HomeMy WebLinkAbout09.d.1)b) Minutes-Engineering & Operations Committee 12-06-16Central Contra Costa SanitaDistric
11 IJ1h, iiilllli .1111 tllpl 11, 1:01:11,1,11,11,11 1 11,11.1 L.
9.d.1)b)
Protect/ 7
71 5079 itr'rl o Pi fat#It „CA 94_3.,-4392
REGULAR MEETING OF THE
CENTRAL CONTRA COSTA
SANITARY DISTRICT
ENGINEERING & OPERATIONS
COMMITTEE
MINUTES
Tuesday, December 6, 2016
10:30 a.m.
2nd Floor Conference Room
5019 Imhoff Place
Martinez, California
Committee:
Chair Paul Causey
Member Tad Pilecki
Staff:
Deputy General Manager Ann Sasaki
Director of Finance and Administration Phil Leiber
Director of Engineering and Technical Services Jean -Marc Petit
Planning and Development Services Division Manager Danea Gemmell
Capital Projects Division Manager Edgar Lopez
Finance Manager Thea Vassallo (left after Item 6.)
Senior Engineer Sasha Mestetsky (left after Item 6.)
Associate Engineer Nitin Goel (left after Item 4.)
Associate Engineer Amanda Schmidt (left after Item 3.)
Accountant Amal Lyon
Senior Administrative Technician Cindy Granzella
1. Call Meeting to Order
Chair Causey called the meeting to order at 10:30 a.m.
2. Public Comments
None.
BOARD OF DIRECTORS:
TAD J. PILECKI
President
PAUL H. CAUSEY
President Pro Tem
MICHAEL R. MCGILL
JAMES A. NEJEDLY
DAVID R. WILLIAMS
PHONE: (925) 228-9500
FAX: (925) 676-7211
www.centralsan.org
Engineering & Operations Committee Minutes
December 6, 2016
Page 2
3. Review draft Position Paper authorizing the General Manager to execute a
technical services agreement with Bess Test Lab, Inc. to provide as -needed
utility locating services for capital improvement projects
Mr. Lopez reviewed the draft Position Paper included in the agenda materials,
and responded to questions.
Member Pilecki requested that an explanation be added to the Position Paper on
why the prices have increased over time. Chair Causey also requested that staff
evaluate how much was spent in the last few years doing this type of work, and
what type of alternatives were considered in this evaluation. He also requested
that before considering entering into a second year of the contract, a discussion
be held about the effectiveness and efficiency of the work.
COMMITTEE ACTION: Reviewed and recommended Board approval with
changes discussed.
4. Review draft Position Paper and resolution authorizing the General Manager to
execute contracts with multiple specialty vendors and contractors for pilot work
supporting the Solids Handling Facilities Improvements Project
Mr. Petit reviewed the presentation included in the agenda materials, explaining
that the data obtained from the pilots is essential in determining how to move
forward and will assist the consultant in refining the design. Mr. Petit also stated
that staff needs to run both pilots simultaneously, so as to have many scenarios
available during testing.
Member Pilecki requested that the Position Paper be augmented to address the
pilots' connection to the Solids Handling Facilities Improvements Project that was
approved at the December 1, 2016 Board meeting, including the overall budget
for the project.
COMMITTEE ACTION: Reviewed and recommended Board approval.
5. Discuss Engineering Business Case Evaluations (BCE) for contingency projects
or scope not identified in the Capital Improvement Budget (CIB)
Mr. Lopez reviewed the graphic included in the agenda materials. Mr. Petit
explained that this is the procedure that staff uses before pre -design.
Member Pilecki also suggested adding a peer review step for large projects. Mr.
Petit indicated that this procedure is already implemented as peer review was
conducted on the Grayson Creek project in Pleasant Hill.
Engineering & Operations Committee Minutes
December 6, 2016
Page 3
Chair Causey suggested that staff begin incorporating its BCEs in the staff
recommendation portion of Position Papers for future projects.
COMMITTEE ACTION: Discussed and provided input to staff.
6.* Receive update on the Fiscal Year 2016-17 CIB through October 31, 2016.
This item was taken out of order immediately following Item 3.
Mr. Lopez distributed the Capital Improvement Budget (CIB) Report for the
period ending October 31, 2016, and the Capital Projects Contingency Tracking
Log. He also showed the slide from the CIB, all of which are attached. He
reviewed the updates from the original approved CIB to the current report, and
reviewed the highlighted budget adjustments on page 2 of the current report.
Member Pilecki requested a few modifications be made to the report for clarity.
COMMITTEE ACTION: Received the update.
7. Announcements
a. Future scheduled meetings:
2017 meetings to be determined.
b. Receive list of Scheduled/Parking Lot items
COMMITTEE ACTION: Received the announcements.
8. Suggestions for future agenda items
None.
9. Adjournment — at 12:50 p.m.
* Attachment
Item 6.
(Committee Handout)
PROPOSED CAPITAL IMPROVEMENTS PROGRAM
BUDGET FOR FY 2016-17
Program
Collection System
Treatment Plant
General Improvements
Recycled Water
CIB Contingency
Totals:
A
B D
Budgeted to Prior Fiscal
date Years
$34,197,100
$28,414,100
$7,876,000
$1,855,000
$0
$16,872,230
$26,241,377
$6,528,187
$1,342,647
$0
FY 16/17
$17,925,105
$13,125,000
$3,808,651
$500,000
$1,450,000
$72,342,200 $50,984,441 $36,808,756
Future FYs
$29,845,032
$34,820,723
$14,047,162
$1,127,353
$0
$79,840,270
Project Total
$64,642,367
$74,187,100
$24,384,000
$2,970,000
$1,450,000
$167,633,467
Item 6.
Fiscal Year 2016-17 (Committee Handout)
Capital Projects Contingency Log - PENDING
Beginning Balance:
Amt of This
Date Proj # Proj Title Allocation Proj Mgr
10/6/16 7291 PBB Building Seismic Upgrades $829,000 DeGroot
10/28/16 7347 Rew Automated Fill Station $11,000 Hodges
12/1/16 7348 Solids Handling Facilities Improvements $150,000 Hodges
Remaining Balance:
$1,450,000
Remaining Balance
$01,000
$610,000
$460,000
$460,000
PROGRAM /GM185L4 - Modified in Excel
CENTRAL CONTRA COSTA SANITARY DISTRICT
PROJ
NO PROJECT TITLE
TYPE CS Collection System
TYPE TP Treatment Plant
TYPE GI General Improvements
TYPE RW Recycled Water
CIB Continrenc
TOTAL DISTRICT
PROJECT
BUDGETS
PYS (FY 2015-16
$ 18,753,213
27,396,360
6,604,612
1.262,977
CAPITAL IMPROVEMENT BUDGET REPORT
PERIOD ENDING: 10/31/2016
Item 6.
(Committee Handout)
ACCOUNTING
PERIOD 4/2017
TOTAL TOTAL
EXPENDITURES PROJECT
PYS (FY 2015-16) CARRY-FORWAR
17,317,686
26,422,055
6,129,558
1.062,977 1
1,435,527
974,305
475,054
200,000
FY 2016-17
Approved
Budget
17,925,105
13,125,000
3,808,651
500,000
Budget
Adjustments
FY 2016-17
1450 000
TOTAL
BUDGET -TO -DATE
THRU FY 2016-17
19,360,632
14,099,305
4,283,705
TOTAL
SPENT IN
FY 2016-17
700,000
1450 000
C:\Users\CBradley\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\JQSWOXOQ\Capital Project report - Period 4 FY 16 17.xlsx Oct 16
6,371,450
2,741,285
782,804
144,937
416
TOTAL
REMAINING
BUDGET
12,989,160
11,358,016
3,500,905
555,061
1,450,000
29,853,142
PROGRAM /GM185L4 - Modified in Excel CAPITAL IMPROVEMENT BUDGET REPORT
CENTRAL CONTRA COSTA SANITARY DISTRICT PERIOD ENDING: 10/31/2016
ACCOUNTING
PERIOD 4/2017
A B
PROJECT TOTAL
PROJ BUDGETS EXPENDITURES
NO PROJECT TITLE PYS (FY 2015-16) PYS (FY 2015-16)
TYPEZOtoltactiortSvstem
5941 P5 Equipment Piping Replacement_
5982 Pipe Burst Blanket Contract
5991 PH Sewer Renovation Phase 2
5999 CIPP Blanket Contract
6602 South Jackson CAD
8403* Buchannan Air Puma St Realocement
8412 PH Grayson Creek Trunk
8414* Moraga PS Chopper Puma
8415 Martinez Ph 4 Sewer Renovation
8417 Survey Monument Install
8418 Collection System Modeling
8419 Collection System Planning LT
8420 Development Sewerage
8422 WC Sewer Renovation Phase 11
8423 N. Orinda Sewer Renovation Phase 6
8426 Lafayette Sewer Renovation Phase 10
8429 Fairview Maltby
8430 Lafayette Sewer Renovation Phase 11
8431 Collection System Master Plan
8433 IS. Orinda Sewer Renovation Phase 6
8434 (Urgent Projects
8435 IWC Sewer Renovation Phase 12
8436 Moraga/ Crossroads PS Project
8437 Martinez Sewer Renovation Phase 5
Rounding
S 740.000 657.800
708.000 702.031
150.000 139.878
472.000 446.296
80.000 29.602
83 83
2,824,408 - 2,219,040
19.964 19.964
3.922.000 3.844.257
200.000 185.918
1.041.600 1.040.070
470.000 462.421
_ _ 3.071.102 3.071.102
340,000 232,403
_ 1.758.500 974.916
1.505.000 2.504.597
150.000 1 135.650
540,556_ I _
60,000
50,000
150,000
540,556
57,887
27,677
25,538 1
C(A•B)_
TOTAL
PROJECT
CARRY -FORWARD
0 ,E
FY 2016-17 Budget
Approved Adlustments
Budget FY 2016-17
F (C+D+E]
TOTAL
BUDGET -TO -DATE
THRU FY 2016-17
G H (F -G)
TOTAL TOTAL
SPENT IN REMAINING
FY 2016-17 BUDGET
82,200 10,000 175,000 267,200 86,608 180,592
_ 5.969 - 300.000 305,969 2,924 303,045 (00
10.122 150,000 160,122 30,129 129,993
25.704 - 25,704 11,197 14,507
50.398 253,867 304,265 24,284 279,981
605 368 - _ 8E900,000 5001000 101005,368 3,192,093 6,813,27501
77.743 5,000 (5,000) 77.743 7,1.71 70,572 t
14.082 50,000 64,082 195 63,887
1.530 200.000 201,530 2,690 198,840
7,579 200,000 207,579 47,200 160,379
- 800,000 800,000 444,801 355,199
107.597 545,000 652,597 113,522 539,075
28.3.584 2.154.000 (100,000) 2,337,584 1,317,277 1,020,307
403 2.250,238 (1,225,238) 1,025,403 733,805 291,598
350,000 (175,000) 175,000 175,000
14.350 500,000 514,350 148,672 365,678
670,000 670,000 - 670,000
12,000 90,238 102,238 7,239 94,999
2,113 440,000 442,113 90,721 351,392
6.)
150,000 150,000 150,000
22,323 400,000 422,323 7,914 414,409
124,462 325,000 449,462 103,008 346,454
(22)
* lntalic !Projects open but not in C18 for 16/17 1
N:\Accounting\GMTEMP1\Financials and Closing\2017 Financials\Capital Project report - Period 4 FY 16 17.xlsx Oct 16
PROGRAM /GM185L4 - Modified in Excel CAPITAL IMPROVEMENT BUDGET REPORT
CENTRAL CONTRA COSTA SANITARY DISTRICT PERIQD ENDING: 10/31/2016
ACCOUNTING
PERIOD 4/2017
A B
PROJECT TOTAL
PROJ BUDGETS EXPENDITURES
NO PROJECT TITLE PYS (FY 2015-16i, PYS (FY 2015-16)
TYPE TP TreatrOent PIafl
7285 Primary Treatment Renovation
7286
7291
7292
7297
7301
7304
7310
7311
7312
7314
7315
7317
7319
7320
7322
7324
7326
7327
7329
7330
7339
7341
7343
7348
C A -B
TOTAL
PROJECT
CARRY -FORWARD
D E F C+D+E
FY 2016-17 Budget TOTAL
Approved _ Adjustments BUDGET -TO -DATE
Budget FY 2016-17 THRU FY 2016-17
$ 14,868,112 14,695,729 172,383 50,000
Centrifuge & Cake Pumps 128,000 86,061 41,939 I 500,000
Pump & Blower Bldg Seismic Upgrade 695,000 678,125 16,875 2,900,000
Switchgear Refubishment - Ph 2 320,000 280,596 39,404 100,000
Caustic Addition to MHF 1,421,600 1,377,126 44,474 50,000
Treament Plant Planning 2,601,464 2,601,464 350,000
Instr & Controls PLC Upgrade 335,000 272,662 62,338 100,000
Piping Renovations - Phase 9 (Closed in FY 2015-16) 1,569,4101,569,410 25,000
TP Safety Enhancement Ph 4 340,000 338,945 1,055 150,000
Ask Facility Improvements 90,000 81,9568,044 800,000
Urgent Repairs 5,000 5,000 110,000
Applied Research and Innovations 232,274 195,738 36,536 _ 175,000
Plant Control System Network Upgrades 160,000 134,860 25,140 100,000
Laboratory Upgrades & Repair 471,500 357,180 114,320 I 700,000
Plant Energy Optimization90,000 91,179 (1,179) 50,000
Fire Protection System Ph 2 240,000 88,898 151,102 I 600,000 I
Sub 16Switchgear Replacement 688,000 687,472 528 1 2,144,000
Equipment Replacement FY 15 -FY 24 406,000 356,898 49,102 I 460,000
Headwork's Screening 900,000 756,172 143,828 I 1,600,000
MHF Burner Upgrade 100,000 46,385 53,615 I 270,000 1
Piping Renovation Phase 9 - - - 241,000 1
Plant Control System I/O Replacement 20,000 12,631 7,369 300,000 1
WC/Grayson Creek Levee Rehab - 150,000 1
TP Master Plan 1,715,000 1,712,568 2,432 800,000 1
Wet Scrubber Replacement - LT 400,000 1
Rounding
(50,000)
(25,000)
578,000
(188,000)
(315,000)
O H F -G
TOTAL TOTAL
SPENT IN REMAINING
FY 2016-17 BUDGET
222,383 161,464 60,919
541,939 76,824 465,115
2,916,875 102,716 2,814,159
139,404 751 138,653
44,474 7,371 37,103
350,000 133,431 216,569
162,338 12,353 149,985
151,055 128 150,927
808,044 3,212 804,832
115,000 1,863 113,137
211,536 2,472 209,064
125,140 5,085 120,055
814,320 688,381 125,939
626,821 26,757 600,064
751,102 92,736 658,366
1,956,528 1,230,252 726,276
509,102 63,582 445,520
1,743,828 25,888 1,717,940
323,615 36,754 286,861
241,000 I 69,689 171,311
307,369 434 306,935
150,000 I 150,000
487,432 (858) 488,290
400,000 400,000
(4)
14,098,305 2,741,285 11,358,016
C:\Users\CBradley\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\JQSWOXOQ\Capital Project report - Period 4 FY 16 17.xlsx Oct 16
PROGRAM /GM185L4 - Modified in Excel CAPITAL IMPROVEMENT BUDGET REPORT
CENTRAL CONTRA COSTA SANITARY DISTRICT
PROJ
NO
8207
8227
8230
8232
8233
8234
8236
8237
8238
8239
8240
8242
8243
8516
8517
9999
PROJECT TITLE
General Security and Access
GDI Treatment Plant
Capital Legal Services
GDI SMMS Replacement (Closed Project FY 2015-16)
PROJECT
BUDGETS
PYS (FY 2015-16)
47,616.0
222,444
118,665
PERIOD ENDING: 10/31/2016
TOTAL
EXPENDITURES
PYS (FY 2015-16) CARRY -FORWARD
TOTAL
PROJECT
47,616
FY 2016-17 Budget
Approved Adjustments
Budget FY 2016-17
222,444
118,665
973,222
973,222
42,556
20,000 _
4,665
(4,665)
TOTAL TOTAL
BUDGET -TO -DATE SPENT IN
THRU FY 2016-17 FY 2016-17
CSOD Facility Improvements
HOB Improvements
District Easements
Buffer and Rental Improvements
Asset Management
POD Office Improvements
IT Development
CMMS Replacement
Server Room Relocation
District Equipment Acquisition
(Vehicle Replacement Program
(Capital Project Clearing (Accounting Use Only)**
(Rounding
173,697
637,025
123,382
266,816
1,047,921
477,356
173,697
637,025
123,382
266,816
1,047,921
477,356
25,000
447,000
15,000
50,000
800,000
120,410
4,665
1,518,794
385,470
102,204
450,000
60,000
1,132,628
385,470
102,204
421,112
386,166
900,000 L
28,888
60,000
To record beginning balance of activity as part of capital reporting change at YE 15/16
-i3
134,020
650,000
76,000
524,000
42,556
20,000
25,000
447,000
19,665
50,000
800,000
120,410
1,286,166
134,020 Ir
650,000
104,888
524,000
60,000
4,301
306,514
2,921
10,969
273,902
111,895
33,444
6,352
32,509
ACCOUNTING
PERIOD 4/2017
TOTAL
REMAINING
BUDGET
(3)
42,556
15,699
25,000
140,486
16,744
39,031
526,098
120,410
1,174,271
100,576
643,648
72,379
524,000
60,003
4J
3,500,805
v v C %\ A i FIS Ce_° ✓,�
C:\Users\CBradley\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content_Outlook\JQSWOXOQ\Capital Project report - Period 4 FY 16 17.xisx Oct 16
PROGRAM /GM185L4 - Modified in Excel
CENTRAL CONTRA COSTA SANITARY DISTRICT
PROJ
NO
PROJECT TITLE
7300 Refinery REW
7306 Zone 1 Recycled Water
7344 Recycled Water Planning
7345 Filter Plant
7346 Surge Analysis 16-17
7347 Rew Automated Fill Station
7350 Residential Fill Station Improv
Rounding
CAPITAL IMPROVEMENT BUDGET REPORT
PERIOD ENDING: 10/31/2016
PROJECT TOTAL
BUDGETS EXPENDITURES
PYS (FY 2015-14 PYS IFY 2015-16)
354,536 354,536
430,079 430,079
108,681 108,681
87,327
282,354
87,327
82,354
TOTAL
PROJECT
CARRY•FORWAR
200,000
FY 2016-17
Approved
Budget
40,000
37,815
102,185
200,000
55,000
15,000
50,000
Budget TOTAL
Adiustments BUDGET -TO -DATE
FY 2016-17 THRU FY 2016-17
40,000
37,815
102,185
200,000
55,000
15,000
250,000
TOTAL
SPENT IN
FY 2016-17
5,764
11,806
6,886
32,421
88,060
ACCOUNTING
PERIOD 4/2017
TOTAL
REMAINING
BUDGET
34,236
26,009
95,299
200,000
55,000
(17,421)
161,940
(2)
Old
977
CONTINGENCY -ALL PROGRAMS
1,450,000
1,450,000
1,450,000
GRANO TOTAL.
54,017462 50,932,276 3„084,886 36,808,736
39,893,642 10,040,476 29,853442
C:\Users\CBradley\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\JQSWOXOQ\Capital Project report - Period 4 FY 16 17.xlsx Oct 16