HomeMy WebLinkAboutBUDGET AND FINANCE AGENDA 11-28-05 Central Contra Costa Sanitary District
5019 Imhoff Place,Martinez,CA 94553-4392 (925)228-9500 www.centralsan-org
BUDGET AND FINANCE COMMITTEE
Chair Lucey
Member Rockett
Monday November 28, 2005
3:30 p.m.
CSO Conference Room
1250 Springbrook Road
Walnut Creek, California
1. CALL MEETING TO ORDER
2. PUBLIC COMMENTS
3. OLD BUSINESS
4. CLAIMS MANAGEMENT
5. REPORTS/ANNOUNCEMENTS
6. REVIEW EXPENDITURES
7, ADJOURNMENT
Recycled Paper
Central Contra Costa Sanitary District
November 18, 2005
TO: BOARD BUDGET AND FINANCE COMMITTEE
FROM: RANDALL MUSGRAVES
DEBBIE RATCLIFF
SUBJECT: November 1, 2005 Finance Committee Meeting
There were several outstanding questions from the last Board Budget and Finance
Committee meeting which required additional staff research. The questions and
answers are provided below:
1. What tests does the District lab not do in-house and what have we spent over
the last year on these outside tests?
The District Laboratory performs almost 50,000 analyses per year. Approximately 200
tests per year, or less than one percent of the total work load, are sent to specialty labs
that are either set up to routinely perform the test or have specialized in performing
those particular analyses. The tests performed by outside labs are:
Phenols*
Pesticides
Hazardous Waste Criteria
Dioxins
Low Level PAH
Methyl Mercury
Aquatic Toxicity
Specialized Microbiology
*Less than 20 Phenol tests have been performed this year.
Most of these tests are required to be performed only quarterly, semiannually. Others
such as Pesticides, Dioxins and Methyl Mercury require specialized equipment that we
do not have in addition to being performed infrequently. Still others such as Aquatic
Toxicity and Specialized Microbiology require specialized facilities with staff that are
experts in these fields.
In sum, the laboratory out sources these tests based on cost effectiveness and existing
capabilities. Lab testing is regulated by the State, which certifies labs for the tests they
report. This creates overhead requirements related to minimum standards of quality
assurance. This requirement is the same regardless of how many samples are run. We
have to pay for the certification for the particular field of testing, prove our capability by
running unknown performance evaluation samples, and run regular quality assurance
samples and standards. If the sample load for a particular test is infrequent, it normally
is not economic to incur these overhead expenses unless there is a specific benefit to
the District, such as with EPA method 1631 mercury. The 1631 mercury test benefits
the district because we perform more test than required by our permit because we
investigating how we will be able to reduce the mercury in our effluent to meet the
upcoming requirement from the Regional Water Quality Control Board. The decision to
outsource samples is carefully reviewed and monitored.
Staff is evaluating the cost effectiveness of purchasing specialized equipment so the
District could perform pesticides and low level PAH as part of the equipment budget this
FY 2006-07.
2. Page 21, 158315, San Francisco Estuary Project
The Regional Water Quality Control Board (RWQCB) imposed the $165,000 fine on our
District for 28 overflow incidents that occurred between January 2000 and December
2004. The payment you questioned to the San Francisco Estuary Project is a
component of the total $165,000 fine. Below are the four payments that make-up this
amount:
07/19/05 Regional Water Quality Control Board (RWQCB) $10,000
10/14/05 City of San Ramon $80,000
10/14/05 Contra Costa Resource Conservation District $65,700
10/26/05 San Francisco Estuary Project (SFEP) 9 300
Total $165,000
The $10,000 to RWQCB is to reimburse them for their staff costs. The $80,000 and
$65,700 payments are being used to fund local improvement projects. The state
mandated a watchdog for the supplementary environmental projects and as a result, the
RWQCB contracted with SFEP to oversee completion of the environmental projects.
The $9,300 reimburses SFEP for their staff costs.
Legal Expenditure Summary
SELF INSURANCE FUND
Check# Check$ Vendor Name Account# Account$ CL M Case#-Case Title
11 102276 $478.56 Restoration Management Co. 003-0000-991.14-22 1 $478.561 11 Anderson (Dan)-Backup- Restoration Services
CL#-Claim Log Number
GL-General Liability Claims
AC-Auto Claims
2005-06
OVERFLOWS AND PLUMBING REIMBURSEMENT CLAIMS
# DOL Address city Cia� Type Reserve Paid to Date Pald to Claim Totals Comments
1 0712'9!05 80 Rheem Boulevard Orinda Anthorry Miramonte PL $007.54 Restoration Management Co $807.64 O1F Into front yarn and basement. Cleanup only. No personal or reef property damage Waded.
2 08/01/05 124 Morage Way Orinda Mrs.Heath PL $450.92 Restoration Management Co $450.92 OIF through cleanout. Yard deanup only. No real or personal property damage is expected.
3 08/08105 3322 Freeman Road Walnut Creek Gail Ford PD $133.75 Gail Ford $133.75 O1F from manhole&into homeowners backyard. Cleanup only-no real or personal property damage.
$395.20 Restoration Management Co $395.20
4 09/20105 5716 Elkins Court Martinez Nathan RU330 PL $70.00 Nathan Russo Overflowed out of OPD. cleanup costs only.
$887.19 Restoration Management Co $957.19
5 09/23/05 7 Don Gabriel Way Ortndaa Larry&Caratyn Woodcox PD 54000.00 DIF #OPD;,under deal 0swW amft std wm oohs far
ddfn&"to-tom dOCk
$1,700.35 Restorstfan-Management Co
6 09/27/05 224 Castle Glen Road Walnut Creek Tim Rigney PL $95.00 Tim Rlgney $95.00 Plumbing bill reimbursement
7 09/29/05 3322 Freeman Road Walnut Creek Gail Ford PD $318.73 Restoration Management Co To be reimbursed by Rota Rooter
8 10/01/05 2475 Pleasant Hill Rd Pleasant Hill Margaret Kersting PL $138.35 Margaret Kersting O1F from OPD in back yard. Cleanup outside costs only.
$432.25 Restoration Management Cc $570.61
9 10/13/0.5 5 Arbolado Court Grinds Gino a Janyce Paolettl PL 5847.59 Restoration Management Co
10 10/17/05 1088 Via Alta Lafayette Mary McCombs PL $139.75 Mary McCombs Plumbing bill reimbursement
11 10/19105 346 Cameo Drive Danville Allen Anderson PL $139.75 Roto-Rooter Exterior cleanup only-Overflow out of backflow prevention device. No property damage
12 $478.56 Restoration Management Co. $618.31
13 11/04/05 40 Jmm Cl Wabut Creek Mann Kady PL $1.01W.0D Rester°ManaHMment Cc
14 $140.00 Maryam Kady EnWm rig.rafenw,aervtln?ftd-to-a Md re ►tee bm
15 101 Glen Court Walmlt Creak ErIaBessg PD Eric Bes" -k0m-CPb trr.Mdw ywd, #a smiP aim damageftnW roar
16 11/12105 2 Ivy Drive Or arca Perry 8hust& PL 5140.00 Photo-Rooter
17 $1 000.00 Restoration Management Co
18
19
20
21
22
23
24
25
26
27
28
29
30
Res Paid Total
Total-Overflows $4,280.00 $7,035.05 $11,315.05
2005-06
2004-05 AUTO CLAIMS
0 D_O_L Location a sc Name Rossrve Paid Comments
1 08/20/05 Lane Tree Way,Ant stat Veh#232 D.Marched) $4,049.07 Struck a cement pillar while backing in a parking lot. Emp was driving back home from a plug call an the weekend.
2
3
Reserve Paid-to-date
Total-Auto Claims $0.00 $0.00 $4,049.07