HomeMy WebLinkAbout03. Projects Completed/Closed in FY 2015-16Projects Completed/Closed
in FY 2015-16
September 6, 2016
Engineering and Operations
Committee Meeting
Edgar J. Lopez, PE
Capital Projects Division Manager
Central Contra Costa Sanitary District
Protecting Publk Health and the Environment
FY 2015-16 Closed Projects
by CIB Program
Program
Treatment Plant
Collection System
General Improvements
Recycled Water
Total
Total Expenditures
$2,438,147
$16,352,370
$8,621,570
$4,245,658
$31,657,745
3.
1
Treatment Plant Program
Closed Projects
Project
Number
7310
7316
7284
7318
Project Title
Piping Renovations,
Phase 8
Sludge Blending Tank
Repair
TP Hazard ID/
Remediation
Outfall Monitoring Project
Total
Expenditures
$1,569,407
$706,328
$119,378
$43,034
Piping Renovations, Phase 8
Proiect Purpose:
• Replace and repair failed piping and related
equipment at the treatment plant.
Scope of Work:
• Demolition of abandoned fire protections
equipment
• A/N tank spray piping replacement
• Valve replacement on ReW system and Filter
Plant systems
• Sodium Hypochlorite system piping and valves
• Boiler blowdown piping replacement
• Miscellaneous treatment plant equipment
2
Financial Summary
Construction Contracts
(W.M. Lyles)
Change Orders (9.6%)
Total Construction Contract
Design
CM, Inspection, Support
Total Expenditures
Total Budget at Award
$935,000
$89.309
$1,024,309 (100%)
$255,000 (25%)
$290.098 (28%)
$1,569,407
$1.570.000
New A/N Tanks Spray
Piping
New Secondary Scum
Pumps
3
•
New Valves at Filter Plant
New Sodium Hypochlorite
Piping
Collection System Program
Closed Projects < $1 million
Project
Number
5962
5993
8406
8425
8427
Project Title
Manhole Remote Level Monitoring
Force Main Assessment
Pump Station Safety Improvements
Cathodic Protection System Phase 1
PS Arc Flash Study
Total
Expenditures
$131,963
$96,535
$610,777
$519,029
$95,516
4
Collection System Program
Closed Projects > $1 million
Project Project Title
Number
8404 Lafayette Sewer Renovations, Ph. 8
8421 Lafayette Sewer Renovations, Ph. 9
8411 N. Orinda Sewer Renovations, Ph. 5
8413
Walnut Creek Sewer Renovation,
Ph. 10
8424 M1 CIPP Project
Total
Expenditures
$2,951,730
$3,063,582
$2,771,989
$3,791,443
$2,319,806
Lafayette Renovations, Phase 8
Proiect Purpose:
Replace/Renovate deteriorating and
high maintenance sewer lines
Scope of Work:
Reconstruct approximately 8,670 linear
feet of 6 -inch sewers in Lafayette
5
Financial Summary
Construction Contract
(Carone & Company, Inc.)
Change Orders
Total Construction
Design
Construction Management
Total Project Expenditures
Total Budget at Award
Variance
* Included claim settlement and legal cost
IDPA.a.�
N
Feet
ro=se e'.o, ear„ Rc
:cwv.<aw.a CostaI
Lafayette
Reservoir
Lafayette Sewer Renovation Phase 8
District Project 8604
Project locations
$1,321,305
$ 547.332*
$1,868,637 (100%)
$596,000 (32%)
$487.093*(26%)
$2,951,730
$2.304.000
($647,730)
Lafayette
Renovations,
Phase 8
Location Map
6
Lateral Connection
HDD in easements
Final Paving
Easement work
on driveway
7
Lafayette Renovations, Phase 9
Proiect Purpose:
Replace/Renovate deteriorating and
high maintenance sewer lines
Scope of Work:
Reconstruct approximately 8,500
linear feet of 6- to 15 -inch sewers in
Lafayette.
Financial Summary
Construction Contract
(Precision Engineering, Inc.)
Chance Orders (11.9%1
Total Construction
Design
Construction Management
Total Project Expenditures
Total Budget at Award
Variance
$1,812,211
$216.479
$2,028,690 (100%)
$650,000 (32%)
$384,892 (19%)
$3,063,582
$3.154.200
$90,618
8
ATTACHMENT
LAFAYETTE SEWER RENOVATION PHASE9
DISTRICT PROJECT 8421
LOCATION MAP
N�R
Lafayette
Renovations,
Phase 9
Location Map
Casing Carrier Pipe Under
EBMUD Aqueduct
New Manhole Installation
tiO
9
CIPP Lining of Trunk
Sewer
Existing Sewer
Abandonment
North Orinda Renovations, Phase 5
Proiect Purpose:
Replace/Renovate deteriorating and
high maintenance sewer lines
Scope of Work:
Reconstruct approximately 7,700
linear feet of 6-, 8-, and 12 -inch
sewers in Orinda.
10
Financial Summary
Construction Contract
(Bay Pacific Pipelines, Inc.)
Chanae Orders (-2.3%)
Total Construction
Design
Construction Manaaement
Total Project Expenditures
Total Budaet at Award
Variance
to Pro,ecl Areas I
North Onr.d. 5~ R..ov.eo. P . $
Dstnct Prost 8.1 t
$ 1,748,505
($40.500)
$1,708,005 (100%)
$565,000 (33%)
$498.984 (29%)
$2,771,989
$3.020.000
$248,011
North Orinda
Renovations,
Phase 5
Location Map
11
Open cut in easement
Pipe bursting in easement
Trench paving
Open cut
12
Walnut Creek Renovations, Phase 10
Proiect Purpose:
Replace/Renovate deteriorating and
high maintenance sewer lines
Scope of Work:
Reconstruct approximately 8,500
linear feet of 6- and 8 -inch sewers in
Walnut Creek
Financial Summary
Construction Contract $2,288,000
(KJ Woods, Inc.)
Change Orders (vs Contract)
•Project related (1.5%) $37,597
•Added work (7.3%1 $184.397
Total Construction $2,509,994 (100%)
Design $783,000 (31%)
Construction Manaaement $498.449 (19%)
Total Project Expenditures $3,791,443
Total Budaet at Award $3.884.000
Variance $92,557
13
rti
•••-. -
C5N
'1 •
\ion'
w •
IED Prop.: A r *Ai
‘•7,
ACKI1Palt
1
alrah..„Ceni.....8...1 Walnut Creek S4weer R•nevabons Plias* 10
paint ProAet 8413
IL) Project Location
Walnut Creek
Renovations, Phase 10
Location Map
Pavement Restoration
on North Main St.
North Main St.
Night Work
14
Concrete Driveway
Restoration
Pipe Bursting
Easement Site
M1 CIPP Rehabilitation
Proiect Purpose:
Renovate/Rehabilitate Targe -diameter
sewer lines that have high level of
corrosion damage.
Scope of Work:
Renovate/rehabilitate approximately
3,100 linear feet of 42 -inch diameter
deteriorated sewer within the treatment
plant parcel by cured -in-place lining.
15
Financial Summary
Construction Contract
(SAK Construction, LLC.)
Chanae Orders (0%)
Total Construction
Design
Construction Manaaement
Total Project Expenditures
Total Budget at Award
Variance
ATTACHMENT 1
M1 CIPP REHABILITATION PROJECT
DISTRICT PROJECT NO. 8424
LOCATION MAP
`
CONTRACTOR
,' MONO AREA
/1
$1,996,210
$0
$1,996,210 (100%)
$160,000 (8%)
$163.596 (8%)
$2,319,806
$2.776.000
$456,194
M1 CIPP Project
Location Map
16
Bypass setup
On-site liner wet -out
17
On-site liner wet -out
Influent Structure Access
18
Manhole rehabilitation
General Improvements Program
Closed Projects
Project Project Title Total
Number Expenditures
8195 Info Tech Development $6,637,533
8232 GDI/SMMS Replacement $973,218
8246 Sun Edison Pwr $97,729
8515 2014-15 Equipment and
Vehicles $913,090
19
Recycled Water Program
Closed Projects
Project
Number
7279
7299
Project Title
Concord Naval Weapons
ReW
Concord Landscape
Project
Total
Expenditures
$266,338
$3,979,320
Concord Landscape Project
Proiect Purpose:
Extend recycled water distribution pipelines into the
Diamond Blvd area in the City of Concord.
Scope of Work:
• Installed approximately 12,000 LF of recycled water
distribution pipeline.
• Installed one recycled water hydrant.
• Extended 36 service laterals for future landscape
irrigation conversion to recycled water.
• Connected new users.
20
Financial Summary
Construction Contract (ReW main)
(Platinum Pipeline, Inc.)
Change Orders (3%)
Customer Connections
Total Construction
Design
CM/Grant Admin/Customer Outreach
Total Project Expenditures
Total Budaet at Award
Variance
Received -$1,000,000 Grant reimbursement
$2,150,351
$59,621
$125.251
$2,335,223 (100%)
$662,000 (28%)
$982.097 .(42%)
$3,979,320*
$4.415.000
$435,680
Concord Landscape
Project
Location Map
21
Pipeline Installation
Questions?
22