HomeMy WebLinkAbout04.c. Board Policy No. BP XX - Energy ManagementCentral Contra Costa Sanitary District
BOARD OF DIRECTORS
POSITION PAPER
Board Meeting Date: August 4, 2016
Subject:
4.c.
b5411
ADOPT NEW BOARD POLICY (BP) NO. OXX — ENERGY MANAGEMENT
Submitted By:
Jean -Marc Petit, Director of Engineering
& Technical Services
Initiating Dept./Div.:
Engineering & Technical Services /
Planning & Development Services
REVIEWED AND RECOMMENDED FOR BOARD ACTION:
Kent Alm Roger S. Bailey
Counsel for the District General Manager
ISSUE: Adoption of new Board Policies (BP) requires the review and approval of the
Board of Directors.
BACKGROUND: Energy is one of the highest operating costs for a water sector utility,
and fossil fuels are the basis of most energy sources, including purchased electricity.
There has been a recent surge in interest in the clean water sector to strive towards
energy independence by minimizing energy demands, improving energy efficiency,
maximizing recovery of the energy embedded in the wastewater solids, installing
renewable energy generation systems (e.g. solar and wind), and minimizing or
eliminating imported electricity and non-renewable fuels.
The District's wastewater treatment plant currently meets the majority of its energy
demand by generating power and heat from its natural gas cogeneration unit. The
power from cogeneration is used to meet the majority of the District's electrical
demands. Heat produced from the cogeneration unit, and waste heat from the multiple
hearth furnaces, is sent to boilers that convert the heat to steam energy. This steam, in
addition to steam produced from the District's auxiliary boilers, is primarily used to drive
the aeration turbines, which provide air to the District's biological treatment process.
This provides a significant reduction in the amount of imported energy which would
otherwise be required to operate the aeration turbines. The remainder of the District's
electrical demand is met with imported grid electricity from PG&E.
The District's current energy approach at the treatment plant campus has been cost
effective; however, it requires relying on imported grid power and imported natural gas.
While the cost of using the natural gas cogeneration unit is less than imported grid
power, the natural gas accounts for a significant portion of the District's anthropogenic
greenhouse gas (GHG) emissions.
The energy demand for the treatment plant will significantly increase as additional
treatment processes (e.g. nutrient removal, membrane bioreactors, filtration, reverse
osmosis, and ultraviolet disinfection) are implemented in the future to meet potential
Page 1 of 2
POSITION PAPER
Board tweeting Date: August 4, 2016
Subject: ADOPT NEW BOARD POLICY (BP) NO. OXX ENERGY MANAGEMENT
new effluent discharge permit requirements and/or increase recycled water production.
As part of the District's Comprehensive Wastewater Master Plan, staff is exploring
opportunities to achieve net zero energy.
On June 16, 2016, staff presented current and future projected energy profiles for the
District's wastewater treatment plant to the Board of Directors. As part of the June 2016
Board workshop, staff also presented a suggested definition for net zero energy and
multiple opportunities (e.g. co -digestion of high strength wastes, solar, and wind) for the
District to explore to strive towards a potential net zero energy goal for the treatment
plant campus. Board Members present at the workshop provided input to staff for an
energy policy and requested that staff develop a draft energy policy.
The District also owns and operates the Collection System Operations building in
Walnut Creek, and other facilities located throughout the service area such as remote
pumping stations. The purpose of this energy management policy is to promote cost-
effective projects to minimize imported grid power and fossil fuels by implementing
energy efficiency and renewable energy generation projects that will also reduce the
District's anthropogenic (GHG) emissions.
The proposed energy management policy is intended to provide the District with a
direction for future consideration of energy efficiency, demand reduction, and renewable
energy projects that is consistent with the District's Vision, Mission, and Values outlined
in the District's Fiscal Year 2016-2018 Strategic Plan.
ALTERNATIVES/CONSIDERATIONS: The Board of Directors may choose not to
adopt an energy management policy.
FINANCIAL IMPACTS: None by this action.
COMMITTEE RECOMMENDATION: This matter was discussed by the Administration
Committee on July 14, 2016. The Administration Committee recommended Board
approval of the attached new BP No. XX — Energy.
RECOMMENDED BOARD ACTION: Adopt new BP No. OXX — Energy Management.
Attached Su000rtina Document:
1. Final proposed BP No. OXX — Energy Management
Page 2 of 2
Number: BP OXX
Authority: Board of Directors
Effective: August 4, 2016
Revised:
Reviewed:
Initiating Dept./Div.: Engineering & Technical Services
Department
BOARD POLICY
ATTACHMENT 1
Central Contra Costa
Sanitary District
www.centralsan.org
DISTRICT ENERGY MANAGEMENT
PURPOSE
V77
The District desires to strive towards net zero energy at its wastewater treatment plant
campus in Martinez. The District also owns and operates the Collection System
Operations building in Walnut Creek, and other facilities located throughout the service
area such as remote pumping stations. The purpose of this Policy is to promote cost-
effective projects to minimize imported grid power and fossil fuels by implementing
energy efficiency and renewable energy generation projects that will also reduce the
District's anthropogenic greenhouse gas (GHG) emissions.
POLICY
I. Net Zero Energy for the District's wastewater treatment plant campus is defined
as: "A wastewater treatment plant campus that uses or produces enough
renewable energy to meet its own annual energy consumption requirements."
II. Develop a cost-effective energy program for the District's wastewater treatment
plant that strives towards Net Zero Energy. Cost-effective projects are defined as
projects that meet the following minimum requirements:
a. Projects requiring capital investment must have a simple payback period
of not more than 15 years.
b. Projects that do not require capital investment (e.g. power purchase
agreements (PPAs)), energy service agreements, and energy savings
performance contracts) must offer a net present value of savings when
compared to the cost of using the District's existing energy sources AND
positive cash flow within 3 years.
III. The District's energy management approach will consider cost-effective projects
that achieve the following:
a. Increase the use of renewable energy, such as solar and/or wind power.
[Original Retained by the Secretary of the District]
Number: BP OXX
DISTRICT ENERGY MANAGEMENT POLICY
Page 2 of 2
b. Identify and implement energy efficiency improvement projects.
c. Incorporate the use of energy efficient equipment and processes in District
capital improvement projects whenever feasible.
d. Pursue opportunities that recover renewable energy in wastewater,
wastewater solids, and biogas.
e. Capture and convert waste heat from treatment processes to a beneficial
energy source.
g.
Evaluate opportunities to import high strength wastes to increase on-site
renewable energy generation.
Explore innovative energy optimization opportunities, energy recovery
processes, and other innovative energy technologies.
h. Reduce greenhouse gas emissions.
IV. Actively manage anthropogenic greenhouse gas emissions below the California
Air Resources Board (CARB) Cap and Trade Threshold (if it is the most cost-
effective manner).
V. Encourage collaboration with other agencies, utilities, and organizations to
explore and develop energy projects.
VI. Consider use of alternative methods of implementing energy projects such as
third -party financing (e.g. PPAs).
VII. Use federal, state, regional, investor-owned utility (PG&E), and other public
funding opportunities (e.g. grants, loans, and rebates) whenever feasible.