Loading...
HomeMy WebLinkAbout07.b. Award contract to Overmiller, Inc. DBA: Roto-Rooter Sewer Service for providing nondestructive potholing of underground utilitiesCentral Contra Costa Sanitary District BOARD OF DIRECTORS POSITION PAPER 7.b. Board Meeting Date: November 17, 2016 Subject: AWARD A CONSTRUCTION CONTRACT AND AUTHORIZE THE GENERAL MANAGER TO EXECUTE CONTRACT DOCUMENTS SUBJECT TO SUBMITTAL REQUIREMENTS WITH OVERMILLER, INC. DBA: ROTO -ROOTER SEWER SERVICE FOR PROVIDING NONDESTRUCTIVE POTHOLING OF UNDERGROUND UTILITIES FOR DISTRICT PROJECTS Submitted By: Amanda Schmidt, Associate Engineer REVIEWED AND RECOMMENDED FOR BOARD ACTION: Initiating Dept/Div.: Engineering and Technical Services/Capital Projects S. Mestetsky — Senior Engineer E. Lopez -- Capital Projects Division Manager JM. Petit — Director of Engineering and Technical Services Roger S. Bailey General Manager ISSUE: On October 25, 2016, seven (7) sealed bids were received and opened for the District -Wide Nondestructive Potholing of Underground Utilities. The Board of Directors (Board) must award the contract or reject bids within 50 days of the bid opening. Authorization is also required for the General Manager to execute the Contract Documents subject to SUBMITTAL requirements. BACKGROUND: The work supports the Capital Improvements Program which aligns with the District's Strategic Plan, specifically Goal No. 5, which is "Maintain a Reliable Infrastructure." In total, District staff authorizes up to 200 potholes each year during the design of collection system renovation projects. Potholing exposes underground utilities along the proposed sewer alignment at points of potential conflict. The pothole results are used to evaluate alternatives during design and to minimize change orders during construction. Potholing includes pavement restoration and traffic control, as required by the permitting agencies. Bidding the nondestructive potholing services on a periodic basis results in a lower overall cost and reduces paperwork associated with negotiating and issuing separate individual contracts per project. The bid request establishes a unit cost for each portion of the work while obtaining the lowest overall cost for the District. District staff prepared the specifications and bid documents for this contract. The Engineer's estimate is $150,000 per year, with an optional extension for two one-year periods, totaling $450,000. The project was advertised on October 12 and 17, 2016. Seven (7) sealed bids ranging from $148,910 to $282,800 were received and publicly opened on October 25, 2016. Page 1 of 3 POSITION PAPER Board Meeting Date: November 17, 2016 Subject AWARD A CONSTRUCTION CONTRACT AND AUTHORIZE THE GENERAL MANAGER TO EXECUTE CONTRACT DOCUMENTS SUBJECT TO SUBMITTAL REQUIREMENTS WITH OVERMILLER, INC. DBA: ROTO - ROOTER SEWER SERVICE FOR PROVIDING NONDESTRUCTIVE POTHOLING OF UNDERGROUND UTILITIES FOR DISTRICT PROJECTS The Capital Projects Division reviewed the bids and determined that Overmiller, Inc. DBA: Roto -Rooter Sewer Service was the lowest responsive and responsible bidder with a bid amount of $148,910. District staff may extend the contract for two additional one-year periods at the bid prices, provided the initial work is successful and the prices are still favorable to the District. A summary of bids received is shown in Attachment 1. CEQA: Staff has concluded that this project is exempt from the California Environmental Quality Act (CEQA) under District CEQA Guidelines Section 15262, since it will provide information for design of sewer improvements and will not have a legally -binding effect on later activities. Approval of this project will establish the Board of Directors' independent finding that this project is exempt from CEQA. FINANCIAL IMPACTS: Approximately $148,910 per year with the option to extend for two additional one-year periods, totaling $446,730 for three years. The contract will be paid under the budgeted sewer renovation projects and other projects in the Board -adopted Capital Improvement Program. ALTERNATIVES/CONSIDERATIONS: Reject all bids and rebid the contract, or issue individual contracts each time nondestructive potholing of underground utilities is needed. Neither option is recommended. COMMITTEE RECOMMENDATION: The Engineering and Operations Committee reviewed this subject at the meeting on November 8, 2016, and recommended approval to award the contract. RECOMMENDED BOARD ACTION: Staff recommends the following: 1. Find that the project is exempt from CEQA, 2. Award a construction contract in the amount of $148,910 for the District -Wide Nondestructive Potholing of Underground Utilities to Overmiller, Inc. DBA: Roto -Rooter Sewer Service, the lowest responsive and responsible bidder, and 3. Authorize the General Manager to execute the Contract Documents subject to SUBMITTAL requirements, and 4. Authorize the General Manager to execute up to two additional extensions for a total Contract amount of $446,730. Attached Supporting► Document: 1. Summary of Bids Page 2 of 3 ATTACHMENT 1 DISTRICT -WIDE NONDESTRUCTIVE POTHOLING OF UNDERGROUND UTILITIES DISTRICT PROJECT 2016-01 SUMMARY OF BIDS PROJECT NO.: 2016-01 DATE: OCTOBER 25, 2016 PROJECT NAME: DISTRICT -WIDE NONDESTRUCTIVE POTHOLING OF UNDERGROUND UTILITIES PROJECT LOCATION: VARIOUS LOCATIONS IN CONTRA COSTA COUNTY NO. OF ADDENDA: 1 ENGINEER'S ESTIMATE: $150000/YEAR NO. BIDDER BID PRICE Overmiller, Inc. 1 DBA: Roto -Rooter Sewer Service $148,910 Concord, CA 94520 Bess Testlab, inc. 2 $154,560 Hayward, CA 94545 B&M Builders, Inc. 3 $173,550 Rancho Cordova, CA 95742 Clean Harbors 4 $179,600 Bakersfield, CA 93312 Pipe and Plant Solutions, Inc. 5 $212,990 Berkeley, CA 94710 Hess Construction Co., Inc. 6 $255,000 American Canyon, CA 94503 Exaro Technologies, Inc. 7 $282,800 Burlingame, CA 94010 BIDS OPENED BY: Elaine R. Boehme, CMC DATE: October 25, 2016 Page 3 of 3