Loading...
HomeMy WebLinkAboutENGINEERING & OPERATIONS MINUTES 03-17-17 70dol con tragi contra costa sanitary District . .......... SPECIAL T N THE BOARD OF T. CENTRAL c PAUL H CAUSF'Y Presideni SANITARY JAMES A.NEUEDLY ENGINEERING & OPERATIONS President Pro Tem COMMITTEEMICHAEL R.MCGII L TAD J.PILEC K] ISA Vl o R.WILLIAMS MINUTES PHONE: (925)228-9500 FAX: (925)676-7211 Friday, March 17, 2017 wv►.w.centt*cilsaii.org 9:00 a.m. 2nd Floor conference Room 5019 Imhoff Place Martinez, California Committee: Chair Jim Ne wily Member haul Causey Staff: Ann Sasaki, Deputy General Manager Jean-Marc Petit, Director of Engineering and Technical Services Danea Cernmell, Planning and Development Services Division Manager Edgar Lopez, Capital Projects Division Manager Torn Codsey, Senior Engineer (left after Iters 7.) Sasha Mestetsky, Senior Engineer (left after Item 5.) Randy Schmidt, Senior Engineer (left after Item 6.) Rita Cheng, Associate Engineer (left after Item 6.) Cindy Cranzella, Senior Administrative Technician 1. call Meeting to order Chair Ne}edly nailed the meeting to order of 9:01 a.m. 2. Public Comments None. V Review draft Position Paper to authorize the General Manager to execute professional services agreements with KKR and ARWS for right of gray services for Development Services Engineering &operations Committee Minutes March 17, 2017 Page 2 Ms. Cernmell distributed copies of the presentation (attached). she explained that the scope of services for the project would be to augment existing staff during peak workloads. COMMITTEE ACTION: Reviewed and recommended Board approval. 4. Review draft Position Paper to reject bid for the Collection System Urgent Repairs, District Project $434 Mr. Lopez stated that only one bid was received for this project, and it was significantly over the engineer's estimate. He explained that the project was initiated to find an alternative for doing urgent sewer work that could not wait for the traditional design and public laid process. In the past, urgent work was performed under change orders. Staff thought that having an urgent repair contractor with on-call services would help and provide another source to complete urgent work. chair Nejedly stated that, if managed properly, change orders are acceptable because the contractors are already out in the field. Member Causey agreed, but reminded staff that if change orders are used for other projects, they need to be charged to the right budget. Mr. Lopez explained that staff will add the work in the vicinity of walnut Creek to the Phase 11 project and other urgent work identified under Project 3434 will be included in the bid for upcoming projects. The added cost will be reflected in those total project budgets. Member Causey requested that information be added to the Community Outreach section of the Position Paper to explain the identified work sites. Member Causey also suggested charging change orders against this project. COMMITTEE ACTION: Reviewed and recommended that the Board resect the bid and allow the base work to be added to upcoming sewer renovation projects. 5.* Review draft Position Paper to award a construction contract for the Walnut Creep Sewer Renovations, Phase 11, District Project 8422 il/lr. Lopez stated that a quarter of last year's sewer overflows were in walnut Creek, as presented to the Board by the Collection system operations Manager at the l'''arch 2, 2017 Board meeting. He distributed a revised draft Position Paper with one addition under the Financial Impacts section (attached). Member Causey asked how the cost of design compares to consultants. Mr. Lopez responded that using consultants would likely increase design costs. Member Causey reminded staff that in order to go from a replacement strategy Engineering &Operations Committee Minutes March 17, 2017 Page 3 of 3-4 miles per year to 18 miles per year, more consultant work may need to be considered. Mr. Petit indicated that that was the plan. COMMITTEE ACTION: Reviewed and recommended Board approval. 5. Review draft Position Paper to authorize the General Manager to execute a testing agreement for the Pilot Plant under the Solids Handling Facilities Improvements Project, District Project 7348 Mr. Lopez summarized the project, and responded to questions. In response to a question, Ms. Cheng clarified that the 300 samples are the entire scope of the project for$480,000. COMMITTEE ACTION: Reviewed and recommended Board approval. 7. Review draft Position Paper to authorize additional funds in the amount of $500,000 from the Sewer Construction Fund for the Development Sewerage Project'District Project 8420 This item was taken out of order, immediately following Item 3. Ms. Gemmell explained that development activities have been very active for this fiscal year. The Development Sewerage capital project is used to capture staff hours for new assets built by developers in order to properly capitalize all costs for contributed assets. Every year, staff estimates the amount which is included in the Capital Budget; this year, $800,000 was estimated, which has already been spent by end of February. The budget for next fiscal year will be increased to $1 million. COMMITTEE ACTION: Reviewed and recommended Board approval. 8. Receive list of Scheduled/Parking Lot items Ms. Gemmell will bring the easements item to the next meeting, with a focus on Martinez, specifically. COMMITTEE ACTION: Received the list and provided input to staff. 9. Announcements a. Future scheduled meetings: Tuesday, April 11, 2017 at 1:00 p.m. Tuesday, May 9, 2017 at 1:00 p.m. Tuesday, June 5, 2017 at 1:00 p.m. Engineering &Operations Committee Minutes March 17, 2017 Page 4 b. Mr. Lopez announced that staff may need to change the May meeting date, or possibly schedule an additional meeting, depending on timing of upcoming projects. 10. Suggestions for future agenda items Member causey requested an update on the Uniform Accounting Act, which may be presented to this Committee, or the Finance Committee. Mr. Lopez stated that staff will►bring forward an item at the next meeting to discuss the need for contingency money for Miner Roam sewer repairs. 11. Adjournment-- at,9:49 a.m. * Attachment Item . (Committee Handout) - _} I ..R RIGHT OF WAY w MARCH 17, 2017 w- ti ENGINEERING AND OPERATIONS ,COMMITTEE MEETING Danea Gemmell, PE Planningand Development p ent Services Division Manager OVERVIEW On January 1 , 2017, staff sent out Request for Proposals to: Associated Right of Way Services, Inc. (ARWS) Coates Field Service, Inc. KW R Real Estate and Right of Way Services Paragon Partners, Ltd. Two firms provided proposals: ARWS and KKR Consultant Year 1-Initial Agreement Year 2-Option to Nat-to-Exceed Total Extend ARWS $96,000 $96,090 5192,000 KWR $91,000 $91,0oo 5182,000 Grand Total $374,000 1 3/21/2017 RIGHT OF WAY SCOPE OF SERVICES • Staff Augmentation for Workload Peaks • QA/QC for right of way entitlements to address backlogs of approximately 60 developments: Irrevocable offers of dedication Grant of Easements Subdivision Maps Quitclaim Deeds Relinquishments. TYPICAL DEVELOPMENT PROCESS 1. City approves subdivision map 2. Developer submits improvement plans with proposed right of way entitlements 3. Central San completes plan review and issues sewer permit (fees paid and project security collected) 4. Construction of new sewer main and connections 5. Final map is filed with County to allow sale of individual lots 6. QA/QC of Developer submitted as-builts with entitlements for consistency before release of security 7. One year inspection and close out of project of new main allows release of security 8. Staff brings right of way documents to Board for acceptance ok 2 3/21/2017 RECOMMENDED BOARD ACTION • Execute a one-year professional services agreement with Associated Right of Way Services, Inc., in an amount not to exceed $96,000 with the option to extend for one additional year for a total not to exceed amount of $192.000 for right of way services under the Development Sewerage Project, DP 8420; • Execute cone-year professional services agreement with KWR in an amount not to exceed $91,000 with the option to extend for one additional year for a total not to exceed amount of $182,000 for right of way services under the Development Sewerage Project, DP 8420. QUESTIONS? AOO" 3 3/21/2017 MARTINEz I HT OF WAY STATISTICS Total Wes of Pipe Total Miles of PipeTotal Miles of In insulted/ Estimated Miles of within Private Remaining Mik!sr Main Type Service Pipe Rehabifitatedby Pipe v&hin Private Property and Pipe in Easernenj Capital Projects 1970- Prop" Rehabilitated by for Review -7 2016 CapitalProjects Force Mains 3 3 2 2 p Gravity Mains 79 18 16 3.2 12.8 Lotal 82 21 18 5.2 12.8 r 4 Item ■ Central n (Committee Handout) BOARD OF DIRECTORS POSITION PAPER Board Meeting Late: April 6 2017 Subject: AWARD ACONSTRUCTION CONTRACT AND AUTHORIZE THE GENERAL MANAGER To EXECUTE CONTRACT DOCUMENTS SUBJECT To SUBMITTAL REQUIREMENTS WITH CRATUS, INC. FOR THE CONSTRUCTION of THE WALNUT CREED SEWER RENOVATIONS, PHASE 11, DISTRICT PROJECT 8422 Submitted By: Initiating Dept.)Div.; Mark Wenslawski, Associate Engineer Engineering and Technical Services/Capital Projects REVIEWED AND RECOMMENDED FOR BOARD A C TION; S. Mestetsky—Senior Engineer E. Lopez—Capital Projects Division Manager ey JM. Petit—Director of Engineering and Technical services Geneerr Roger1.al Manager ISSUE: On February 28, 2017, three (8) bids were received for the construction of the Walnut Creep Sewer Renovations, Phase 11, District Project 8422 (Project). The Board of Directors (Board) must award the contract or reject 'bids within 80 days of the bid opening. Authorize the General Manager to execute the Contract Documents subject to SUBMITTAL requirements. BACKGROUND: The Project is part of the ongoing sewer renovation within the Collection System Program of the Capital Improvements Budget to replace or rehabilitate aging sewer infrastructure that is in poor condition. This Project aligns with Central San's Strategic Plan, specifically the fallowing: • Gaal No. 1 — Provide exceptional customer service Gaal No. 2 — Strive to meet regulatory requirements • Goal No. 6 -- Maintain a reliable wastewater infrastructure The Project is primarily located in the Walnut Heights neighborhood between Mt. view Boulevard and Rudgear Road, includes Boulevard Way and other locations in Walnut Creek. The scope of work consists of replacement or rehabilitation of approximately 99100 lineal feet of 8-inch to 1 0-inch diameter sever mains, construction of manholes, and other related work within public rights-of-Way, easements, and near creeks. The project location map is identified in Attachment 1. Central San staff prepared the plans and specifications for the Project. The Engineer's estimate for construction is $2,800,000. This project was advertised on January 27 and February 2, 2017. Three (8) sealed bids ranging from $2,898,845 to $5,497,822 were received and publicly opened on February 28, 2017. The Engineering Department conducted a technical and commercial review of the bids and determined that Cratus, Inc. is the lowest responsive and responsible bidder. References were provided for Cratus, Inc. and staff received satisfactory feedback. Cratus, Inc. is new to Central San, Page 1 of 6 POSITION PAPER Board meeting Date: A p ri 161 2017 subject: AWARD A CONSTRUCTION CONTRACT AND AUTHORIZE THE GENERAL MANAGER TO EXECUTE CONTRACT DOCUMENTS SUBJECT TO SUBMITTAL REQUIREMENTS WITH CRATUS, INC. FOR THE CONSTRUCTION OF THE WALNUT CREED SEWER RENOVATIONS, PHASE 11, DISTRICT PROJECT 8422 however, has done sewer work in the City of Berkeley and San Jose, and is a prequalified sewer contractor for the San Francisco Public Utilities Commission. A summary of bids received is shown in Attachment 2. Central San will administer the construction contract and provide contract administration, inspection, survey, office engineering, and submittal review. Consultant inspection will be used to supplement staff on an as-needed basis. CEOA: Staff has concluded that this project is exempt from CEOA under District CEOA Guidelines Section 18302, because it involves replacement of existing sewer facilities at substantially the same locations and with the same purpose and level of activity as the facilities being replaced. Any capacity increases are for non-growth inducing, wet weather purposes. This project also is exempt under District CEQA Guidelines Section 15061(b)(3), since it can be seen with certainty that there is no possibility that the activity in question may have a significant effect on the environment. This certainty is based on Central San's experience with numerous sewer construction projects of this nature, the relatively short distances involved, and Central San's mitigating construction specifications. These specifications are standardized general and special conditions that are made part of the project bid documents to address environmental considerations, such as protecting trees and riparian areas, as well as compliance with applicable federal, state, county, district, municipal and local laws, ordinances, orders, and regulations. Approval of this project will establish the Board of Directors' independent finding that this project is exempt from CEOA. ALTERNATIVESICONSIDERATIONS: Reject all bids, which is not recommended. FINANCIAL IMPACTS: The total estimated project cost is $3,034,000, including design, bid price, contingency, construction management, and consultant costs as detailed in Attachment 3. This project is included in the Fiscal Year 2018-17 capital Improvement Budget on page 107 with a total estimated project budget of $3,780,000. The additional $184,000 budget required to fund the Project will be transferred from the Urgent Repairs Project, District Project 8434, which received only one bidder significantly above the engineer's estimate. A portion of the scope of work under the Urgent Repairs Project is anticipated to be completed under the proposed contract. Per Board Resolution 2018-018,the General Manager has the authority to transfer the additional budget after approval of the project. COMMUNITY OUTREACH: Central San held a public meeting on January 12, 2017, at the Collection System Operations department building in Walnut Creek to assist with any questions or concerns by the residents along the proposed construction alignments. Page 2 of 6 POSITION PAPER Board Meeting Date: A p ri 18, 2 017 subject. AWARD A CONSTRUCTION CONTRACT AND AUTHORIZE THE GENERAL MANAGER TO EXECUTE CONTRACT DOCUMENTS SUBJECT TO SUBMITTAL REQUIREMENTS WITH CRATUS, INC. FOR THE CONSTRUCTION OF THE WALNUT CREEK SEWER RENOVATIONS, PHASE 11, DISTRICT PROJECT 8422 In addition, staff has notified and met with several homeowners directly to discuss the upcoming sever work, construction impacts, and schedules for easements. COMMITTEE RECOMMENDATION: The Engineering and Operations Committee reviewed this project at its meeting on March 17, 2017, and recommended approval of the project. RECOMMENDED BOARD ACTION: Staff recommends the following: 1. Find that the project is exempt from CEQA, 2. Award a construction contract in the amount of $2,808,848 for the construction of the Walnut Creek sewer Renovations, Phase 11, District Project 8422, to Cratus Inc., the lowest responsive and responsible bidder, and 3. Authorize the General Manager to execute the Contract Documents subject to SUBMITTAL requirements and include up to 10-percent contingency. Attached Su actin Documents: 1. Project L oca tion Map 2. Summary of Bids 3. Post-Bid I Preconstruction Estimate Page 3 of 6 --� - -� {� Project Areas W-C --- 1 1 f L' , 1<1 rT 17 { "f qf{ ] f JJ "T I { [ f f ; <i ! y •Sir RD— UJ ;,j +�^ �'r ; f t t 4�..,. a ..�wf.••^".� i � t�{ } t L A f- f 't 1 ! d l K• 4 f ".r f Z 1 .`rF) ` ' •"_4. ~.._3 r 4, !r ,�..�•'•.'� ��-5 - �r, i.� � _ it •S � .-. � �_ r`.{, �� } � t � t, � [ � �ter. � � � V �..,•3-...�.�ti r `.f,. � �� ..,� � l �....,,..{ r {�,." 1�� Mir...... � �ti`\ ....i..._ ` 'r..,. ��• �.• �` � ,i.-��4•r,,�"' � � ..,..� { ••�...-. ,..�,i � � fir.�� �� � j -,,•�. ,}� � ;�,L` ��`�'.'C It Aft Ak-- t ! S,r �•.�e.,_.�� � �"� .l.r�/f?..,.....•d.. r`.�, ��� � �...�� .....-t � � j � f�1 �w �•_ �17 �1, �f�` F 95.. �� !!w.-.r...... Vit. • r ` � /r! S r • i ...= f1 1af(\ ,��ti \•tiNN •r +'�t �y. i - X.'. _ �_''Z•��-�Y•..rf �,, yam' i "t•-. t 1 \�' ` ~�__-. •t ii \ f�. ...x..-y-- t€ �!~ ~,�••-.. ..,J M,,,.,.-�•��� - .l�..� ... r S �• .T......._..r� � � � W _--._�Al :'�. 1 '� �^'y".'..��+-" t�,.:.`•. f�" ! r ~•kF `i t� r� �- h6�4-A RDS 1k` VA V ell 1 e S ++ f J t •� i N i `< err 1 i --gee r 0 2,400 4 1 `'- T � \ ` •`�`� �Feet Centrad Contra Costa Walnut Creek Sewer Renovation Phase 11 Attachment -4 Sanitary District District Project 8422 1 Project Location Page 4 of 6 i ATTACHMENT 2 WALNUT CREEK SEWER RENOVATIONS, PHASE 11 DISTRICT PROJECT 8422 SUMMARY OF BIDS PROJECT No,: 8422 No. of ADDENDA: o DATE: FEBRUARY 28, 2017 PROJECT NAME: WALNUT CREED SEWER ,RENOVATIONS, PHASE 11 PROJECT LOCATION: WALNUT CREED CA ENGINEER'S ESTIMATE: 2 800,000 NO, BIDDER BID PRICE Cratus, Inc. 1 $2�6989845 San Francisco, CA 94124 K. J. Woods Construction, Inc. 2 $3,180,808 San Francisco, CA 94124 Ranger Pipelines, Inc. 8 $5,497,822 Ban Francisco, CA 94124 BIDS OPENED BY/s/ Elaine R. Boehme CMC DATE: February 28, 2917 Page 5 of 6 ATTACHMENT 3 WALNUT CREEK SEWER RENOVATIONS, PHASE 11 DISTRICT PROJECT 5422 POST-BID 1 PRECONSTRUCTION ESTIMATE No, Item Description Amounts r/0 Construction Cost 1. CONSTRUCTION a. Construction Contract $2,6989845 b. 10%Contingency $259,155 c. Permit $35.000 SUBTOTAL-CONSTRUCTION COST $3,003,000 100% 2. CONSTRUCTION MANAGEMENT a. District Forces -Construction Management(Engineering, $2989000 Inspection, Survey) - Public Relations $25,990 - Right of Way $23000 b. Consultants - Inspection $35,000 -Material Testing $20,000 -Geotechnical and Arborist $10,000 SUBTOTAL-CONSTRUCTION MANAGEMENT $390,000 12.9% 3. PREBID EXPENDITURES a. Engineering (Design, Survey, Drafting) $541,000 SUBTOTAL- PREBID EXPENDITURES 541.000 18.0% 4. [TOTAL ESTIMATED PROJECT COST $3,934,009 w Page 6 of 6