DATE: MAY 102017 PROJECT NAME: LAFAYETTE SEINER RENOVATIONS, PHASE 11 PROJECT LOCATION: LAFAYETTE, CA ENGINEER'S ESTIMATE: $3,000,000 NO. BIDDER BID PRICE 1 2 3 BIDS OPENED BY/s/ Elaine R. Boehme, CMC DATE: Maw 0, 2017 Page 5 of 6 ATTACHMENT 3 LAFAYETTE SEINER RENOVATIONS, PHASE 11 DISTRICT PROJECT 8430 POST-BID 1 PRECONSTRUCTION ESTIMATE TO BE COMPLETED AFTER BID Page 6 of 6