BOARD OF DIRECTORS
POSITION PAPER
6.a.
Board Meeting Date: November 3, 2016
subject: AUTHORIZE THE GENERAL MANAGER TO AMEND AN EXISTING
PROFESSIONAL SERVICE AGREEMENT WITH THE CAROLLO
ENGINEERS, INC. AND CH2M TEAM FOR A SECURITY STUDY
Submitted By: Initiating Dept./Div.:
Dan Frost
Senior Engineer
Engineering & Technical Services /
Planning & Development Services
REVIEWED AND RECOMMENDED FOR BOARD ACTION:
A. Sasaki — Deputy General Manager & Director of Operations
JM. Petit — Director of Engineering & Technical Services
D. Gemmell — Planning & Development Services Division Manager
S. Deutsch — Risk Management Administrator
1 �J‘ ")
Roger S. Bailely
General Manager
ISSUE: Board of Directors' authorization is required for the General Manager to amend
an existing professional service agreement in an amount greater than $100,000.
BACKGROUND: The proposed work supports the District's Strategic Plan, Goal Five,
Strategy 3 -- Protect District Personnel and Assets from Threats and Emergencies.
As part of the Comprehensive Wastewater Master Plan, CH2M completed a preliminary
security site assessment of the District's wastewater treatment plant and two
representative pump stations. As a result of this assessment, it was determined that a
more comprehensive security study would be required to identify necessary security
improvements to District facilities in addition to identifying improvements to the District -
wide security program. The study will include facility site inspections, stakeholder
meetings and interviews, security system study, security technology review, and
recommendations on necessary improvements.
CH2M will use the principles of the ASME/AWWA J100 Risk Analysis and Management
for Critical Asset Protection methodology (RAMCAP® J100) as the basis for the
assessment of District facilities. J100 is a comprehensive approach that enables the
estimation of relative risks across multiple assets while considering both malevolent and
natural hazards. The RAMCAP method is a 7 -step process including: 1) Asset
Characterization; 2) Threat Characterization; 3) Consequence Analysis; 4) Vulnerability
Analysis; 5) Threat Analysis; 6) Risk/Resilience Analysis; and 7) Risk/Resilience
Management. Upon the conclusion of the risk analysis, conceptual security and risk
reduction recommendations will be included the study.
On June 4, 2015, the Board of Directors authorized an agreement with the Carollo
Engineers, Inc. and CH2M Team for the Comprehensive Wastewater Master Plan
(CWMP) for an amount not to exceed $4,044,988. An additional $210,000
(approximately 5 percent of the original agreement amount) is needed to complete the
Pagel of 2
POSITION PAPER
Board Meeting Date: November 3, 2016
Subject:
AUTHORIZE THE GENERAL MANAGER TO AMEND AN EXISTING
AGREEMENT WITH THE CAROLLO ENGINEERS, INC. AND CH2M TEAM
FOR PROFESSIONAL CONSULTING SERVICES FOR A SECURITY
STUDY
comprehensive security study recommended by CH2M. Therefore, the total for the
CWMP agreement would be revised for an amount not to exceed $4,254,988.
ALTERNATIVES/CONSIDERATIONS: The Board of Directors could decide to
postpone or not pursue the security study.
FINANCIAL IMPACTS: The total costs for the security study is anticipated to be
$210,000. The CWMP budget under District Project 7343 has adequate project
contingency funds to include the security study as part of the project scope.
COMMITTEE RECOMMENDATION: This matter was not reviewed by a Board
Committee.
RECOMMENDED BOARD ACTION: Authorize the General Manager to execute an
amendment to Agreement 043046 with the Carollo Engineers, Inc. and CH2M Team to
increase the agreement cost ceiling from $4,044,988 to $4,254,988 for a security
vulnerability study.
Attached Supaortincl Document:
1. PowerPoint Presentation
Page 2 of 2
ATTACHMENT 1
COMPREHENSIVE WASTEWATER
MASTER PLAN
CONSIDER AMENDING CWMP CONTRACT TO
CONDUCT A SECURITY VULNERABILITY STUDY
Board Meeting
November 3, 2016
Jean -Marc Petit, Director of Engineering and Technical Services
Danea Gemmell, Planning & Development Services Division Manager
Dan Frost, Senior Engineer, Planning and Applied Research
Shari Deutsch, Risk Management Administrator
BACKGROUND
• The proposed wor z
supports the District's
Strategic P an, Goal
Five, Strategy 3 —
Protect District
Personne and Assets
from Threats and
Emergencies.
SECURITY SITE ASSESSMENT
As part of the Comprehensive
Wastewater Master Plan,
CH2M completed a preliminary
security site assessment of the
District's wastewater treatment
plant and two representative
pump stations.
• As a result of this assessment,
it was determined that a more
comprehensive security
vulnerability study would be
required to identify necessary
security improvements to
District facilities in addition to
identifying improvements to the
District -wide security program.
NEW SITE SECURITY
VULNERABILITY STUDY
The Site Security
Vulnerability Study will
include:
Faci ity site ins sections
Staeio der meetings and
interviews
Security system study
Security tecino ogy review
Recommendations on
necessary im movements
Recommendations for
consistency in district-wide
security grogram and
aroaci
APPROACH FOR THE SECURITY
VULNERABILITY STUDY
• CH2M will use the principles of the ASME/AWWA J100 Risk
Analysis and Management for Critical Asset Protection
methodology (RAMCAP® J100) as the basis for the assessment
of District facilities. J100 is a comprehensive approach that
enables the estimation of relative risks across multiple assets
while considering both malevolent and natural hazards.
• The RAMCAP method is a 7 -step process including:
• 1) Asset Characterization;
• 2) Threat Characterization;
• 3) Consequence Analysis;
• 4) Vulnerability Analysis;
• 5) Threat Analysis;
• 6) Risk/Resilience Analysis;
• 7) Risk/Resilience Management. (Upon the conclusion of the risk
analysis, conceptual security and risk reduction recommendations
will be included the study.)
War
ILA
Ar I
and Relaitnor
idanagenttnto(tar
Systemand ighsimtrir
BOARD ACTION REQUESTED TO AMEND
CWMP CONTRACT TO CONDUCT A
SECURITY VULNERABILITY STUDY?
• Increase CWMP contract by $210,000
• Authorize the General Manager to execute
an amendment to Agreement 043046 with
the Carollo Engineers, Inc. and CH2M Team
to increase the agreement cost ceiling from
$4,044,988 to $4,254,988 for a security
vulnerability study
QUESTIONS?