HomeMy WebLinkAbout12.b. CWMP Workshop-Collection System Master Plan Update 12 . b . COMPREHENSIVE WASTEWATER MASTER PLAN UPDATE Board Workshop Part B Collection System Master Plan Update June 16, 2016 PART B COLLECTION SYSTEM MASTER PLAN UPDATE 1 06/10/16 WORKSHOP OUTLINE �. i reatmem Mani (i N) Master Mian 5-Laws ow—taie, • "?5[el Pldfl [)rIV2f'S & CSO: • Tre:aVr-,&nt Plant c)j the FL!,Lire • Key Findings and Preh,n�n� • Preliminary Updated CIP C•r_4_ B. Brief Status Update on Collection System Master Plan • Collection System Model Update • Introduction to Sewer Replacement Program using InfoMaster • Next Steps a s w COLLECTION SYSTEM MASTER PLAN MAJOR ELEMENTS • InfoWorks° Model using Flow Monitoring Data • Collection System Design Criteria & Capacity Evaluation • lnfoMaster° Pipeline Degradation/Replacement Risk Model • Pump Station Condition Assessments • Asset Management Program Recommendations I 1 06/10/16 DYNAMIC MODEL IS A CRITICAL DISTRICT TOOL ■ ArcSNAP -> InfoWorks ICM 1n1 Wbd&1CM ■ Parcel Consumption Data ■ General Plan / Development Info ■ Topographic & Survey Data ■ Model used to: y Identify Capacity Deficiencies Pipe Sizing for Capital Projects New Development Capacity Evaluations y Source Control—Special Discharges 2014/2015 FLOW MONITORING ,Y n a s 36 meters,5 rain gauges, 9 weeks 48 miles tributary piping/meter • Installed February 4-6, 2015 • Gained valuable dry weather flow • Data for base wastewater flow rates • Identified some areas of high 1/1 • Improved planning for future metering • Limited data for wet weather model calibration Lack of saturated soil conditions .r }V 3 06/10/16 2015/2016 FLOW MONITORING 0) • 70 meters, 5 rain gauges _— -' • 18 miles tributary piping/meter ~' '• Increase coverage with more meters 1a Capture storm with saturated soils Capture larger storm event, if possible - "' ' • Refine 1/1 high response areas -: Improve model confidence &accuracy Y Confirm Peak Flows to Treatment Plant v Evaluate Design Criteria ' ➢ Identify/Confirm Capacity Deficiencies y Day-to-Day Model Use Additional Features(Pump-Arounds, Emergency Flow Routing,etc.) 2015/2016 FLOW MONITORING 4 06/10/16 MARCH 4 - MARCH 11 RAINFALL 2-YEAR, 24-HOUR EVENT STORM (UP TO 5.2 Fuld Dila Ciiitbin f §alai 9 4A i •GLV 'I I im kI WOV L�W.90 Sm-.m lOmW 3'1 COW ]a W:W Y1WW Yle W.01 Y11 a1M _.�.. .. MASTER PLAN WILL UPDATE THE PREVIOUS COLLECTION SYSTEM CAPACITY RECOMMENDED PROJECTS Pleasant Mill- PteasantMilV6Myson�Mek Note:Master Plan will be (inplDgtess) updated and projects r= verified after dynamic hydraulic model completed f.atayane- ` c Pleasant Mlll Roatl �' r �7. (Completed in FY 2A71/12) C— ®J-o e 2 a u•G . Walnut CMek- aa-c Walnut Bova - l r— rao�r o+way t~'= oa� ..Legend - - — -- San Rankan- .n - C:apeclly nehclency G`oup Pircan[Full Pip.Capacity San P:atnOn SChidule C \w O , (M,G D.v.lapm.nF,a-year.ennt) No 91op® El— NM � 5 06/10/16 CURRENT APPROACH FOR CAPACITY DESIGN CRITERIA BASED ON 2010 CSMP • Return period criteria • 5-year event triggers deficient sewers & relief project in CIP • 20-year event used for design of replacement pipe • Historical event • Based on peak flow return period (PICS/MOST results) • Capacity deficiency criteria • Deficiency if q/Q > 100% (highest priority if >130%) • Design —d/D per District Design Standards • Master Plan Team evaluating all existing criteria for Design Standard recommendations COLLECTION SYSTEM INSTALLATION PROFILE BY PIPE MATERIAL 400 1� 3lO 150 nu 150 fro 50 1910.1919 19:V•2959 1.1999 19W 1949 79541459 11.1. 197619]9 1940.1989 1490-i999 70003009 201 fl— 6 06/10/16 COLLECTION SYSTEM REPLACEMENT PROFILE OF GRAVITY SYSTEM IN MILES 70 . Okulaled Npo Rap"—(WqO )Laxd o --4 dere aM a—ed wrvieo We G0 —AnRIJI Dip.,Replxemml{milaa) So 40 )11 Ye INFOMASTER® ALLOWS INTEGRATED PLANNING FOR PIPELINE REPLACEMENT 1. Utility GIS 2. CMMS • Pipes Cleaning frequency/method File geodatabase E 3. CCTV /InfoMastero\ • District Scoring 5. Engineering #Arc Method ESRI • Scores • Budget&cost data GIs • Failure scores 4. GIS • Reliability method • Waterways • Risk matrix settings • Schools,Hospitals • Rehab logic layout • Major Roadways 7 06/10/16 INFOMASTERO RISK ANALYSIS Multiple Consequence Likelihood Calculation q of Failure options of Failure CCN -acma cap arty Hydraulic Model Data Results Pipe Aye i—— - Rosasu.scna= GIS Data pipe •, SOWL:.Rs�s. material Calculation , w GIs Data Cleaning apo owwa Data of Risk �- Other ami n xg 19yR11 Risk Class Example Capital Action _._.__.. Lar-Lee �i�� wF.yMw,ler'-rrr w.xy, fjEpp,t3Gmb 1B s'val ZJ irl [­NgM1 Iz ae.'ess ea.t1p"�01 loiaan m� High Standard Prionty in LIP/Biannual Operational r-...c .ea x�xee Frequency 9pp.0.3�1e Iger,0.12x1-alrr..aao,tr. Medium tow Priority in CIP/1 in S'kars Operational s woman mre waae alx 1;,o.nniaer 'Frequency (. a-Yeew Ls 13pw assts. vcoasn ea� , Low i in 20 Years Operational Frequency cm.»aLee Negl4eible Wait for a problem to arix EXAMPLE OF INFOMASTERO DEGRADATION MODELS Survival Probability t DI t AC t Steel 120- 110- 1004 20110100 SO *� 80 Go- 20 50 40- 30- 20- I I D3020D 6 1D 15 211 25 30 35 40 45 50 55 60 65 70 75 80 55 90 95 100105110115120125 Age 1 8 06/10/16 EXAMPLE OF INFOMASTERO RISK MAPS �4 d� l� _ 4- ler,��- EXAMPLE OF INFOMASTERO RISK CHARTS - — -- - ox :?x;0. hAQ* Q D hft Caueby/p,P= M 9-r b/UWAW.Rs2083_M 00*MCein W 96.6Y.N.MUPe b,I Average Risk by Diameter ■Aruye 9b.t a,0 126 140 30. 35C 3,q aa- We- 290 dqWe7811 a 2� 7w 770 11D 16q 150 tw l2D tqq 60 w .c 7 1 5 6 8 10 12 14 16 t6 16 M 2< 22 2+ k 33 36 a 12 s5 DI8111M+ 9 06/10/16 EXAMPLE OF INFOMASTER® PIPELINE REPLACEMENT PROGRAM SCENARIOS Baseline Regg valent Lost - .w. mi6i earW Gay!.5.�.+>rry Rpw 0.b1RF,o-t C�d P.Nar.r Aryan __ [j SMxeestircRKae[emml USYtW M1 tnflgrn Baseline Replacement Cost wuam MASTER PLAN & STAFF COMPLETED CONDITION ASSESSMENT OF DISTRICT'S PUMP STATIONS 10 06/10/16 ASSET MANAGEMENT PROGRAM RECOMMENDATIONS WILL BE DEVELOPED • Large Diameter Pipeline Assessments • Forcemain Assessments • Long-Term Flow Monitoring THE CWMP IS ON TRACK TO FINISH IN FY2016/2017 Board Board Board Present Meeting Workshop Workshop CIB/CIP 1 1 1 t tt ttt NTP Draft Final Prop Final Adopt 20-Year CIP 20-Year CIP 218 CWMP CIB/CIP Notice Report Develop Revenue Requirements Adopt Rates 11 06/10/16 NEXT STEPS • Complete Model Calibration • Evaluate Design Criteria & Capacity Deficiencies • Complete InfoMaster Model & Pipe Replacement Program Recommendations • Package Projects, Draft CIP, Develop Rate Scenarios • Collection System Master Plan Board Updates • Present Draft CIP & Rates November 2016 • Draft Master Plan Report December 2016 • Final Draft Master Plan Report April 2017 I' QUESTIONS? 12