Craig Mizutani, Senior Engineer
PUBLIC CONTRACT CODE AMENDMENT
• In 2011, the Governor signed SB 293 modifying Public Contract Code
Section 7201 to set the maximum retention on a construction contract at
5%.
• This requirement began January 1, 2012, and sunsets January 1, 2018.
• The intent of the bill is to provide some financial relief to contractors and
subcontractors during these challenging economic times by reducing
retention from 10%to 5%.
• The retention amount may be increased for a specific project with a finding
by the elected Board of Directors that the project is substantially complex
to justify the increased retention.
• The finding must be made at a properly noticed and scheduled public
hearing. The finding must be explained in the bid documents.
1
o9/z3/16
BACKGROUND
• On September 15, 2016, the Board established
October 6, 2016, as the date for a Public Hearing
to receive comments on increasing the
construction contract retention amount to 10% for
the Headworks Screening Upgrades, DP 7327.
• Notice of the Hearing was advertised in the East
Bay Times on September 26, 2016
'A t
PROJECT OVERVIEW
• The Headworks Screening Upgrades is a substantially
complex project with important operational constraints.
• Summary of proposed renovations:
• Replace mechanically cleaned bar screens in channels 1 through 4
• Refurbish existing bar screens and install in wet weather channels
• Install screenings sluiceway for screenings conveyance
• Install screenings washer/compactors
Install screenings tipping troughs
Construct screenings handling facility
• Construct access platforms,stairways,and guardrail
• Replace and install new process piping
• improve ventilation and odor control capture
Complex construction sequencing due to continuous operation of
online critical facility and wet weather constraints
40
2
s.
-mom:
w quo
. _-._-
t
i
b t�Al h
1 �
J
09/23/16
3D MODEL: TiPPING
_ a e
CONSTRUCTION SAND
CONSTRAINTS
• The existing Headworks facility will operate continuously during the project
with the majority of construction activities limited to the dry weather season
• Construction in the Headworks is of retrofit type with critical and complex
elements, including:
Nearer equipment technology-tipping troughs
New process equipment and refurbishment of existing equipment
Multiple pieces of process equipment with central control and integration
Isolation and bulk heading of raw sewage flow
p Confined space entries
Class I Division 1 hazardous areas per NFPA 820
• To be successful,the contractor will be required to:
Understand the project complexities,sequence,and operationai constraints
Produce an accurate and realistic construction schedule using the critical path method
Execute the schedule and coordinate construction activities as conditions change
Coordinate with equipment manufacturer during submittals,procurement,and startup
Actively lead the process startup and responsively troubleshoot system
5
09/23/16
STAFF RECOMMENDATION
• Find that, in accordance with Public Contract
Code Section 7201 , the Headworks Screening
Upgrades, District Project 7327, is substantially
complex to justify increasing retention and adopt a
resolution increasing the construction contract
retention amount from 5% to 10%.
QUESTIONS
6