HomeMy WebLinkAboutENGINEERING & OPERATIONS MINUTES 01-10-17 6. D . 1 )a)
Central Contra Costa Sanitary D shict
SPECIAL MEETING OF THE BOARD OF DIRECTORS:
CENTRAL CONTRA COSTA PAULH CAUSEY
SANITARY DISTRICT President
EDL
ENGINEERING & OPERATIONS JAMES Presidentt Pro TeA IroTeY
en
COMMITTEE MICHAEL R.MCCILL
TAD J.PILECKI
DAVID R WILLIAMS
M I N U T E S PHONE: (925)228-9500
FAX, (925)676-7211
Tuesday, January 10, 2017 www.centralsan.org
1:00 P.M.
2nd Floor Conference Room
5019 Imhoff Place
Martinez, California
Committee:
Chair Jim Nejedly
Member Paul Causey
Staff.•
Elaine Boehme, Secretary of the District (left after Item 3.)
Ann Sasaki, Deputy General Manager
Jean-Marc Petit, Director of Engineering and Technical Services
Danea Gemmell, Planning and Development Services Division Manager
Edgar Lopez, Capital Projects Division Manager
Dana Lawson, Senior Engineer (left after Item 4.)
Sasha Mestetsky, Senior Engineer
Ian Morales, GIS Analyst (left after Item 4.)
Amal Lyon, Accountant
Cindy Granzella, Senior Administrative Technician
1. Call Meeting to Order
Chair Nejedly called the meeting to order at 1.20 p.m.
2. Public Comments
None.
3. Confirm 2017 meeting dates
COMMITTEE ACTION: Confirmed meeting dates.
Engineering &Operations Committee Minutes
January 10, 2017
Page 2
4. Receive demonstration of Cityworks, the newly implemented Computerized
Maintenance Management System (CMMS)
This Item was taken out of order, after Item 5.
Ms. Lawson explained that the Collection System Operations Division (CSO) has
gone live with Cityworks and, within the next few weeks, the Treatment Plant and
Pumping Stations will go live as well. She stated that all CSO employees have
been provided tablets to utilize in the field.
Ms. Lawson and Mr. Morales provided a demonstration of the CMMS system,
showing the workflow, the connection with Geographic Information System (GIS)
to access maps, tracking of information, timestamps of all work entered, and
custom fields. They showed that reports are easily available and can be
customized. It can also measure employee productivity.
Ms. Lawson explained that Cityworks was configured to reduce paperwork and is
estimated to save almost one full-time employee (FTE) of clerical support each
year which can be redirected to maintenance activities or higher level data
analysis to support the maintenance program.
COMMITTEE ACTION: Received the information.
5. Review draft Position Paper to approve District-wide Patch Paving Contract
This Item was taken out of order, immediately following Item 3.
Member Causey asked what would happen if oil prices increased over the next
five years. Mr. Lopez explained that, per the contract, the contractor could
request an adjustment over the Consumer Price Index(CPI), but it would not be
a guarantee.
Chair Nejedly expressed concern with the issue of public bidding for a contract
such as this. Central San has used the current contractor for several years with
very satisfactory results, yet because of the requirement to publicly bid the
contract, that contractor was outbid by a very slim margin, leaving Central San no
choice but to go with the low bidder. Changing contractors will cost Central San
more in the long run. He said he will vote no on this contract when it goes before
the full Board on principal.
Member Causey was in favor of recommending Board approval, however, he
suggested incorporating the option of evaluating the contractor's performance
after the first year, before extending the contract.
Engineering &Operations Committee Minutes
January 10, 2017
Page 3
COMMITTEE ACTION: The Committee was split on this matter so it will be
presented to the full Board for consideration with no Committee
recommendation.
6. Receive Schedule of Fiscal Year 2016-17 Bids and Awards
Mr. Lopez reviewed the schedule included in the agenda materials.
Member Causey asked if the Board receives regular notifications of community
meetings held to inform the public of upcoming projects. Mr. Lopez said he
would verify that such notifications are provided.
COMMITTEE ACTION: Received the report.
7. Announcements
a. Future scheduled meetings:
The 2017 Meeting dates were confirmed.
b. Receive list of Scheduled/Parking Lot items
Member Causey requested that the easement item be a priority so that it
can be placed on the Capital Improvement Plan (CIP).
C. Walnut Creek Sewer Renovations, Phase 11, District Project 8422 will be
advertising on January 27, 2017 and February 2, 2017. Bids will be
opened on February 28, 2017. Construction contract estimate is
$2,800,000.
8. Suggestions for future agenda items
None.
9. Adjournment— at 2:05 p.m.