Loading...
HomeMy WebLinkAbout08.a.1) General Manager Written Announcements8.a.1) Board Meeting of November 3, 2016 Written Announcements: OUT-OF-STATE CONFERENCE a) General Manager Roger S. Bailey to Attend Water Leaders and American Water Summit 2016 in Miami, Florida from December 4 — 8, 2016 General Manager Roger S. Bailey will be attending the Water Leaders and American Water Summit which will be held in Miami, Florida from December 4 through 8, 2016. This conference will provide Mr. Bailey the opportunity to participate in discussions on the current trend issues facing the water sector in the United States. Mr. Bailey will participate in a five -panel roundtable discussion. Attendees participating in the roundtable discussions at this conference are by invitation only. The cost of the conference will be covered by the event sponsors, Global Water Leaders. The only upfront cost to the District is Mr. Bailey's roundtrip airfare, which will be refunded to the District after the conference. ENERGY CONSUMPTION b) Update on the District's Energy Consumption The District actively manages greenhouse gas (GHG) emissions in the most cost- effective and environmentally responsible manner and optimizes use of energy at its facilities. The Comprehensive Wastewater Master Plan (CWMP) currently underway is exploring new energy technologies, including alternative sources of energy (e.g., solar; wind; biogas; fats, oils and grease (FOG); green wastes) in an effort to further optimize the District's energy utilization and strive towards energy neutrality. The District's energy usage report for September 2016 appears on the following page. CCCSD September 2016 Energy Usage Treatment Plant Campus 85% of Total $ HHWCF (Gas and Misc(Gas and Eicetricity; Electrici,1$9890% $1,92E11% ! POD Reser, & Serv. Charges $16,134 6% Monthly Total Energy Cost: Pump Stations 13% of Total $ $340,627 $370.31 /MG Treated 2,480 kWh/MG Treated Operating Cost of CCCSD By Month $400,000 $350,000 5316,906 5300,000 5250,000 5200,000 $150,000 5100,0 00 550,000 $0 Jun -16 io POD Natural Gas *POD Landfill Gas ■ POD Demand Charge $341,715 Jut -16 5366,190 $340,646 Aug -16 Sep -16 ■ Natural Gas Delivery * Other Energy Charges • POD Reserv. & Serv. Charges 2,500 2,000 1,500 '0 1,000 500 0 CSO Facility 2% of Total $ CSO Electricity, 15,494, 79% CSO Vehicle Bay Electricity, $1,110,16% .0 Gas, $342,5% .0 Vehicle Bay Gas, $10, 0% TP Electricity by Source in kWh TP MMBTU of Gas Consumed Jun -16 Jul -16 Aug -16 *Cogen • Standby Power " PG&E TP Electricity by Source in kWh TP MMBTU of Gas Consumed 30 25 15 10 2012 2013 2014 2015 2016 Year .Cogen • Standby Power x PG&E 600.0 500.0 § 400.0 15 0 300.0 200,0 100.0 0.0 2012 2013 2014 2015 2016 Year ■ Natural Gas • Landfill Gas Sep -16 50 45 40 5 35 § 30 25 a 20 •. 15 10 5, 0 Jun -16 120 100 80 60 3 40 Jul -16 Aug -16 I Natural Gas • Landfill Gas Sep -16 TP Energy by Source in kWh Equivalence 13.55 1 27.41 4.94 19.67 4.92 1 22.67 1.73 1 2,59 1 25.98 20 21.88 IIII 0 2012 2013 2014 2015 2016 Year • Aux Boilers WHB Steam • Cogen Steam • Cogen Electrical *Standby Power • PG&E This month CCCSD produced and purchased electricity at an average rate of $0.1196 /kWh Including maintenance Anthropogenic GHG Emissions MTCO20 25000 20000 15000 10000 5000 25000 20000 15000 10000 5000 0 Compared to $o.1635 /kWh From PG&E CCCSD produces steam at an average rate of $0.00445/Ib steam Cogen has a breakeven cost of Natural gas was purchased at a rate of $8.86 /MMBTU $s.03 /MMBTU