HomeMy WebLinkAbout05. Award a construction contract, and amend existing agreement with Brown and Caldwell for Headworks Screening Upgrade, DP 7327Central Contra Costa Sanitary District
BOARD OF DIRECTORS
POSITION PAPER
5.
Board Meeting Date: November 3, 2016
Subject:
AWARD A CONSTRUCTION CONTRACT AND AUTHORIZE THE
GENERAL MANAGER TO EXECUTE CONTRACT DOCUMENTS
SUBJECT TO SUBMITTAL REQUIREMENTS WITH INSERT COMPANY;
AND AUTHORIZE A PROFESSIONAL ENGINEERING AGREEMENT
AMENDMENT WITH BROWN AND CALDWELL FOR THE
CONSTRUCTION OF THE HEADWORKS SCREENING UPGRADE,
DISTRICT PROJECT 7327
Submitted By:
Brad Leidecker, Associate Engineer
RE VIE WED AND RECOMMENDED FOR BOARD ACTION:
C. Mizutani — Senior Engineer
E. Lopez — Capital Projects Division Manager
JM. Petit — Director of Engineering and Technical
Services
Initiating Dept./Div.:
Engineering and Technical
Services/Capital Projects
[Delete if not neededl
K. Alm Roger S. Bailey
Counsel for the District General Manager
ISSUE: On October 19, 2016, insert number (#) sealed bids were received and opened
for the construction of the Headworks Screening Upgrade, District Project 7327. The
Board of Directors (Board) must award the contract or reject bids within 50 days of the
bid opening. Authorize the General Manager to execute the Contract Documents
subject to SUBMITTAL requirements.
BACKGROUND: The Capital Improvement Budget (CIB) Priority Ranking for this
project is critical and the work aligns with the District's Strategic Plan, specifically Goal
No. 6, which is "Maintain a Reliable Wastewater Infrastructure."
The project will install four new multi -rake bar screens with fine openings to replace the
existing climber screens and grinder, a screenings conveyance sluiceway, washer
compactors, and a screenings disposal facility. Two of the existing climber screens and
grinders will be rebuilt and installed at Headworks in the two spare influential channels
to allow for more operational reliability and process redundancy. The project work area
is shown in Attachment 1.
This project will significantly improve the following challenges:
• Grinding of the screenings has resulted in several negative impacts, such as
increased plastics and floatables in the liquid and solid streams, and equipment
fouling throughout the treatment plant.
• The existing screens are not enclosed. The new screening removal equipment
and new enclosed facilities have been designed to help reduce odor issues.
Pagel of 6
POSITION PAPER
Board Meeting Date: November 3, 2016
Subject AWARD A CONSTRUCTION CONTRACT AND AUTHORIZE THE
GENERAL MANAGER TO EXECUTE CONTRACT DOCUMENTS SUBJECT
TO SUBMITTAL REQUIREMENTS WITH INSERT COMPANY; AND
AUTHORIZE A PROFESSIONAL ENGINEERING AGREEMENT
AMENDMENT WITH BROWN AND CALDWELL FOR THE
CONSTRUCTION OF THE HEADWORKS SCREENING UPGRADE,
DISTRICT PROJECT 7327
• Maintaining and sourcing replacement parts for the existing screens and grinders
is becoming more difficult and expensive.
Brown and Caldwell (B&C) is the design engineer and prepared the plans and
specifications for the project. The Engineer's estimate for construction is $6,500,000.
This project was advertised on September 15 and 22, 2016. Number sealed bids
ranging from $X to $X were received and publicly opened on October 19, 2016.
The Engineering Department conducted a technical and commercial review of the bids
and determined that is the lowest responsive and responsible bidder with a bid
amount of $X. A summary of bids received is shown in Attachment 2.
District staff will administer the construction contract and provide construction
management, oversee consultant services, and coordinate activities with Plant
Operations.
District staff recommends retaining B&C to provide support services during the
construction phase of this project, which includes reviewing shop drawings and
submittals, responding to design questions, evaluating change order requests,
performing site visits to verify design compliance, controls integration support, structural
inspections, and other related activities. An as -needed construction support services
agreement amendment with a cost ceiling of $350,000 has been negotiated with B&C
for this project. To date, the total cost ceiling for the B&C agreement is at $1,090,000,
which included design of the Substation 16 Switchgear (Sub 16) Replacement and
Headworks Screening Upgrade and construction support services for the Sub 16
project. The proposed agreement revision will increase the total agreement cost ceiling
to $1,440,000.
CEQA: Staff has concluded that this project is exempt from the California
Environmental Quality Act (CEQA) under District CEQA Guidelines Section 15302,
since it involves replacement of existing public facilities at the same location and with
the same purpose. Approval of this project will establish the Board of Directors'
independent finding that this project is exempt from CEQA.
FINANCIAL IMPACTS: The total project cost is anticipated to be $8,400,000, which
includes planning, design, bid price, construction, contingency, and construction
management as shown in ttahnment $. This project is included in the Fiscal Year (FY)
2016-17 District Budget on page 137 with a total estimated project budget of
$8,400,000.
Page 2 of 6
POSITION PAPER
Board Meeting Date: November 3, 2016
Subject AWARD A CONSTRUCTION CONTRACT AND AUTHORIZE THE
GENERAL MANAGER TO EXECUTE CONTRACT DOCUMENTS SUBJECT
TO SUBMITTAL REQUIREMENTS WITH INSERT COMPANY; AND
AUTHORIZE A PROFESSIONAL ENGINEERING AGREEMENT
AMENDMENT WITH BROWN AND CALDWELL FOR THE
CONSTRUCTION OF THE HEADWORDS SCREENING UPGRADE,
DISTRICT PROJECT 7327
ALTERNATIVES/CONSIDERATIONS: Reject all bids, which is not recommended.
COMMITTEE RECOMMENDATION: The Engineering and Operations Committee
reviewed this subject at its meeting on October 21, 2016, and recommended approval
to award the construction contract.
RECOMMENDED BOARD ACTION: Staff recommends the following:
1. Find that the project is exempt from CEQA,
2. Award a construction contract in the amount of $X for the construction of the
Headworks Screening Upgrade, District Project 7327, to , the lowest
responsive and responsible bidder,
Authorize the General Manager to execute the Contract Documents subject to
SUBMITTAL requirements,
4. Authorize the General Manager to execute an agreement amendment with
Brown and Caldwell to increase the cost ceiling from $1,090,000 to $1,440,000 to
provide as -needed construction services.
Attached Supporting Documents:
1. Project Location Map
2. Summar of Bids
.--P st-moi -Pieconstruction Estimate
Page 3 of 6
0 100 200
FST
CONSTRUCTION
STAG I NG AREA
a
0
ATTACHMENT 1
HEADWORKS SCREENING UPGRADE
DISTRICT PROJECT 7327
LOCATION MAP
SOLIDS
ND#TIONI
BUILDIN
CLARIFIERS
(SOUTI 'QUAD)
•
PUMP AND BLOWER..
BUILDING
POD
IMH 1P1* PLACE
AN-
sb,2,04,
—�
I
It 4 I
•
PRIMARY
S s D!MENTATi f N
TANKS
HEADWORKS
PROJECT AREA
Page 4 of 6
ATTACHMENT 2
HEADWORKS SCREENING UPGRADE
DISTRICT PROJECT 7327
SUMMARY OF BIDS
PROJECT NO.: 7327 DATE: OCTOBER 19, 2016/2PM
PROJECT NAME: HEADWORKS SCREENING UPGRADE
PROJECT LOCATION: 5019 IMHOFF PLACE, MARTINEZ, CALIFORNIA
NO. OF ADDENDA: 2 ENGINEER ESTIMATE: $6,500,900
NO.
1
2
4
5
6
7
8
BIDDER BID PRICE
BIDS OPENED BY/s/. DATE October 19, 2016
Page 5 of 6