Comprehensive Wastewater Master Plan
Wastewater Treatment Plant Master Plan Update
Board Workshop - MPR
June 16, 2016 8:00 am to 2:00 pm
Agenda
Topic
I. Introduction
II. Treatment Plant of the Future
A. Review of Goals and levels of Service
B. NACWA/WEF/WERF Plant of the Future
C. Summary of Proposed Improvements
1. Liquid Treatment- Recycled Water
a) R&R
b) Capacity
c) Regulatory
d) Energy/Sustainability
2 Solids Handling
a) R&R
b) Capacity
c) Regulatory
d) Energy/Sustainability
3. Energy Neutrality
D. Review Current 10 -Year and 20 -Year CIP
E. Prelim. Update to 10 -Year and 20 -Year CIP
DRAFT
5
Lead Time
GM - Roger
Bailey
Moderator — 8:00-8:05
Larry Bienati
CCCSD - JMP 8:05-9:00
Page 1 of 6
l
1
III. Wastewater Treatment Plant Master Plan Update
A. Repair & Rehabilitation/Resiliency &
Vulnerability Drivers
1. Condition Assessment Overview
a) Existing Plant
b) Soil Cap/Hazardous Material Pile
2. Prioritization of Improvements
3. Preliminary CWMP versus Current CIP
a) Immediate: 0-5 Years
b) Near -Term: 5-10 Years
c) Long -Term: 10-20 Years
d) Future: Beyond 20 Years
Break
Wastewater Treatment Plant Master Plan Update (Cont'd)
B. Capacity Drivers
DRAFT
9:00-9:45
CH2M/CCCSD
9:45-10:00
10:00-12:00
Carollo/CH2M
/CCCSD
1. Flows and Loads Projections
2. Liquid Stream Capacity Evaluation
3. Wet Weather Flow Management
Alternatives
a) Existing Facilities
b) Capital Improvements
c) Private Sewer Lateral Discussion CCCSD 30 min.
C. Liquid Stream Processes Preliminary Findings Carollo/CCCSD
1. Regulatory Drivers — Liquid Stream
a) BACWA Update/Nutrient Study
b) Nitrification -Denitrification
c) Other Future Regulatory
Landscape (CECs, Microplastics,
Microbeads, etc.)
Page 2 of 6
2. Recycled Water Drivers
a) Current & Projected Demands from
Existing Facilities
b) Recycled Water Wholesale
Opportunities Study (Potential
Customers, Demands, Water Qualities)
3. Nutrient Removal & Recycled Water
Alternatives
a) Universe of Alternatives
b) Alternative L1
c) Alternative L2
d) Alternative L3
4. Master Planning for Potential Long -Term
Regulations — Liquid Processes
5. Preliminary CWMP versus Current CIP
a) Immediate: 0-5 Years
b) Near -Term: 5-10 Years
c) Long -Term: 10-20 Years
d) Future: Beyond 20 Years
D. Solids Process Preliminary Findings
1. Regulatory Drivers—Solids Stream
a) SSI MHF versus FBI
b) 503 Regulations for Biosolids
c) Existing MHF Limitations
DRAFT
CH2M/CCCSD
Page 3of6
2. Near -Term Projects associated with
Solids Conditioning Building
3. Solids Handling Alternatives for Plant of
the Future
a) Universe of Alternatives
b) Alternative S1
c) Alternative S2
d) Alternative S3
e) Alternative S4
4. Preliminary CWMP versus Current CIP
a) Immediate: 0-5 Years
b) Near -Term: 5-10 Years
c) Long -Term: 10-20 Years
d) Future: Beyond 20 Years
E. Energy & Sustainability
1. Current Energy Profile
2. Energy Profile of Alternatives
3. Current GHG Emissions & Operations
4. GHG Emissions of Alternatives
5. Reaching Net Zero Energy
Lunch
DRAFT
12:00-12:30
Page 4 of 6
IV. Master Plan Implementation & Next Steps
A. TBL+ Analysis
1. Introduction to TBL+
2. Scorecard Summary for Liquids & Solids
3. Recommended Alternatives to Carry
Forward
B. Envisioning our Plant of the Future
1. Site Plan
a) Immediate: 0-5 Years
b) Near -Term: 5-10 Years
c) Long -Term: 10-20 Years
d) Future: Beyond 20 Years
2. Preliminary CWMP versus Current CIP
a) Immediate: 0-5 Years
b) Near -Term: 5-10 Years
c) Long -Term: 10-20 Years
d) Future: Beyond 20 Years
C. Next Steps - Wastewater Treatment Plant
Master Plan
1. Finalize Alternative Analysis and Refine
Cost Model for Liquid and Solids Treatment
2. Finalize Preliminary CIP Update and
Scheduling of Projects Needs
Carollo - Jim
Hagstrom
CCCSD
CCCSD - JMP
Sudhir
3. Financial Evaluation of CIP Needs Pardiwala
(RFC)
4. Public Outreach Emily Barnett
a) Public Outreach Approach
b) Develop a Public Outreach
Strategy for Rate Study and its
Recommendations
DRAFT
12:30-1:55
Page 5 of 6
Topic Lead Time
D. Next Steps - Collection System Master Plan CCCSD/Carollo
1. Discuss Asset Management Program
Recommendations:
a) Large Diameter Pipes
b) Forcemains
c) Long -Term Flow Monitoring
d) Lift Stations
2. Finalize InfoWorks® Model Calibration
and Capacity Evaluation:
a) Confirm Capacity Projects
3. Finalize InfoMaster® Decision Model:
a) Update Pipeline Replacement Program
V. Closing
DRAFT
CCCSD - J M P/ 1:55-2:00
Roger Bailey
Page 6 of 6